HomeMy WebLinkAbout93-302 Resolution No. 93-302 RESOLUTION APPROVING CHANGE ORDER NO. 1 IN THE CONTRACT WITH AMERICAN DEMOLITION CORPORATION FOR THE COMMONWEALTH AVENUE WATER TOWER DEMOLITION WHEREAS, the City of Elgin has heretofore entered into a contract with American Demolition Corporation for the Commonwealth Avenue water tower demolition; and WHEREAS, it is necessary and desirable to modify the terms of the contract as is described in Change Order No. 1, attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that Robert O. Malm, Interim City Manager, be and is hereby authorized and directed to execute Change Order No. 1 , a copy of which is attached hereto and made a part hereof by reference. s/ George VanDeVoorde George VanDeVoorde, Mayor Presented: December 1 , 1993 Adopted: December 1 , 1993 Omnibus Vote: Yeas 6 Nays 0 Attest : s/ Dolonna Mecum Dolonna Mecum, City Clerk COMMONWEALTH AVENUE WATER TOWER DEMOLITION Change Order #1 SCOPE: Change order #1 covers additional changes in the scope of the Commonwealth Avenue water tower demolition contract that were not reasonably foreseeable at the time the contract was signed and are in the best interests of the City. Items covered in this change order are: 1. The demolition of the well house roof and the foundation walls to two feet below grade, filling the hole with dirt, and grading to match the existing grade around the former well house, and 2. A credit for not requiring special handling or disposal requirements due to lead based paint. This contract is with American Demolition Corporation, Bloomingdale, IL 60108. REASON FOR CHANGE: 1. During the course of the demolition, it was found that the roof of the well house at the Commonwealth tower site was too thick for City demolition equipment. It was also necessary that the concrete walls of the well building be broken, the pit filled, and the area graded and seeded. These items were not contained in the original contract. The additional work resulted in a net addition to the contract. 2. Prior to demolition a sample of the slag generated by torch cutting the steel tank was collected and sent for laboratory analysis. The analysis showed that the sample contained lead at 2.4 mg/l. This was less than the maximum acceptable lead content of 5.0 mg/l. Therefore, neither special handling nor disposal was required. This resulted in a net credit to the City. SUMMARY OF CHANGES IN CONTRACT AMOUNT The amount of the contract will be revised as follows: Item Description Quantity Price 1 Demolition of well house 1 $ 800.00 roof and foundation 2 Credit for no special -10,000.00 handling or disposal TOTAL CREDIT $ 9,200.00 The original contract with American Demolition Corporation was for $24,400.00 (twenty four thousand four hundred and 00/100 dollars) . With this change order a credit of $9,200.00 will be deducted from the original contract amount for a total revised contract amount of $15,200.00 (fifteen thousand two hundred and 00/100 dollars) . COMMONWEALTH AVENUE WATER TOWER DEMOLITION Change Order #1 Page 2 OTHER CONTRACT PROVISIONS: All other contract provisions shall remain the same. Recommended: ELGIN WATER DEPARTMENT By: 7-1'r , Title: /t )•Z lit�Zit.p"�/ Date: / 8/pj Accepted: AMERICAN DEMOLITION CORP ION By: 7- .c:1)-' Title: ?/- f' • Date: Approved: CITY OF By: Title: `W\ ( V, Date: 2--Hq3-- PLB:jk 26721104.193 (bidspec2) El_ In ;:;, Agenda Item No . I\A o r ,n m �B�'` November 9 , 1993 TO: Mayor and Members of the City Council FROM: Robert O. Malm, Interim City Manager SUBJECT: APPROVAL OF CHANGE ORDER #1, FINAL PAYMENT, AND ACCEPTANCE OF DEMOLITION OF THE COMMONWEALTH AVENUE WATER TOWER (W-41) PURPOSE This memorandum will provide the Mayor and Council with information to consider authorizing change order #1, final payment, and acceptance of the demolition of the subject Ym � property. BACKGROUND The City Council awarded the contract for the demolition of the Commonwealth Avenue water storage tank to American Demolition Corporation on July 14 , 1993 . The project generally included the demolition, removal, and disposal of the 500, 000 gallon steel water storage tank and site restoration. American Demolition Corporation has completed the project in compliance with the specifications provided by the City of Elgin Water Department. FINANCIAL IMPACT The initial contract was awarded for $24 ,400 . The contract has a provision for a deduct price of $10,000 if special handling or disposal was not required per testing of the material . An additional charge of $800 resulted from conditions experienced during demolition. Therefore, a net total credit of $9 ,200 resulted, which will bring the revised contract amount to $15,200 . A copy of change order #1 is attached. The total amount paid to date is $13, 680, resulting in a balance due of $1,520 . Page 2 RECOMMENDATION it is recommended that the City Council approve change order #1 with a total credit amount of $9 ,200, approve the final payment to American Demolition Corporation in the amount of $1, 520, and accept the completed project. dalionAftwomeger Robert O. alm, Interim City Manager ROM:LED:PLB: jk 01141108 . 