HomeMy WebLinkAbout97-125 Resolution No. 97-125
RESOLUTION
AUTHORIZING EXECUTION OF AMENDMENT NO. 2 TO AN AGREEMENT WITH
CRAWFORD, MURPHY & TILLY, INC.
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN,
- •ILLINOIS, that pursuant to Elgin Municipal Code Section
5 .02 . 020B( 6 ) the City Council hereby finds that an exception
to the requirements of the procurement ordinance is necessary
and in the best interest of the city; and
BE IT FURTHER RESOLVED that Robert O. Malm, Interim City
Manager, and Dolonna Mecum, City Clerk, be and are hereby
authorized and directed to execute Amendment No. 2 to an
Agreement on behalf of the City of Elgin with Crawford,
Murphy & Tilly, Inc . for engineering services for the central
business district roadway lighting and sidewalk rehabilitation
project, a copy of which is attached hereto and made a part
hereof by reference.
s/ Kevin Kelly
Kevin Kelly, Mayor
Presented: May 14 , 1997
Adopted: May 14 , 1997
Omnibus Vote: Yeas 7 Nays 0
Attest:
s/ Dolonna Mecum
Dolonna Mecum, City Clerk
r
CITY OF ELGIN,ILLINOIS
CENTRAL BUSINESS DISTRICT
ROADWAY LIGHTING AND SIDEWALK REHABILITATION PROJECT
ENGINEERING SERVICES AGREEMENT AMENDMENT NO. 2
This Amendment No. 1 entered into this /- 1/l_ day of`lk ldL , 1997, by and between the City of
Elgin, an Illinois Municipal Corporation(hereinafter referred to a "CITY"), and Crawford, Murphy &
Tilly,Inc.,Consulting Engineers,(herein after referred to as"ENGINEER"),shall modify that Agreement
dated February 29, 1996,whereby the ENGINEER was engaged by CITY to perform certain professional
services in connection with the preparation of plans, specifications, estimates of cost, and construction
related engineering services for the Central Business District - Roadway Lighting and Sidewalk
Rehabilitation Project(hereinafter referred to as"PROJECT").
Whereas the CITY desires to include the payments to the ENGINEER under paragraph IV C of the
Agreement in connection with preparation of plans, specifications and estimate of cost for the
rehabilitation of the roadway lighting and sidewalks along Highland Avenue between State Street and
Center Street and replace the lighting on Spring Street between Highland Avenue and East Chicago Street
as part of the Project.
In response to these additional services,certain revisions must be made to the Agreement. In compliance,
therefore,the terms and conditions of the agreement are modified as specifically set out below. All other
parts of the Agreement remain unchanged.
SECTION IV of the AGREEMENT is hereby amended to replace paragraph C.and add paragraph G and
H.
C. Inclusive of paragraph IV A,IV B,IV D, IV E,and IV F,this agreement shall be in the total amount
not to exceed $208,000.00.
G. For services provided in connection with the preparation of plans, specifications and estimate of cost
for the rehabilitation of the roadway lighting and sidewalks along Highland Avenue between State
Street and Center Street,and replace the lighting on Spring Street between Highland Avenue and East
Chicago Street, The ENGINEER shall be reimbursed in accordance with the Schedule of Hourly
Charges, dated January 1997, included as Attachment D, with the total fee not to exceed
$60,000.00 regardless of the actual cost incurred by the ENGINEER unless substantial modification
to the scope of work are authorized by the CITY through a change order or amendment.
H. Attachment A, Scope of Services of the contract will be supplemented by the following tasks which
correspond to the attached estimate of levels of effort and associated cost worksheet labeled
Attachment D:
1. The project limits have been revised to include the preparation of plans, specification and cost
estimate to rehabilitate the roadway lighting and sidewalks along Highland Avenue between State
Street and Center Street,and replace the lighting on Spring Street between Highland Avenue and
East Chicago Street.
2. The same scope of engineering services listed in the original contract shall be utilized for the work
along Highland Avenue.
96265-01-08 -1- City of Elgin
IN WITNESS WHEREOF, the undersigned have placed their hands and seals upon and executed this
Agreement in triplicate as though each copy hereof was an original and that there are no other oral
agreements that have not been reduced to writing in this statement.
