AUTHORIZING EXECUTION OF AMENDMENT NO. 1 TO AN AGREEMENT WITH
CRAWFORD, MURPHY & TILLY, INC. FOR ENGINEERING SERVICES
FOR THE CENTRAL BUSINESS DISTRICT
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN,
ILLINOIS, that Richard B. Helwig, City Manager, and Dolonna
Mecum, City Clerk, be and are hereby authorized and directed
to execute Amendment No. 1 to an Agreement on behalf of the
City of Elgin with Crawford, Murphy & Tilly, Inc. , for
engineering services for the roadway lighting and sidewalk
rehabilitation project in the Central Business District, a
copy of which is attached hereto and made a part hereof by
reference.
s/ Kevin Kelly
Kevin Kelly, Mayor
Presented: October 23, 1996
Adopted: October 23, 1996
Omnibus Vote: Yeas 7 Nays 0
Attest:
s/ Dolonna Mecum
Dolonna Mecum, City Clerk
w
I
CITY OF ELGIN, ILLINOIS
CENTRAL BUSINESS DISTRICT
ROADWAY LIGHTING AND SIDEWALK REHABILITATION PROJECT
ENGINEERING SERVICES AGREEMENT AMENDMENT NO. 1
This Amendment No. 1 entered into this 0` 9tX, day of ast, 1996, by and between
the City of Elgin, an Illinois Municipal Corporation (hereinafter referred to as "CITY") and
Crawford, Murphy & Tilly, Inc., Consulting Engineers, (hereinafter referred to as
"ENGINEER"), shall modify that Agreement dated February 29, 1996, whereby the ENGINEER
was engaged by CITY to perform certain professional services in connection with the preparation
of plans, specifications, estimates of cost, and construction related engineering services for the
Central Business Disrict - Roadway Lighting and Sidewalk Rehabilitation Project (hereinafter
referred to as "PROJECT").
Whereas the payment to the ENGINEER for construction engineering related services was not
included in the Agreement, and,
Whereas the CITY desires to include the payments to the ENGINEER under paragraph IV C of
the Agreement in connection with the construction administration, construction observation and
quality control of the construction phase of the PROJECT.
In response to these additional services, certain revisions must be made to the Agreement. In
compliance, therefore, the terms and conditions of the agreement are modified as specifically
set out below. All other parts of the Agreement remain unchanged.
SECTION IV of the AGREEMENT is hereby amended to replace paragraph C. and add
paragraph D, E and F.
C. Inclusive of paragraph IV A, IV B and IV E, this agreement shall be in the total amount
not to exceed $148,000.00.
D. For services provided in connection with the construction administration, construction
observation, and quality control of the construction phase of the PROJECT, the ENGINEER
shall be reimbursed in accordance with the Schedule of Hourly Charges, dated January 1996,
included as Attachment C of the original agreement, with the total fee not to exceed $70,000.00
regardless of the actual cost incurred by the ENGINEER unless substantial modification to the
scope of work are authorized by the CITY through a change order or amendment.
96265-01-06 -1- City of Elgin
E. The compensation set forth in Paragraph C above does not include any engineering
service after the original construction contract completion date for the PROJECT. In the event
the CITY approves and authorizes an extension of time for the Contractor to complete the
construction work, the compensation for engineering services set forth in Paragraph C shall be
increased for the additional services required for the ENGINEER. In the event the Contractor
does not complete the construction work within the contract completion time including any
extensions thereof granted by the CITY, the CITY shall pay the ENGINEER extra compensation
at the ENGINEERS' hourly rates until the PROJECT construction work has been accepted by
the CITY.
F. The compensation set forth in Paragraph C does not include any engineering services
regarding warranty work by the Contractor after the PROJECT, or parts thereof, has been
accepted for operational use by the CITY. In the event that warranty work is required of the
Contractor, the CITY shall pay the ENGINEER extra compensation at the ENGINEERS' hourly
rates to assist the CITY in enforcing the Contractor's guaranty to repair or replace defective
work within the warranty time stated in the Construction Contract Documents for the
PROJECT.
