Loading...
HomeMy WebLinkAbout96-228 Resolution No. 96-228 RESOLUTION AUTHORIZING EXECUTION OF AMENDMENT NO. 2 TO AN AGREEMENT WITH HAMPTON, LENZINI AND RENWICK, INC. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that Kevin Kelly, Mayor, and Dolonna Mecum, City Clerk, be and are hereby authorized and directed to execute Amendment No . 2 to an Agreement on behalf of the City of Elgin with Hampton, Lenzini and Renwick, Inc. for engineering services for the Route 72 access roadway, a copy of which is attached hereto and made a part hereof by reference. s/ Kevin Kelly Kevin Kelly, Mayor Presented: July 24 , 1996 Adopted: July 24 , 1996 Omnibus Vote: Yeas 6 Nays 0 Attest: s/ Dolonna Mecum Dolonna Mecum, City Clerk PRELIMINARY/CONSTRUCTION ENGINEERING SERVICES AGREEMENT FOR MOTOR FUEL TAX FUNDS Route: Motorola Access Road Section: 96-00157-00-FP Original Contract Value: $75,225.00 Amended Contract Value: $93,725.00 Adjusted Contract Value: $103,510.00 AMENDMENT NO. 2 Whereas, the City of Elgin heretofore entered into a contract dated February 6, 1996, amended May 13, 1996, with Hampton, Lenzini and Renwick, Inc; and Whereas, due to changes in the proposed road alignment to meet request by owners of property to be crossed by the road; and Whereas, the foregoing changes were not anticipated and were not provided for in the original contract; and Therefore, it is necessary to expand the upper limit of compensation to be paid under the contract to cover certain re-survey and re-design services caused by the changes. Whereas, the adjusted upper limit of compensation will exceed the amended contract value by not more than $9,785.00; and Now, therefore, the parties hereto do mutually agree as follows: Under THE ENGINEER AGREES: On page 2, under item 1.g., the requirement for providing street lighting plans and specifications is eliminated. On page 5, change item 9 to read as follows: For paragraphs 1.a., 1.g., and 1.i $82,290.00 For paragraph 1.d. 2,720.00 For paragraph 1.h. 18,500.00 Save as to these provisions, all other terms and conditions of said contract are to remain in full force and effect. Page 1 of 2 - 1 Executed this d ix, day of ,A.D., 1996, by the City of Elgin, State of Illinois, acting by an throu h its City Council. ATTEST: By . ! / I By 2 City Clerk Mayor (SEAL) Executed this `Z day of u , A.D., 1996, by Hampton, Lenzini and Renwick, Inc., 380 Shepard Drive, Elgin, IL 60123, (847) 697-6700. ATTEST: • By � II / _1,L. BY / t ./.6: If Secretary President / (SEAL) Page 2 of 2 Agenda Item No. 1\ (1 June 27, 1996 TO: Mayor and Members of the City Council FROM: Richard B. Helwig, City Manager SUBJECT: Motorola Access Roadway Amendment No. 2 with Hampton, Lenzini and Renwick, Inc. PURPOSE The purpose of the memorandum is to provide the Mayor and members of the City Council with information to consider amending an agreement with Hampton, Lenzini and Renwick, Inc. (HLR) for additional design work associated with the changed roadway alignment, in the amount of $9 ,785 . 00 . BACKGROUND On January 24 , 1996, the City Council authorized an agreement with HLR for the preparation of plans, specifications, and estimates for the Motorola Access Roadway. On April 24 , 1996, the City Council authorized Amendment #1 (property plats along IL Rt. 72 ) with the above agreement. Copies of the Council memorandum and agreements are attached as Exhibit A. When the original agreement was approved January 24 , 1996 , the proposed roadway was to follow an alignment along the western property line of three properties . See Exhibit B for the original alignment. Negotiations for the acquisition of the right-of-way, for the subject roadway, resulted in a revision to the roadway alignment . This new alignment is felt by the property owners, to be better suited for their future development needs . The new alignment is also shown on Exhibit B. In addition to the revised location, negotiations with the properties owners resulted in a revised scope which will construct a roadway to a profile that can be easily retrofitted to a future roadway cross section which will include curb and gutter, storm sewer and street lights . The original roadway was only to be temporary in nature and was to be built to a cross section including gravel shoulders and open ditch drainage. Rt. 72 Access Rdwy Amendment No. 2 Page 2 HLR performed some initial design and survey work for the original alignment . This amendment #2 adds additional staff hours to accomplish additional design and survey for the revised alignment. COMMUNITY GROUPS/INTERESTED PERSONS CONTACTED None. FINANCIAL IMPACT The City has budgeted $1 . 9 million for the purchase of rights-of-way ( $950, 000) and construction ($950, 000) of the Motorola Access Roadway from the 1996 bond issue under Account 396-1000-795 . 93-80, Project No. 339554 . Amendment No. 2 in the not-to-exceed amount of $9 , 785 will bring the total of this agreement to the not-to-exceed amount of $103,510 . A copy of the Amendment No. 2 is attached as Exhibit C. The original contract with HLR totalled $75, 225 with Amendment No. 1 equalling $18,000 . After this project is bid and awarded, this agreement with HLR will be further amended to add construction-related engineering and inspection services . LEGAL IMPACT None. ALTERNATIVES None. RECOMMENDATION It is recommended that the Mayor be authorized to execute the Amendment No. 2 with HLR, in the additional not-to-exceed amount of $9 , 785, bringing the total agreement amount to $103, 510 . 00 . Respectfully submitted, David Lawry Director of Pub i /Works elk Richard B. Helwig City Manager DL/do Ai104 1 S36,1 L, \\ \ , ••• \\ ..----- __---- I \ ----' - . .---- _ '•,-,:.',.., _.2--c---- •••,_ \,\---- "----\ ....._-- . \\ .. ....._ , . . .......„ - '---A ... \ i .,./ \ TP ----- - 00°1 --: ----'---- \ r - ...:. \ N°0-31.151A- 38 •- \ \ -lo '5,'I • 'IIIIIIIIN.- \ \ ' 1.4111111" ,.-„• ...-- „---- \ .„--- , . ----- _ ----- , Y.•‘",,, __,./ \\ .. • •:‘.:,. - ... \ •400 .',.3 . , c53 •-‹.,,,...;t \ QV OlkiNi- 140\ 0 VI*- • ,',...'. ':-.".•::: .1.13 \ \ \ ZI^ '\ ..--\ \ ' . -,40) -.i ,229 2 Ti ° 416 \\10\ Neci #A0 • cov\1 GS3')-Ycl