HomeMy WebLinkAbout96-300 Resolution No. 96-300 RESOLUTION AUTHORIZING EXECUTION OF AMENDMENT NO. 1 TO AN AGREEMENT WITH CRAWFORD, MURPHY & TILLY, INC. FOR ENGINEERING SERVICES FOR THE CENTRAL BUSINESS DISTRICT BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that Richard B. Helwig, City Manager, and Dolonna Mecum, City Clerk, be and are hereby authorized and directed to execute Amendment No. 1 to an Agreement on behalf of the City of Elgin with Crawford, Murphy & Tilly, Inc. , for engineering services for the roadway lighting and sidewalk rehabilitation project in the Central Business District, a copy of which is attached hereto and made a part hereof by reference. s/ Kevin Kelly Kevin Kelly, Mayor Presented: October 23, 1996 Adopted: October 23, 1996 Omnibus Vote: Yeas 7 Nays 0 Attest: s/ Dolonna Mecum Dolonna Mecum, City Clerk w I CITY OF ELGIN, ILLINOIS CENTRAL BUSINESS DISTRICT ROADWAY LIGHTING AND SIDEWALK REHABILITATION PROJECT ENGINEERING SERVICES AGREEMENT AMENDMENT NO. 1 This Amendment No. 1 entered into this 0` 9tX, day of ast, 1996, by and between the City of Elgin, an Illinois Municipal Corporation (hereinafter referred to as "CITY") and Crawford, Murphy & Tilly, Inc., Consulting Engineers, (hereinafter referred to as "ENGINEER"), shall modify that Agreement dated February 29, 1996, whereby the ENGINEER was engaged by CITY to perform certain professional services in connection with the preparation of plans, specifications, estimates of cost, and construction related engineering services for the Central Business Disrict - Roadway Lighting and Sidewalk Rehabilitation Project (hereinafter referred to as "PROJECT"). Whereas the payment to the ENGINEER for construction engineering related services was not included in the Agreement, and, Whereas the CITY desires to include the payments to the ENGINEER under paragraph IV C of the Agreement in connection with the construction administration, construction observation and quality control of the construction phase of the PROJECT. In response to these additional services, certain revisions must be made to the Agreement. In compliance, therefore, the terms and conditions of the agreement are modified as specifically set out below. All other parts of the Agreement remain unchanged. SECTION IV of the AGREEMENT is hereby amended to replace paragraph C. and add paragraph D, E and F. C. Inclusive of paragraph IV A, IV B and IV E, this agreement shall be in the total amount not to exceed $148,000.00. D. For services provided in connection with the construction administration, construction observation, and quality control of the construction phase of the PROJECT, the ENGINEER shall be reimbursed in accordance with the Schedule of Hourly Charges, dated January 1996, included as Attachment C of the original agreement, with the total fee not to exceed $70,000.00 regardless of the actual cost incurred by the ENGINEER unless substantial modification to the scope of work are authorized by the CITY through a change order or amendment. 96265-01-06 -1- City of Elgin E. The compensation set forth in Paragraph C above does not include any engineering service after the original construction contract completion date for the PROJECT. In the event the CITY approves and authorizes an extension of time for the Contractor to complete the construction work, the compensation for engineering services set forth in Paragraph C shall be increased for the additional services required for the ENGINEER. In the event the Contractor does not complete the construction work within the contract completion time including any extensions thereof granted by the CITY, the CITY shall pay the ENGINEER extra compensation at the ENGINEERS' hourly rates until the PROJECT construction work has been accepted by the CITY. F. The compensation set forth in Paragraph C does not include any engineering services regarding warranty work by the Contractor after the PROJECT, or parts thereof, has been accepted for operational use by the CITY. In the event that warranty work is required of the Contractor, the CITY shall pay the ENGINEER extra compensation at the ENGINEERS' hourly rates to assist the CITY in enforcing the Contractor's guaranty to repair or replace defective work within the warranty time stated in the Construction Contract Documents for the PROJECT. Attachment A, Scope of Services of the original contract will be supplemented by the following tasks which correspond to the attached estimate of levels of effort and associated cost worksheet: Construction Phase 1. Schedule preconstruction conference. 