Attachment A, Scope of Services of the original contract will be supplemented by the following
tasks which correspond to the attached estimate of levels of effort and associated cost worksheet:
Construction Phase
1. Schedule preconstruction conference.
2. Attend and facilitate preconstruction conference.
3. Coordinate schedule with contractor
4. Perform initial construction layout (Subsequent layout, if necessary, will be the
contractor's responsibility).
5. Full time resident engineer duties per the City requirements of Construction
Services including:
a. Inspection Daily Reports
b. Weekly Reports
c. Monthly Progress Reports
d. Construction Observation
e. Quantity and Material Record
f. Preparation of Partial Pay Estimates
96265-01-06 -2- City of Elgin
g. Preparation of Extra Work and Change Orders, as necessary
h. Facilitate Final Inspection
I. Facilitate Weekly Progress/Coordination Meetings
j. Material Testing
k. Review Shop Drawings
1. Conduct Weekly Coordination with Property Owners
6. Record Drawing Surveys/Submit Record Drawings/Project Close-out
All other provisions of the AGREEMENT shall remain in full force and effect.
96265-01-06 -3- City of Elgin
IN WITNESS WHEREOF, the undersigned have placed their hands and seals upon and executed
this Agreement in triplicate as though each copy hereof was an original and that there are no
other oral agreements that have not been reduced to writing in this statement.
For the CITY:
ATTEST: THE CITY OF ELGIN, ILLINOIS
ByQ6k(-49-ywkBy 1`5.`jo.—.0 i— �t
City Clerk City Manager
(SEAL) (SEAL)
,f
For the ENGINEER:
7*
Dated this 2� day of , , A.D., 1996.
ATTE CRAWFORD, MURPHY & TILLY, INC.
By
/4 s"-''e
Brian R. Welker, P.E. Bernard D. Held, P.E.
Associate & Asst. Office Manager Associate & Asst. Office Manager
96265-01-06 -4- City of Elgin
CONSTRUCTION SERVICES
•
•
1 .
Liaison and Contract Control
as the CITY' s representative with duties,
responsibilities and
authority as assigned
limitations of
in the Construction Contract Documents, and advise and
confer with CITY officials during construction and issue
the CITY' s authorized instructions to the Contractor.
the Contractor in understanding the intent of the
Ass_s �. City' s
Contract Documents . Serve as • the Cit s
liaison with other local agencies such as utility
CITY S on-site representative,entat i ve, etc .
companies , businesses , C" r
•
2 . On-Site Revjew of Work •
• Conduct continuous and full-time on-site observations of
the work in progress to determine that
the PROJECT is
proceeding in accordance with the Construction Contract
and that completed work will conform to the
Documents •-,- y DOCL',T.eP.tS .
requirements of the Construction Contrac�
•
instruct Contractor to correct any work believed to be
unsatisfactory, faulty or defective, not conforming to the
requirements of the Construction Contract Documents , or
does not meet the requirements of any inspections , tests ,
or approval required to be made and report same 5 oc;he
CITY; and advise CITY of action taken or if any
l
testing or inspection will be required .
. Verifythat tests are conducted as required by the
Construction Contract Documents and in the. presence of the
Contractors maintain and
required personnel, and that submit record, and
; adequate records thereof; observe,
report to the CITY appropriate details relative to the test
procedures .
Perform or cause to have performed as applicable, all
required field tests such as concrete tests , soil
compaction tests and • ensure such tests are made as
specified. Analyze the results of all field and laboratory
tests to determine the suitabilitywith the
requirements of the Construction Contract Documents .
Accompany visiting inspectors representing public or other
agencies having jurisdiction over the project, record the
outcome of these inspections and report to the CITY .
the
Stake-out construction lines and grorades the and
rDrawingst and
Contractor with
interpretation
• Specifications .
•
Attachment Al
dailyreports of construction
Prepare and submit detailed
progress .
3 . Contractor Succesti ons and Requests
�- for
Consider and evaluate suggestions and requests
modifications in drawings r s and specifications which may be
the Contractor and make recommendations to the
submitted by final decision .