For the CITY:
ATTEST: THE CITY OF ELGIN, ILLINOIS
By i�(/ / e -- By
City Clerk City Manager
(SEAL) (SEAL)
For the ENGINEER:
Dated this day of ,A.D., 1997.
ATTEST: CRAWFORD,MURPHY& TILLY, INC.
By By / ..
Brian R. Welker, P.E. Bernard D. Held, P.E.
Associate &Asst. Office Manager Associate & Asst. Office Manager
96265-01-08 -2- City of Elgin
CITY OF ELGIN, ILLINCAS
CENTRAL BUSINESS DISTRICT ROADWAY LIGHTING, TRAFFIC SIGNAL AND SIDEWALK REHABILITATION 1
HIGHLAND AVENUE AND SPRING STREET DESIGN ENGINEERING SERVICES
EMPLOYEE CLASSIFICATION AND ESTIMATE OF MANHOURS
PROJECT SENIOR SR.ENGINEER ENGINEERING WORD
ELEMENT OF WORK PRINCIPAL ENGINEER ENGINEER ENGINEER TECHNICIAN TECHNICIAN PROCESSOR TOTAL
Kick-Off Meeting&Data Gathering 1 8 8 17
Communications with Businesses&Owners 20 • 8 4 42
Field Topographic Surveys 2 8 20 140 170
Vault Surveys&Investigation 28 56 2 90
I Develop Base Sheets 6 16 40 2 64
Design Street Lighting&Traffic Signals 8 84 32 148
Design Sidewalk&Vault Closures 20 84 _ 24 2 140
Sequence of Construction/Traffic Control _ 1 12 20 _ 20 2 55
Preliminary Contract Documents 2 28 12 54 80 10 190
Final Contract Documents 2 24 4 24 32 4 90
Project Bidding&Award 8 8 16
Preconstruction Conference 6 6 2 14
SUB-TOTAL DESIGN 6 162 24 376 20 368 28 1036
1997 HOURLY RATES $108.00/hr $89.00 $75.00 $61.00 $60.00 $44.00 $38.00 -
SUB-TOTAL LABOR AMOUNT $648.00 $14,418.00 $1,800.00 $22,936.00 $1,200.00, $16,192.00 $1,064.00 $58,258.00
Project Expenses: 1. Travel :25 trips x 50 miles/trip x$0.31/mile = $387.50
2. Project Photos: 8 Rolls x$14.00/Roll = $112.00 I
3. Printing: 30 sets plans x 21 sheets/set x$1.25/s /sht. = $787.50
30 sets specs x 150 sheets/set x 0.10/sht = $450.00
Sub-total Expenses = $1,737.00
Estimated Design Engineering Cost for Highland Avenue=$59,995.00 USE: $60,000.00
East Chicago Design and Construction Engineering Cost-per original agreement $148,000.00
Revised Total Engineering Contract $208,000.00
J:\9626501\EXHIBIT\ELG SCH.WK4 ATTACHMENT D
c.4 OF Etc
ti Agenda Item No.
i
City of Elg n
0�,,a Tl D 10`
April 16 , 1997
TO: Mayor and Members of the City Council
FROM: Robert 0. Malm, Interim City Manager
SUBJECT: Central Business District Street Lights and
Sidewalk Agreement for Engineering Services
on Highland Avenue
PURPOSE
The purpose of the memorandum is to provide the Mayor and
members of the City Council with information to consider
Amendment #2 to an agreement with Crawford, Murphy and Tilly,
Inc. , for the preparation of plans, specifications and cost
estimates for expanding the CBD Lighting project to Highland
Avenue.
BACKGROUND
The engineering of the Central Business District Highland
Avenue Lighting Project is included with the 1997 Capital
Improvement Program. The project limits include Highland
Avenue from Illinois Route 31 to Center Street and Spring
Street from Chicago Street to Highland Avenue as shown on
Exhibit A. The project will include the installation of
approximately 40 ornamental street lights and removal and
replacement of sidewalk. Construction is anticipated during
1998 .
There are 10 known sidewalk vaults within the project limits .
Sidewalk vaults will be filled whenever feasible. The
engineer and the City, with the cooperation of Debbie Nier and
the New Century Partnership for Elgin (NCPE) , will work with
each property owner to be sure inconvenience is minimized and
an efficient work schedule can be realized.
