HomeMy WebLinkAbout95-217 Resolution No. 95-217 RESOLUTION APPROVING CHANGE ORDER NO. 1 IN THE CONTRACT WITH MANEVAL CONSTRUCTION, INC. FOR THE DOUGLAS AVENUE IMPROVEMENT WHEREAS, the City of Elgin has heretofore entered into a contract with Maneval Construction, Inc. for the Douglas Avenue Improvement; and WHEREAS, it is necessary and desirable to modify the terms of the contract as is described in Change Order No. 1, attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that Richard B. Helwig, City Manager, be and is hereby authorized and directed to execute Change Order No. 1, a copy of which is attached hereto and made a part hereof by reference. s/ Kevin Kelly Kevin Kelly, Mayor Presented: October 11, 1995 Adopted: October 11, 1995 Omnibus Vote: Yeas 7 Nays 0 Attest: s/ Dolonna Mecum Dolonna Mecum, City Clerk ELGIN, ILLINOIS PROJECT #STO6 CHANGE ORDER NO. 1 SCOPE: This Change Order #1 will provide additional items necessary to finalize the project . The general contractor for this project is Maneval Construction, Inc. of Grayslake, IL. REASONS FOR CHANGE:This Change Order #1 is required for the addition or change in items necessary to adjust payment for additional construction costs associated with electrical conflicts and underground obstructions . SUMMARY OF CHANGES IN CONTRACT AMOUNT: The amount of the contract will be revised as follows : ITEM ADD 1) Time and material for Electrical Repairs $9,351 . 09 (See Schedule A attached) 2 ) Additional Lighting Equipment and Labor $11, 054 . 67 (See Schedule B attached) 3) Time and material for Underground Obstructions $25,258 . 52 (See Schedule C attached) 4 ) Deduction for additional concrete testing ( -) $545 . 85 5) Adjustment to contract pay item quantities ( -) $17, 699 .45 (See the attached final pay estimate) NET COST OF CHANGE ORDER #1 = $27,418 . 98 SUMMARY OF CHANGES TO CONTRACT TIME: The contract completion date will be extended from July 14, 1995 to August 11, 1995 . The reason for the time extension is due to the extra electrical and underground work encountered and time lost due to conflicts with Maneval ' s schedule relative to the Police Facility construction and the Fox Trot which postponed Maneval ' s start date. The original contract with Maneval Construction, Inc . is $236 , 513 . 95 . By reason of this Change Order #1, the contract for the Douglas Avenue Improvement Project will be increased in the amount of twenty seven thousand four hundred eighteen and 98/100 dollars ( $27 , 418 . 98 ) . The final contract amount, inclusive of change order #1 is two hundred sixty three thousand nine hundred thirty two and 93/100 dollars ( $263, 932 . 93) . • CHANGE ORDER NO. 1 September 15, 1995 Page 2 OTHER CONTRACT PROVISIONS: All other contract provisions shall remain the same. Agreed to this G/ day of L ' �-e� , 1990 . Recommended: ENGINE G DI ISION By: / Date: Accepted: MANEVAL CONSTRUCTION, INC. Party of the Second art (Contractor) By: dd0. ti Title: �Y /0/2� Date: //f�,tr'-f Approved: CITY OF ELGIN Party of the First Part (Owner) Title: Date: I bl' -a-14:tN SCHEDULE A Force Account W.O. # Date Invoice Description 1 6/9/95 $ 422.50 Existing Cable Repair 2 6/12/95 $ 774.00 Circuit Investigation and Rewire to Remain Active 3 6/13/95 $ 198.89 Repair Damaged SL Cable Under Sidewalk and Curb 4 6/14/95 $ 393.82 Remove SL @ Police Station & Associated Re- Wiring 5 6/15/95 $1,129.74 Repair SL Cable& Install New Junction Boxes 6 6/19/95 $1,367.19 New Conduit & Wire West Side of Douglas (North & Kimball) 7 6/20/95 $ 457.59 Repair Damaged SL Cable under Sidewalk & Curb 8 $ 0.00 No Charge. This is for Light Damaged by Construction Truck 9 6/21/95 $ 431.32 Lot Full Light Reconstruction 10 6/28/95 $ 920.00 T&M for Construction Wall Rem. Under Pavement for Foundation 11 6/30/95 $1,384.00 Temp. Signal Installation - Told to Stop by City 12 6/30/95 $ 563.84 Re-Wiring for New J Box & New Pole Location 13 7/5/95 $ 339.04 Re-Wiring for New J Box to Restore Existing SL Cables 14 7/7/95 $ 251.12 Repair SL Cable& Conduit through Ty 3 Patch 15 7/10/95 $ 272.75 Re-Wire Main Feed Douglas & Division Subtotal $8,905.80 GC@5% $ 445.29 Total Additional Cost $9,351.09 SCHEDULE B Item # Description E-1 Light Pole Foundations (24") 2 Each $ 438.00 $ 966.00 E-2 Set Light Poles Supplied by City 2 Each $ 230.00 $ 460.00 E-3 Type D Foundation for SL Controller 1 Each $ 945.87 $ 945.87 E-4 Lighting Control Center 1 Each $6,292.80 $6,292.80 E-5 3" GSC T 15 L.F. $ 7.99 $ 119.85 E-6 4" GRC T 35 L.F. $ 9.49 $ 332.15 E-7 5" Core Exist Structure 2.Each $ 144.00 $ 288.00 E-8 250 W. M.H. Luminaire with 15' MA at Kimball 2 Each $ 825.00 $ 1,650.00 Total Additional Cost $11,054.67 • • SCHEDULE C Item # Description X-1 Saw Cutting 2,431 L.F. $ 2.00 $ 4,862.00 X-2 Expansion Material 2,246 L.F. $ 0.50 $ 1,123.00 X-3 Parking Meter Foundation Removal 6 Each $ 50.00 $ 300.00 X-4 `H' Pile Removal 3 Each $ 75.00 $ 225.00 X-5 Light Pole Foundation Removal 3 Each $ 75.00 $ 225.00 X-6 Raise Existing Sidewalk (T&M Ticket) $ 368.21 X-7 Vault Repair(Highland Avenue) (T&M Ticket) $ 312.80 X-8 Vault Repair (T&M Ticket) $ 655.50 X-9 Ductile Iron Storm Sewer 92 L.F. $ 11.80 $ 1,085.60 X-10 Additional Time for Utility Conflicts (T&M Ticket) $10,669.66 X-11 Waiting Time Crack Control (GSI) (T&M Ticket) $ 431.25 X-12 Additional Traffic Control (T&M Ticket) $ 2,009.00 X-13 Inlet Type A with Fr& Lid 5 Each $ 550.00 $ 2,750.00 X-14 Tank Excavation Consolidation (T&M Ticket) $ 241.50 Total Additional Cost $25,258.52 City of Elgin • Kane County, Illinois 1995 Resurfacing-Douglas Avenue City Cost Center 8409 Engineers Payment Estimate FINAL ESTIMATE Maneval Construction Company,Inc. 211 S.Rte.83,Maneval Drive Grayslake,Illinois, 60030 (708)548-2241 Item Awarded Added Deducted Completed Unit No. Description Unit Quantity Value Quantity Quantity Quantity Price Value 1 Leveling Binder(Hand Method) TONS 30 SI,395.00 30 S46.50 SI,395.00 2 Bituminous Concrete Surface Course,2" TONS 756 S21,092.40 70.93 685.07 $27.90 S19,113.45 3 Bituminous Concrete Binder Course,2" TONS 756 S22,604.40 106.7 649.3 S29.90 S19,414.07 4 Bituminous Surface Removal,Special SQ.YD. 6573 S13,408.92 1313 7886 S2.04 S16.087.44 5 Bituminous Material(Prime Coat)SS-1 GAL. 657 S689.85 393 750 S1.05 S787.50 6 Class"C"Patches 8" SQ.YD. 990 S24,750.00 757.6 1747.6 S25.00 S43,690.00 7 Comb.C&G Removal LIN.FT. 2386 S4,056.20 139.2 2246.8 S1.70 S3,819.56 8 Comb.Conc.Curb&Gutter,Type B-6.18 LIN.FT. 580 $6,670.00 1851.6 2431.6 S11.50 S27,963.40 9 Sidewalk Removal SQ.FT. 25680 512,840.00 17987.7 7692.3 $0.50 S3,846.15 1 10 PCC Sidewalk,5" SQ.FT. 750 S1,500.00 4238 4988 S2.00 S9.976.00 11 Monolithic Sidewalk SQ.FT. 18264 S46,390.56 18264 0 S2.54 $0.00 12 Driveway Pavement Removal SQ.FT. 110 S330.00 16.6 121.6 $3.00 S364.80 13 PCC Driveway Pavement 6" SQ.FT. 110 $2,255.00 18.3 107.4 $20.50 S2,201.70 14 Manhole to be adj.w/new Neenah R-1712-C,Closed lid EACH 34 S15,300.00 25 9 S450.00 S4,050.00 15 Catch Basin to be adj.w/new Neenah R-3010 w/Type