CITY with any time or cost implications for
4 . Sloo Drawincs
drawing submittal requirements and assist
Develop shop _
Contractor in development of submittal schedules . Review
and monitcr compliance with submittal schedules .
s
drawings anddsamples , the resultt
Review and approve shop draw n other datawhich any
tests and inspections and
of d ,r. but only for conformance
Contractor is require to submit,
the pro project and compliancewith
withthe design concept of J - Contract
e C 5_ givenin the Construction
the information not be construed as relieving
Such review shall Documents . ,-r,,__
the responsibility to meet requirements
the Contractor ofL
of the Construction Contract Documents . Determine the
substitute materials and equipment
acceptability of substitute ( for
by the Contractor; and receive and review
proposed • the specifications)
general content as required by
maintenance and operating instructions , guarantees , bonds
which are to be assembled by
and certificates of. inspection re the arse.bledlOy
the Contractor(s) in accordance with
Contract Documents .
,- submittal and approval
Record and maintain a shop drawing ittals val
log and notify
the Contractor whenever subm
lacking or untimely.
5 . Schedules
Prepare a final Primavera typContra tort, andscobtain the
with
the participation of the
Contractor' s approval of the construction
schedule. oA
hdule shof all shop also drawing be reparedssbynsthe Contractor and
values
approved by the engineer.
Work with the Contractor to maintain a workable updated
Primavera type construction schedule the ssass maintained
a intainedrequire and
monitored weekly as construction progr
• the Construction Contract Documents . Reporpro_oo progress
d by and
schedule deviations and corrective
measuresContractor to the CITY.
1 - Attachment A2
•
6 . Job Meetincs
Conduct . weekly progress meetings with all parties as
- required by the Construction Contract Documents to review
construction progress, design interpretations and overall
progress . Prepare,
maintain, and circulate copies of
minutes thereof . Arrange a schedule of on-siterjoorsork
meetings with the General Contractor and
review day-to-day requirements and
problems . Prepare,
maintain, and circulate copies of minutes thereof .
7 . Contract Administration and Records
Administration and
Contract
Handle .all day-to-day the job site orderly
associated correspondence . Maintain at the
shop
files for correspondence, reports of. job conferences,
reproductions
drawings , and of
samples submissions , i
original Construction Contract Documents including tall
change orders, field orders , additional draw_ncs
addenda, the Construction
issued subsequent to the execution of L,� projectut
Contract Documents, progress reports , and other
related documents .
8 . Re ports
Furnish
written reports to the CITY on a biweekly basis of
Progress of the work and the Contractor' s compliance with
the approved progress schedule and schedule of shop drawing
submissions . '
9 . Contractor Pay Requests
L for payments as
Review the Contractor ' s requests of the
construction work progresses , and advise CITYthecco f the
amounts
due and payable to the Contractor in
T
with the terms of the Construction Contract Documents .
10 . Chanae Orders
•
Perform evaluation of .proposed Construction Contract Change
Orders and submit recommendation for approval or denial to
the CITY. Prepare Construction Contract Change Orders when
• authorized by the CITY.
11 . rnment Policies
'Review the Contractor' s compliance with governmental
mandated programs . Compliance wih be OSHA requirements and
general safety provisionswillthe C reviewned by ractor as
an
independent safety officer retained by
part of the construction work. The
will ysu mit ffiCe riwill
visit the job site periodicall y EER.
reports to the CITY, Contractor, and ENGIN
Attachment A3
12 . Record Drawings
red
Prepare record drawings edw construction work which hich show field Lthe
dimensions of the complede
ENGINEERS consider lficant record d draw d n gs land tall eq ipment
he CITY with
one set of reproducible
. operation and maintenance manuals within ninety ( 90) days
of the PROJECT completion.
13 . Final Completion
Conduct a final inspection d of the PROeJECT to the ith Contractor the CITY nd
the Contractor, an
prepare and g
final punch list. Issue an opinion of satisfactory
completion for acceptance of the PROJECT by the CITY.
Process the Contractor' s final request for payment.