The subject Amendment #2 to the agreement is for engineering
services only. Construction inspection services will be
negotiated with the engineer when the construction plans are
completed. The proposed agreement will be amended to include
construction service-related fees and presented to the City
Council concurrently with the contract award for actual
construction.
The proposed Amendment #2 is attached as Exhibit B. CMT' s
original Agreement and Amendment #1 are included as Exhibit C.
CBD Street Lights and Sidewalk Agreement
April 16 , 1997
Page 2
As noted in Exhibit C, the Engineering cost for Chicago Street
was $86 ,422 .
The original agreement covered approximately 2, 500 feet of
street including Chicago Street, N. Grove Avenue, Douglas
Avenue and DuPage Court. At $86 ,422 , the cost per foot is
$34 . 60 per foot.
The cost of Amendment #2, as explained further in the
financial impact, is $60, 000 . Amendment #2 covers
approximately 2,000 feet of street including the
aforementioned streets . At $60,000, the cost per foot of
Amendment #2 is $30 per foot.
The procurement ordinance allows an existing contract to be
expanded instead of again seeking competitive proposals . A
finding by two-thirds vote of City Council is necessary if the
City Council chooses to proceed with this option. The finding
must explain why the exception is in the best interest of the
City.
The proposed amendment with CMT is a superior option to
requesting proposals from other Engineering firms for the
following reasons :
1) CMT now has extensive background dealing within the
City' s problems in downtown Elgin including vaults , old
utilities, lack of parking and heavy traffic .
2 ) CMT has established a relationship with the New Century
Partnership for Elgin.
3) The proposal system would delay the completion of the
engineering until the 1st quarter of 1998 . This would
make construction budgeting difficult.
4 ) CMT provided Engineering services for the Chicago St.
CBD Lighting project.
COMMUNITY GROUPS/INTERESTED PERSONS CONTACTED
New Century Partnership of Elgin.
DIFINANCIAL IMPACT
Amendment #2 is in the amount of $60,000 . Adequate funds
exists to cover this amendment. The City budgeted $180, 000
from the Riverboat Lease Fund (276-0000-791 . 93-80 project
#334001) for the CBD Lighting project. Of this $180, 000
budget, $120, 000 was committed to the construction of street
lights and sidewalk replacement on Douglas Avenue and the
remaining, $60,000 was to be utilized for engineering design
of the Highland Avenue portion of the project.
CBD Street Lights and Sidewalk Agreement
April 16 , 1997
Page 3
Funding:
Account Number Project Number Amount
275-0000-791 . 93-80 334001 $644, 000
275-0000-791 . 93-80 339547 80, 000
275-0000-791 . 93-80 339548 49 , 676
276-0000-791 . 93-80 334001 180, 000
Total Funding $953, 676
Project Costs :
Construction A. Lamp Concrete $736 , 855
Design & Construction Engineering
Crawford, Murphy and Tilly
(Chicago Street) 148, 000
Courier News - Bid Publication 616
Proposed Design Engineering Amendment #2
Crawford, Murphy and Tilly 60, 000
Total Project Costs $945, 471
Balance Remaining $ 8,205
LEGAL IMPACT
None.
ALTERNATIVES
Reject the amendment and direct staff to request proposals for
engineering services .
CBD Street Lights and Sidewalk Agreement
April 16, 1997
Page 4
RECOMMENDATION
It is recommended that City Council find that proceeding with
Amendment #2 to the agreement with Crawford, Murphy and Tilly,
dated February 29 , 1996, is necessary and in the best interest
of the City. If authorized, Amendment #2 would increase the
engineering service agreement with CMT by a not-
to-exceed amount of $60, 000 bringing the total amount to
$208, 000 .
Respectfully submitted,
(110.)-2? -1
David L. Lawry, P.E.
D' ec or of Public W• s
Rob rt . Malm
Interim City Manager
JE/do
Attachments
Exhibit A
CBD Street Lighting and Sidewalk
Highland Avenue
. ,
. .. ,
C. B. D. LIGHTING PROJECT
I I I lI I
GENEVA ST.
in
cr IIPP /
a
a
CENTER ST.
•I', ill
S' W z
0 0
:'W a J
VI Q VI pia• VI D 4
N. r ;?SPRINGrST.'- S. SPRING ST.
`
hi, 0
x ¢ z Itt a 0
cr t- g i! z-Iu
z o 0 0=to-
Ji-
0
&A
OOUGLAS AVE. •
0�• /
OJ6 �\.1 P
F( VP
N
NO title 0A T.