EACH 6 $3,000.00 6 S500.00 S3,000.00 3V grate 16 Catch basin to be adj.w/new Neenah R-3010,with EACH 5 S2,500.00 5 S500.00 $2,500.00 Type A grate 17 Storm Sewer,RCP 12" LIN.FT. 345 $11,730.00 30 375 $34.00 S12,750.00 1 18 Catch Basin,Type A,4'Dia. EACH 5 $6,000.00 2 3 S1,200.00 S3,600.00 19 Catch Basin to be removed EACH 4 51,800.00 2 6 S450.00 S2,700.00 20 Conc.Handhole to be Reconstructed EACH 4 S1,470.00 3 1 S367.50 S367.50 21 Trench Backfill CU.YD. 45 S1,350,00 224.7 269.7 $30.00 S8,091.00 22 Water Box to be Adjusted EACH 15 S1,350.00 7 8 S90.00 S720.00 23 Fire Hydrant to be Relocated EACH I S1,800.00 1 S1,800.00 S1,800.00 24 Sodding and Supplemental Watering SQ.YD. 78 S300.30 11 67 S3.85 S257.95 25 Fxisting Sign and Post Removal EACH 25 S625.00 12 13 $25.00 S325.00 26 Strip Reflective Crack Control Treatment LIN.FT. 3500 $5,145.00 868 2632 $1.47 S3,869.04 27 Mixture for Cracks,Joints and Flangeways TONS 2 S150.00 2 4 $75.00 S300.00 28 Sign Post LIN.FT. 220 $2,193.40 112 108 $9.97 S1,076.76 29 Sign Panel SQ.FT. 37 S349.65 8 29 S9.45 S274.05 30 Stop Sign EACH 4 S315.00 4 8 S78.75 S630.00 31 Street Name Sign Assembly EACH 6 $787.50 4 2 S131.25 S262.50 32 Thermoplastic Pvt.Mk-Line 4" LIN.FT. 2661 $1,1 17.62 138 2799 $0.42 51,175.58 33 Thermoplastic Pvt.Mk-Line 6" LIN.FT. 585 S368.55 1595 2180 S0.63 S1,373.40 34 Thermoplastic Pvt.Mk-Line 24" LIN.FT. 170 S357.00 58 112 $2.10 S235.20 35 Thermoplastic Pvt.Mk-Ltr and Sym. SQ.FT. 291 S762.42 109.4 400.4 $2.62 $1,049.05 36 Temporary Pavement Marking LIN.FT. 2500 S800.00 1070 1430 $0.32 S457.60 37 Temporary Pavement Marking,Ltr.&Sym. SQ.FT. 73 S114.61 145.5 218.5 S1.57 S343.05 38 Pavement Marking to be Removed SQ.FT. 37 S48.47 78 115 $1.31 S150.65 39 Traffic Control and Protection L.SUM 1 S4,305.00 1 S4,305.00 S4,305.00 :1TMcH\FEESCHD.WK4 09/14/95 40 Remove Existing Traffic Signal Equipment L.SUM I S2,097.90 1 S2,097.90 S2,097.90 41 Temporary Traffic Signal Installation L.SUM 1 S12,394.20 1 S12,394.20 S12,394.20 Totals S236,513.95 S218,814.50 Miscellaneous Extras and Credit Value Schedule A • $9,351.09 • Schedule B SI 1,054.67 Schedule C S25,258.52 Total Miscellaneous Extras and Credits $45,664.28 Total Value of Completed Work $264,478 78 Deduct Retainage 0% $0.00 Balance Due on Completed Work $264,478.78 Miscellaneous Debits Schedule D Value -545.85 Previous Payments $226,162.60 Net Amount Due $37,770.33 -9S Approved Project Engineer-Rust Date Signed Project Manager Date • :1TMcH\FEESCHD.WK4 09/14/95 -------------- Ruff Rust Environment & Infrastructure Inc. A Rust International Company Phone 708.605.8800 1501 Woodfield Road Fax 708.605.8914 Suite 200 East Schaumburg,IL 60173 September 14, 1995 Mr. Dave Lawry City of Elgin 150 Dexter Court Elgin, Illinois 60120 Re: Douglas Avenue Resurfacing Project Final Estimate Maneval Construction Company Dear Dave: Attached is the Final Estimate and Change Order for this project. The total final cost is $263,932.93, a net increase of$27,418.98 over the bid price. This change in cost is summarized by schedules A through D as follows: Schedule A: $9,351.09 - these were electrical extras required in order to maintain the existing street lighting during construction. Schedule B: $11,054.67 -these were City requested changes to the street lighting system in order to eliminate an unsafe condition in an existing underground controller vault. Schedule C: $25,258.52 - these were additional items required to complete the work due to underground obstructions and changed field conditions. This amount is partially offset by savings of approximately $13,200 in bid items. (See estimate.) Schedule D: ($545.85) - back charge to Contractor for additional testing of concrete. The backup for this work is included in the project files. If you have any questions concerning this matter, please call. Si erely, c2s2_ id\ittrAm.tt Dave Thoman Project Manager Attach: as noted Q:\TRANS\LETTERS\ELGIN.DT O(,llily drrrxrgh 1e,3mvruk inL-... .k.,....