HomeMy WebLinkAbout95-137 Resolution No. 95-137 RESOLUTION APPROVING CHANGE ORDER NO. 1 IN THE CONTRACT WITH TRI-ON CONSTRUCTION COMPANY FOR NATIONAL STREET IMPROVEMENTS WHEREAS, the City of Elgin has heretofore entered into a contract with Tri-On Construction Company for National Street improvements; and WHEREAS, it is necessary and desirable to modify the terms of the contract as is described in Change Order No. 1, attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that Richard B. Helwig, City Manager, be and is hereby authorized and directed to execute Change Order No. 1, a copy of which is attached hereto and made a part hereof by reference. s/ Kevin Kelly Kevin Kelly, Mayor Presented: June 28, 1995 Adopted: June 28, 1995 Omnibus Vote: Yeas 7 Nays 0 Attest: s/ Dolonna Mecum Dolonna Mecum, City Clerk NATIONAL STREET IMPROVEMENTS CHANGE ORDER No. 1 May 25, 1995 SCOPE: This change order covers additional work necessary to : items 04x1 and 04x2 . expedite the opening of the portion of National Street west of the Fox River. High-early concrete was utilized instead of standard concrete on both the Concrete Pavement and the Concrete Base because it reaches allowable strength in shorter period of time. item 04x3 . provide a handicap ramp at a location plans had not included for sidewalk and curb improvements . item 04x4 . remove buried railroad ties . Records were not available to reflect locations of abandoned railroad ties . The saw cutting was necessary to prevent disturbing good pavement . item 04x5 . repair a portion of the reinforced concrete approach slab to the National Street Bridge. The repair required the installation of Epoxy-Coated reinforcement. item 04x6 . provide signs warning motorists of the closing of east-bound traffic. item 04x7 . satisfy an IDOT request for additional signal work at State Street ( ILL 31) and Walnut Avenue. item 04x8 . replace a sanitary sewer manhole. The replacement of a brick sanitary sewer manhole was not originally accounted for because it was thought to be in good shape. However, during construction it became evident that the mortar and brick had deteriorated such that it could not be repaired. item 9 . reduce the cost of concrete base course that failed to pass strength testing. REASONS FOR CHANGE: This Change Order number 1 will account for the additional pay items which are due to circumstances not reasonably foreseeable at the time the contracts were signed. National Street Improvements Change Order No. 1 May 25, 1995 Page 2 SUMMARY OF CHANGES IN CONTRACT AMOUNT: The amount of the contract will be revised as follows : ITEM ADD/ (DEDUCT) 04x1 High Early Concrete 2 , 524 . 6 S.Y. $9 ,467 .25 P.C.C. Pvt. 8-1/2" 04x2 High Early Concrete 350 . 0 S .Y. $ 346 . 25 P.C.C. Base Course 04x3 Horizontal Curb Cut 1 . 0 L. S . $ 213 . 15 04x4 Saw Cut 598 . 0 L.F. $1, 196 . 00 04x5 Drill and Install 1 . 0 L. S. $1, 557 . 26 Epoxpy-Coated Rebar 04x6 Special Order Signs 2 . 0 EA $ 600 . 00 04x7 Additional Temp. Signals 1 . 0 L. S . $2,000 . 00 at Walnut and State 04x8 Sanitary Sewer Manhole 1 . 0 EA $1,500 . 00 9 50% Reduction PCC Base 155 . 2 S.Y, ( $1,940 . 00) Course The total amount of the above items is $14 , 939 . 90 . This change order increases the contract amount from $2 , 934 , 000. 64 to $2,948,940 .54 . National Street Improvements Change Order No. 1 May 25, 1995 Page 3 OTHER CONTRACT PROVISIONS: All other contract provisions shall remain the same. ILAgreed to this 38, day of , 1995 . Recommended: II En. ' eering Division B . .4., /r ' i ta - : 65/4/45 — 'ccepted: Party of the Second Part, Tri-On Construction Company By: t„,(, , � Title: C� Date: 0:////c(475.--- Approved: Party of the First Part, City of Elgin > By: \. . 1:21,,Q.....:1 Title: C{ Date: 4o(Z9 '9 f II • Agenda Item No. June 8, 1995 TO: Mayor and Members of the City Council FROM: Richard B. Helwig, City Manager SUBJECT: National Street Improvements Authorization for Change Order No. 1 PURPOSE This memorandum will provide the Mayor and members of City Council with information to consider Change Order No. 1 to the contract with Tri-On Construction Company for the National Street Improvements . BACKGROUND The subject project was awarded to Tri-On Construction Co. at the May 25, 1994 Council Meeting in the amount of $2,934,000.64 . The work on this project is substantially completed. Some signal work remains at the intersection of Route 31 and National Street. The pay items added to the contract are necessary to complete the project in a satisfactory manner and were not foreseeable at the time the contract was signed. The additional items were necessary to expedite the reopening of National Street to two-way traffic and to complete work that became necessary as the project progressed. High-Early Concrete is a faster setting mix of concrete which allows the item, in this case pavement, to be utilized sooner. Saw cutting, installation of steel reinforcement and the sanitary manhole became necessary when excavating revealed buried problems. Additional signal work was provided at the request of the Illinois Department of Transportation. COMMUNITY GROUPS/INTERESTED PERSONS CONTACTED r None. National Street Improvements June 8, 1995 Page 2 FINANCIAL IMPACT Change Order No. 1 increases the awarded contract amount by $14,939 .90 for a total of $2,948,940.54 . There are funds remaining from the 1992 bond sale to cover the additional costs. Account number 392-0000-795 .93-80, Project No. 339533 - 1992 Bond Project Fund Major Repairs Public Ways, will be charged. A budget amendment is necessary. . LEGAL IMPACT None. RECOMMENDATION It is recommended that the City Council authorize the City Manager to execute Change Order No. 1 in the amount of $14,939. 90 to the contract with Tri-On Construction Co. A copy of the change order is att hed for your consideration. espectfully su fitted, James L. Kristiansen Public Works Director Richard B. Helwig City Manager JE/do Attachments r