393 Attachment v • COMMONWEALTH AVENUE WATER TOWER DEMOLITION Change Order #1 SCOPE: Change order *1 covers additional changes in the scope of the Commonwealth Avenue water tower demolition contract that were not reasonably foreseeable at the time the contract was signed and are in the best interests of the City. Items covered in this change order are: 1. The demolition of the well house roof and the foundation walls to two feet below grade, filling the hole with dirt, and grading to match the existing grade around the former well house, and 2. A credit for not requiring special handling or disposal requirements due to lead based paint. This contract is with American Demolition Corporation, Bloomingdale, IL 60108. REASON FOR CHANGE: 1. During the course of the demolition, it was found that the roof of the well house at the Commonwealth tower site was too thick for City demolition equipment. It was also necessary that the concrete walls of the well building be broken, the pit filled, and the area graded and seeded. These items were not contained in the original contract. The additional work resulted in a net addition to the contract. 2. Prior to demolition a sample of the slag generated by torch cutting the steel tank was collected and sent for laboratory analysis. The analysis showed that the sample contained lead at 2.4 mg/1. This was less than the maximum acceptable lead content of 5.0 mg/l. Therefore, neither special handling nor disposal was required. This resulted in a net credit to the City. SUMMARY OF CHANGES IN CONTRACT AMOUNT The amount of the contract will be revised as follows: Item Description Quantity Price 1 Demolition of well house 1 $ 800.00 roof and foundation 2 Credit for no special -10,000.00 handling or disposal TOTAL CREDIT $ 9,200.00 The original contract with American Demolition Corporation was for $24,400.00 (twenty four thousand four hundred and 00/100 dollars) . With this change order a credit of $9,200.00 will be deducted from the original contract amount for a total revised contract amount of $15,200.00 (fifteen thousand two hundred and 00/100 dollars) . COMMONWEALTH AVENUE WATER TOWER DEMOLITION Change Order #1 Page 2 OTHER CONTRACT PROVISIONS: All other contract provisions shall remain the same. Recommended: ELGIN WATER DEPARTMENT 7-" By: f t t/ - L A.` L /_ Title: l ,Z ' t i . •r* (0- r 1 ;,: r (4 Date: ! / F ;' 7 Accepted: AMERICAN DEMOLITION CORP ION i By: Title: / /"' f • Date: - Approved: CITY OF ELGIN By: Title: Date: PLB:jk 26721104.193 (bidspec2) IZ!!!; Agenda Item No . 5 TO: Mayor and Members of the City Council FROM: City Manager DATE : July 7 , 1993 SUBJECT: BID #93-043 , DEMOLITION OF THE COMMONWEALTH AVENUE WATER TOWER PURPOSE: The purpose of this memorandum is to award a contract for the demolition of the Commonwealth Avenue water tower. BACKGROUND: On July 1 six bids were received for the demolition, removal, and disposal of the 500 , 000 gallon steel water storage tank. A bid tabulation of the results of the bid opening is attached. The location of the elevated water storage tank is at the intersection of Commonwealth Avenue and Schuler Street. This tank was built in 1913 by CBI Na-Con, Inc . The new elevated tower at Shales Parkway, which is 15 feet higher, will put the Commonwealth Avenue tower out of service. FINANCIAL IMPACT: A total of $40, 000 is specifically set aside for this project in the Public Works/Water Department' s capital budget under appropriation # 392-0000-795-9390 Project # 409041. RECOMMENDATION: The recommendation is to award this project to the responsive lower bidder, American Demolition Corporation, for a total of $24 ,400 . ( a/a/- City Manage. LLR:LED:PLB: jk 01140706 . 293 cc: James L. Kristiansen, Public Works Director • O E TABULATION OF BIDS o. Tr 00 0,-) gt a � CITY OF ELGIN 0 o w o )4 H 0 O 0 17111.0 !~ 4.1 ro a >4 ro v ro H t~ N O -r1 1 Invitation No. 93-043 3 H z 3 ' +1 •' �' r' >sa 0 a1 x +� +1 o Cr) O - N O U) Z to r•1 -ri O O •r1 O -H 0 5 r--1 N 104 N N H •r1 >~ O 11 Z l0 a) > l0 H CO Date of OpeningJuly 1, 1993 °� O H �' �' ri x o +� ro -I-) k° �+ ro O O a •r1 ro oo m a va m 4-I '» U (n X C� a) l0 - E - H 1-7 H N '-1 H )-I Cr 0 7-1 H co Q z?I H 0 a) z Department Water ro M N P Xi al .H 0 0 ro • O Z C.) ro -r1 >~ �+ }-I • +� a� a z to >~ 54 O `� M •O b� al r-I 8 RI. 0 O •O -1 0 r-I O 4 N M 0 8 k0 Ft; W O U) O •rl +1 d •r1 r I tqr I ri rrll L l CO • 00 .0 ro '1' .� to -I rd •1 W �. N L4 z �L 1� U) O M U z N O H M $ Item Description AMOUNT AMOUNT AMOUNT AMOUNT AMOUNT AMOUNT No. Demolition and site clearance of the 500,000 gallon steel water storage tank on Commonwealth Avenue -2)Base Bid 1:24,400 30,000 36,000 39,800 59,800 62,800 Pricing Deduct: -10,000 -5,016 - $1.00 - - - - 39,400 Deduct from base bid should per net ton 'special handling or disposal not be required following additional testing of material. ___L_