___,.,,\, 4 Agenda Item No. \ \ <11111.... /r\ 4 September 20, 1995 TO: Mayor and Members of the City Council FROM: Richard B. Helwig, City Manager SUBJECT: Authorization of Change Order #1, Final Payment and Acceptance of the Douglas Avenue Improvements PURPOSE This memorandum will provide the Mayor and members of the City Council with information to consider approval of Change Order #1 , acceptance of the subject improvements and authorization to make the final payment. BACKGROUND The City Council awarded to Maneval Construction the contract for the Douglas Avenue Improvement Project on May 10, 1995 . The project generally included the removal and replacement of all curbs, gutters and deteriorated sidewalks . The pavement was ground and resurfaced with three inches of new asphalt. Maneval Construction has completed the project in compliance with the plans and specifications as verified by the City' s Engineering staff and the City' s consultant, Rust Environmental & Infrastructure. Attached for your additional consideration is Change Order #1 . This change order adds various items necessary to complete the work. Additionally, this change order #1 changes the project completion date from July 14, 1995 to August 11, 1995. The major reason for the additional costs was the unknown electrical conflicts associated with the sidewalk construction and the underground conflicts which were encountered while installing a storm sewer. All items were unforeseen at the time the contract was awarded and are necessary in order to complete the project. These items are addressed on the attached change order and on the attached final pay estimate. The City' s engineer, Rust Environment and Infrastructure, has reviewed the additional Change Order #1, Douglas Avenue Improvements September 20, 1995 Page 2 costs and has provided its recommendation, also attached for your information. COMMUNITY GROUPS/INTERESTED PERSONS CONTACTED None. FINANCIAL IMPACT The project was budgeted in the amount of $375, 000 under the Riverboat Fund (account 275-0000-791 . 93-80 , project 337100 ) . Contracts awarded under this funding included: a) Maneval Construction at $236 , 513 . 95 b) Rust Engineering at $ 25 ,695 . 88 c) Testing Service Corp. at $ 1 , 522 . 98 For a total original contracted amount of $263, 732 . 81 . Change Order No. 1 increases the Maneval Construction contract by $27 , 418 . 98 to $263, 932 . 93 . The total project cost thus becomes $291 , 151 . 79 . Adequate moneys remain in the project account to fund this increase. LEGAL IMPACT None. RECOMMENDATION It is recommended that the City Council authorize Change Order #1 in the amount of $27 ,418 . 98, and direct staff to execute the change order document. It is further recommended that the City Council accept the completed project and authorize the final payment of $37 , 770 . 33 to Maneval Construction, Co. Respectfully submitted, x! . 1, (.;14(Alf4 Gam / ames L. Kristiansen Public Works Director 'eaa,,,e_ . 1���► Richard B. Helwig City Manager DL/do Attachments