2. Attend and facilitate preconstruction conference. 3. Coordinate schedule with contractor 4. Perform initial construction layout (Subsequent layout, if necessary, will be the contractor's responsibility). 5. Full time resident engineer duties per the City requirements of Construction Services including: a. Inspection Daily Reports b. Weekly Reports c. Monthly Progress Reports d. Construction Observation e. Quantity and Material Record f. Preparation of Partial Pay Estimates 96265-01-06 -2- City of Elgin g. Preparation of Extra Work and Change Orders, as necessary h. Facilitate Final Inspection I. Facilitate Weekly Progress/Coordination Meetings j. Material Testing k. Review Shop Drawings 1. Conduct Weekly Coordination with Property Owners 6. Record Drawing Surveys/Submit Record Drawings/Project Close-out All other provisions of the AGREEMENT shall remain in full force and effect. 96265-01-06 -3- City of Elgin IN WITNESS WHEREOF, the undersigned have placed their hands and seals upon and executed this Agreement in triplicate as though each copy hereof was an original and that there are no other oral agreements that have not been reduced to writing in this statement. For the CITY: ATTEST: THE CITY OF ELGIN, ILLINOIS ByQ6k(-49-ywkBy 1`5.`jo.—.0 i— �t City Clerk City Manager (SEAL) (SEAL) ,f For the ENGINEER: 7* Dated this 2� day of , , A.D., 1996. ATTE CRAWFORD, MURPHY & TILLY, INC. By /4 s"-''e Brian R. Welker, P.E. Bernard D. Held, P.E. Associate & Asst. Office Manager Associate & Asst. Office Manager 96265-01-06 -4- City of Elgin CONSTRUCTION SERVICES • • 1 . Liaison and Contract Control as the CITY' s representative with duties, responsibilities and authority as assigned limitations of in the Construction Contract Documents, and advise and confer with CITY officials during construction and issue the CITY' s authorized instructions to the Contractor. the Contractor in understanding the intent of the Ass_s �. City' s Contract Documents . Serve as • the Cit s liaison with other local agencies such as utility CITY S on-site representative,entat i ve, etc . companies , businesses , C" r • 2 . On-Site Revjew of Work • • Conduct continuous and full-time on-site observations of the work in progress to determine that the PROJECT is proceeding in accordance with the Construction Contract and that completed work will conform to the Documents •-,- y DOCL',T.eP.tS . requirements of the Construction Contrac� • instruct Contractor to correct any work believed to be unsatisfactory, faulty or defective, not conforming to the requirements of the Construction Contract Documents , or does not meet the requirements of any inspections , tests , or approval required to be made and report same 5 oc;he CITY; and advise CITY of action taken or if any l testing or inspection will be required . . Verifythat tests are conducted as required by the Construction Contract Documents and in the. presence of the Contractors maintain and required personnel, and that submit record, and ; adequate records thereof; observe, report to the CITY appropriate details relative to the test procedures . Perform or cause to have performed as applicable, all required field tests such as concrete tests , soil compaction tests and • ensure such tests are made as specified. Analyze the results of all field and laboratory tests to determine the suitabilitywith the requirements of the Construction Contract Documents . Accompany visiting inspectors representing public or other agencies having jurisdiction over the project, record the outcome of these inspections and report to the CITY . the Stake-out construction lines and grorades the and rDrawingst and Contractor with interpretation • Specifications . • Attachment Al dailyreports of construction Prepare and submit detailed progress . 