•
•
•
Attachment A4
CITY OF ELGIN, ILLINOIS
CENTRAL BUSINESS DISTRICT
ROADWAY LIGHTING
AND
SIDEWALK REHABILITATION PROJECT
PROJECT CONSTRUCTION
Based on the aforementioned breakdown of manhours, we estimate the cost of construction services
detailed in our amendment as follows:
Employee Estimated 1996
Classification Manhours Hourly Rate Amount
Principal 5 $105.00 $525
Project Engineer 142 $86.00 $12,212
Engineer 840 $61.00 $51,240
Word Processor 32 $37.00 $1,184
SUB-TOTAL LABOR 1,019 $65,161
PROJECT EXPENSES:
1. Travel:
129 trips x 50 miles/trip x $0.31 /mile = $2,000
2. Subsistence:
100 days x $5.00 /day = $500
3. Project Photos:
10 rolls at $14.00/roll = $140
4. Printing: _ $200
5. Geotechnical Testing: Estimate = $2,000
SUBTOTAL EXPENSES = $4,840
ESTIMATED CONSTRUCTION ENGINEERING COST $70,001
USE NOT-TO-EXCEED = $70,000
DESIGN ENGINEERING (Per original agreement) $78,000
REVISED TOTAL ENGINEERING CONTRACT $148,000
i . 1
EltthiEllarl,:9,„:::
Agenda Item No.
"..T.1"c
(,_
October 2 , 1996
TO: Mayor and Members of the City Council
FROM: Richard B. Helwig, City Manager
SUBJECT: Amendment No. 1 to an Agreement with
Crawford, Murphy and Tilly, Inc.
PURPOSE
The purpose of the memorandum is to provide the Mayor and members
of the City Council with information to consider Amendment No. 1
to an agreement with Crawford, Murphy and Tilly, Inc. (CMT) which
will add the fee for construction related engineering and inspec-
tion services to the Central Business District (CBD) Lighting and
Sidewalk project.
BACKGROUND
At its meeting of February 28, 1996 , City Council authorized an
agreement with CMT, for the preparation of plans, specifications ,
estimates, bidding and construction engineering services , for the
CBD Lighting and Sidewalk Improvements . Because the scope of the
construction services was not known when the agreement was
approved, only the design aspects of the project were included in
the cost of the agreement.
An amendment to CMT' s agreement has been prepared and is included
as Attachment A. CMT' s current Agreement and the Council Memoran-
dum is included as Attachment B for your information. The con-
struction of the CBD Lighting and Sidewalk improvements is on the
agenda for award by City Council on October 9, 1996 .
COMMUNITY GROUPS/INTERESTED PERSONS CONTACTED
None.
FINANCIAL IMPACT
The Amendment No. 1 is in the amount of $70,000 .00, and is based
. upon a construction period from October 21, 1996 to December 6 ,
1996 , and from March 17 , 1997 to May 30, 1997 . CMT' s initial
design fee was approved at $86 ,422 . To complete the design
aspects of the project, CMT only utilized $78,000 . CMT' s adjust-
ed total contract amount will now equal $148,000 . 00 .
t
'Amendment No. 1 to an Agreement with
Crawford, Murphy and Tilly, Inc .
Page 2
Project Costs :
Construction A. Lamp Concrete $736 , 855
Design & Construction Engineering
Crawford, Murphy and Tilly 148,000
Courier News - Bid Publication 616
Total Project Costs $885 , 471
Funding:
Account Number Project Number Amount
275-0000-791 . 93-80 334001 $644 , 000
275-0000-791 . 93-80 339547 80, 000
275-0000-791 . 93-80 339548 49 , 676
Total Funding $773 , 676
Difference $111 , 795
There is $180,000 in the proposed 1997 budget under Riverboat
Lease to cover the above $111 ,795 difference as well as to
provide additional funds for engineering future CBD sidewalk and
lighting improvements on Highland Avenue.
LEGAL IMPACT
None.
ALTERNATIVES
None .
RECOMMENDATION
It is recommended that the City Council authorize the City
Manager to execute Amendment No. 1 to the Agreement with Craw-
ford, Murphy and Tilly, Inc . , dated February 29 , 1996 , in the
not-to-exceed amount of $70 ,000 and adjust the total value of the
amended agreement to $148, 000 .