/ SCALE I O`I.
'•,+-4'4,4111. / ,
I / t'L�,; 51.1
/ /
1 ; City of Elgin Agenda Item No.
-}. ,. �
0 "
kITLDt��
October 10, 1997
TO: Mayor and Members of the City Council
FROM: Robert O. Malm, Interim City Manager
SUBJECT: Central Business District (CBD) Street Light and
Sidewalk Project Acceptance and Change Order No. 1
PURPOSE
The purpose of this memorandum is to provide the Mayor and
members of the City Council with information to consider
acceptance of the subject street lighting and sidewalk im-
provement project .
BACKGROUND
The CBD lighting and sidewalk improvements are included in the
1996 budget in the amount of $724, 000 . 00 . The City Council
awarded the project to A-Lamp Concrete on October 9, 1996 in
the amount of $736, 855 . 00 . A sketch showing the limits of the
project is included as Attachment A. The project included the
removal and replacement of the existing street lights and
deteriorated sidewalk. Twenty-nine sidewalk vaults located
within the project limits were closed. Twenty-two thousand
square feet of sidewalk was replaced.
The final pay estimate and Change Order No. 1 are included as
Attachment B.
COMMUNITY GROUPS/INTERESTED PERSONS CONTACTED
None .
FINANCIAL IMPACT
The final contract amount with A-Lamp Concrete is as follows :
Original Contract $736, 855 . 00
QuantityAdjustments (-) 45, 048 . 00
ChangeOrderNo. l (+) 10, 914 . 24
Final Contract $702, 721 . 24
CBD Street Light and Sidewalk Project
October 10, 1997
Page 2
The City approved funds for this project as follows :
Construction
Project
Fund Account Number Number Amount
Elgin Riverboat 275-0000-791 . 93 . 80 334001 $545, 060 . 00
Elgin Riverboat 275-0000-791 . 93-80 339547 80, 000 . 00
Grand Victoria 276-0000-791 . 93-80 334001 111, 795 . 00
Lease
Sub Total $736, 855 . 00
Engineering and Advertising
Project
Fund Account Number Number Amount
Elgin Riverboat 275-0000-791 . 93-80 334001 $ 98, 940 . 00
Elgin Riverboat 275-0000-791 . 93-80 440584 $ 49, 676 . 00
Sub Total $148, 616 . 00
Total $885, 471 . 00
The final project costs are as follows :
1 . A-LampConstruction $702, 721 . 24
(Construction)
2 . CrawfordMurphy& Tilly 148, 000 . 00
(Engineering and Inspection)
3 . Miscellaneous 13, 301 . 10
(Advertising, oil tank removal, off-street
parking for contractor, repair of facades,
non-relatedelectricalwork, new signage)
$864, 022 . 43
The project was completed for $21, 448 . 57 below budget .
LEGAL IMPACT
\ Done .
ALTERNATIVES
None.
CBD Street Light and Sidewalk Project
October 10, 1997
Page 3
RECOMMENDAT ION
It is recommended that the City Council authorize execution of
Change Order No. 1 in the amount of $10, 914 .24 . It is also
recommended that the City Council accept the completed
project . •
Respectfully submitted,
David L. Lawry,
D' tor of Public Works
41k,,
<Rpbert O. Malm
In erim City Manager
amp
Attachments
I I I I I I I I I /
C)
NORTH ST. '
N O
c V/ PARK ST. •
nZ \./V
\ ➢ o
r
m ➢ •
to Q
\ DEXTER AVE. •
' 1 ➢
i
m I
\ DIVISION ST. G.)
T
\ HIGHLAND AVE.
O i,1. ri
;z Z z rn Z
9L 1 y r , m
II In A ➢ G.)
1 .f ,..''l 7! / .. ip`y,,I• Y(• T•
` C t t f e r ...:
N r j .i bT;l/' • w,Fr+?'d' ^yy 4 >,ah N.�, .,r R V S,,&;S....g S.. ,4I6,•Ah• 1 i'._ fif . f+.
.r:C ��' to
77,�(1Q6 ..Ease ,
vi LA
1% ' gil
. \ c^q u.
p
�/o Cq O
•P \ p
L(4" DU PAGE ST.
p o
v( T
(n- t
y FULTON ST.