3 . Contractor Succesti ons and Requests �- for Consider and evaluate suggestions and requests modifications in drawings r s and specifications which may be the Contractor and make recommendations to the submitted by final decision . CITY with any time or cost implications for 4 . Sloo Drawincs drawing submittal requirements and assist Develop shop _ Contractor in development of submittal schedules . Review and monitcr compliance with submittal schedules . s drawings anddsamples , the resultt Review and approve shop draw n other datawhich any tests and inspections and of d ,r. but only for conformance Contractor is require to submit, the pro project and compliancewith withthe design concept of J - Contract e C 5_ givenin the Construction the information not be construed as relieving Such review shall Documents . ,-r,,__ the responsibility to meet requirements the Contractor ofL of the Construction Contract Documents . Determine the substitute materials and equipment acceptability of substitute ( for by the Contractor; and receive and review proposed • the specifications) general content as required by maintenance and operating instructions , guarantees , bonds which are to be assembled by and certificates of. inspection re the arse.bledlOy the Contractor(s) in accordance with Contract Documents . ,- submittal and approval Record and maintain a shop drawing ittals val log and notify the Contractor whenever subm lacking or untimely. 5 . Schedules Prepare a final Primavera typContra tort, andscobtain the with the participation of the Contractor' s approval of the construction schedule. oA hdule shof all shop also drawing be reparedssbynsthe Contractor and values approved by the engineer. Work with the Contractor to maintain a workable updated Primavera type construction schedule the ssass maintained a intainedrequire and monitored weekly as construction progr • the Construction Contract Documents . Reporpro_oo progress d by and schedule deviations and corrective measuresContractor to the CITY. 1 - Attachment A2 • 6 . Job Meetincs Conduct . weekly progress meetings with all parties as - required by the Construction Contract Documents to review construction progress, design interpretations and overall progress . Prepare, maintain, and circulate copies of minutes thereof . Arrange a schedule of on-siterjoorsork meetings with the General Contractor and review day-to-day requirements and problems . Prepare, maintain, and circulate copies of minutes thereof . 7 . Contract Administration and Records Administration and Contract Handle .all day-to-day the job site orderly associated correspondence . Maintain at the shop files for correspondence, reports of. job conferences, reproductions drawings , and of samples submissions , i original Construction Contract Documents including tall change orders, field orders , additional draw_ncs addenda, the Construction issued subsequent to the execution of L,� projectut Contract Documents, progress reports , and other related documents . 8 . Re ports Furnish written reports to the CITY on a biweekly basis of Progress of the work and the Contractor' s compliance with the approved progress schedule and schedule of shop drawing submissions . ' 9 . Contractor Pay Requests L for payments as Review the Contractor ' s requests of the construction work progresses , and advise CITYthecco f the amounts due and payable to the Contractor in T with the terms of the Construction Contract Documents . 10 . Chanae Orders • Perform evaluation of .proposed Construction Contract Change Orders and submit recommendation for approval or denial to the CITY. Prepare Construction Contract Change Orders when • authorized by the CITY. 11 . rnment Policies 'Review the Contractor' s compliance with governmental mandated programs . Compliance wih be OSHA requirements and general safety provisionswillthe C reviewned by ractor as an independent safety officer retained by part of the construction work. The will ysu mit ffiCe riwill visit the job site periodicall y EER. reports to the CITY, Contractor, and ENGIN Attachment A3 12 . Record Drawings red Prepare record drawings edw construction work which hich show field Lthe dimensions of the complede ENGINEERS consider lficant record d draw d n gs land tall eq ipment he CITY with one set of reproducible . operation and maintenance manuals within ninety ( 90) days of the PROJECT completion. 13 . Final Completion Conduct a final inspection d of the PROeJECT to the ith Contractor the CITY nd the Contractor, an prepare and g final punch list. Issue an opinion of satisfactory completion for acceptance of the PROJECT by the CITY. Process the Contractor' s final request for payment. • • • Attachment A4 CITY OF ELGIN, ILLINOIS CENTRAL BUSINESS DISTRICT ROADWAY LIGHTING AND SIDEWALK REHABILITATION PROJECT PROJECT CONSTRUCTION Based on the aforementioned breakdown of manhours, we estimate the cost of construction services detailed in our amendment as follows: Employee Estimated 1996 Classification Manhours Hourly Rate Amount Principal 5 $105.00 $525 Project Engineer 142 $86.00 $12,212 Engineer 840 $61.00 $51,240 Word Processor 32 $37.00 $1,184 SUB-TOTAL LABOR 1,019 $65,161 PROJECT EXPENSES: 1. Travel: 129 trips x 50 miles/trip x $0.31 /mile = $2,000 2. Subsistence: 100 days x $5.00 /day = $500 3. Project Photos: 10 rolls at $14.00/roll = $140 4. Printing: _ $200 5. Geotechnical Testing: Estimate = $2,000 SUBTOTAL EXPENSES = $4,840 ESTIMATED CONSTRUCTION ENGINEERING COST $70,001 USE NOT-TO-EXCEED = $70,000 DESIGN ENGINEERING (Per original agreement) $78,000 REVISED TOTAL ENGINEERING CONTRACT $148,000 i . 1 EltthiEllarl,:9,„::: Agenda Item No. "..T.1"c (,_ October 2 , 1996 TO: Mayor and Members of the City Council FROM: Richard B. Helwig, City Manager SUBJECT: Amendment No. 1 to an Agreement with Crawford, Murphy and Tilly, Inc. PURPOSE The purpose of the memorandum is to provide the Mayor and members of the City Council with information to consider Amendment No. 1 to an agreement with Crawford, Murphy and Tilly, Inc. (CMT) which will add the fee for construction related engineering and inspec- tion services to the Central Business District (CBD) Lighting and Sidewalk project. BACKGROUND At its meeting of February 28, 1996 , City Council authorized an agreement with CMT, for the preparation of plans, specifications , estimates, bidding and construction engineering services , for the CBD Lighting and Sidewalk Improvements . Because the scope of the construction services was not known when the agreement was approved, only the design aspects of the project were included in the cost of the agreement. An amendment to CMT' s agreement has been prepared and is included as Attachment A. CMT' s current Agreement and the Council Memoran- dum is included as Attachment B for your information. The con- struction of the CBD Lighting and Sidewalk improvements is on the agenda for award by City Council on October 9, 1996 . COMMUNITY GROUPS/INTERESTED PERSONS CONTACTED None. FINANCIAL IMPACT The Amendment No. 1 is in the amount of $70,000 .00, and is based . upon a construction period from October 21, 1996 to December 6 , 1996 , and from March 17 , 1997 to May 30, 1997 . CMT' s initial design fee was approved at $86 ,422 . To complete the design aspects of the project, CMT only utilized $78,000 . CMT' s adjust- ed total contract amount will now equal $148,000 . 00 . t 'Amendment No. 1 to an Agreement with Crawford, Murphy and Tilly, Inc . Page 2 Project Costs : Construction A. Lamp Concrete $736 , 855 Design & Construction Engineering Crawford, Murphy and Tilly 148,000 Courier News - Bid Publication 616 Total Project Costs $885 , 471 Funding: Account Number Project Number Amount 275-0000-791 . 93-80 334001 $644 , 000 275-0000-791 . 93-80 339547 80, 000 275-0000-791 . 93-80 339548 49 , 676 Total Funding $773 , 676 Difference $111 , 795 There is $180,000 in the proposed 1997 budget under Riverboat Lease to cover the above $111 ,795 difference as well as to provide additional funds for engineering future CBD sidewalk and lighting improvements on Highland Avenue. LEGAL IMPACT None. ALTERNATIVES None . RECOMMENDATION It is recommended that the City Council authorize the City Manager to execute Amendment No. 1 to the Agreement with Craw- ford, Murphy and Tilly, Inc . , dated February 29 , 1996 , in the not-to-exceed amount of $70 ,000 and adjust the total value of the amended agreement to $148, 000 . Respectfully submitted, (;:)-David Lawry, Director of P c Works wi t Richard B. Hel g City Manager DLL/do Attachments