Loading...
HomeMy WebLinkAbout93-165 Resolution No. 93-165 RESOLUTION AUTHORIZING EXECUTION OF AMENDMENT NO. 2 TO AN AGREEMENT WITH JOHNSON JOHNSON & ROY, INC. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that Larry L. Rice, City Manager, and Dolonna Mecum, City Clerk, be and are hereby authorized and directed to execute Amendment No. 2 to an Agreement on behalf of the City of Elgin with Johnson Johnson & Roy, Inc . for engineering services for the Center City Parking Lot, a copy of which is attached hereto and made a part hereof by reference. s/ George VanDeVoorde George VanDeVoorde, Mayor Presented: June 23, 1993 Adopted: June 23, 1993 Omnibus Vote: Yeas 7 Nays 0 Recorded: Attest: s/ Dolonna Mecum Dolonna Mecum, City Clerk w Ekin -� Agenda Item No. 0,. � \tlfD(t�1 June 4, 1993 MEMORANDUM TO: Mayor and Members of the City Council FROM: Larry L. Rice, City Manager SUBJECT: Amendment No. 2 with Johnson, Johnson and Roy, Inc . (JJ&R) for Construction Engineering Services for Center City Parking Lot Construction PURPOSE: To provide information to consider authorizing an Amendment No. 2 with JJ&R, to extend their professional services to include construction engineering and inspection for the Center City Parking Lot construction. BACKGROUND: On April 28, 1993, City Council authorized an Amendment No. 1 with JJ&R to provide design engineering and the preparation of plans and specifications for the Center City Parking Lot. The lot construction was advertised for bid on May 18 & 19 , 1993 with bids opened on June 4 , 1993 . The award of the lot construction is anticipated to be made by City Council on June 9 , 1993 . This Amendment No.2 will further extend JJ&R' s professional services to include the provision of construction engineering and inspection. A proposed scope of work is attached which will serve as the bases for the Amendment No.2 . The project is still on schedule with substantial completion of the lot anticipated by the first week of September, 1993 . FINANCIAL IMPACT: The negotiated price for this Amendment No. 2 will not exceed $35,080 . Funds are available for the work in Account 392-00-00-795-93-32 Center City Parking Lot. 1111, Mayor and Members of the City Council June 4, 1993 Page 2 RECOMMENDATION: That City Council authorize the City Manager to execute an Amendment No. 2 with JJ&R in the amount not to exceed $30,280 for basic services and an amount not to exceed $4 , 800 for reimbursable expenses, for a total Amendment No.2 amount of $35,080 . Lar . Rice, ity Manager do Attachment Amendment No. 2 d`/ uL This Amendment No. 2 entered into this day of 1993, by and between the City of Elgin, an Illinois municipal corporation (hereinafter referred to as "CITY" ) and Johnson, Johnson & Roy, Inc. (hereinafter referred to as "ENGINEER" ) , shall modifythat Agreement g ree ment dated 13 August 1992 whereby the ENGINEER was engaged by CITY to perform certain professional services in connection with the Elgin Center City Project-Civic/ Cultural District Project, and Amendment No. 1 whereby the scope of services of the Engineer was expanded to include the engineering, preparation of bid documents and bid evaluation of the Center City Parking Lot. Whereas the CITY desires to further expand the scope of services of the ENGINEER to include the furnishing of certain professional construction services in connection with the Center City Parking Lot construction (hereinafter referred to as the "LOT" ) . In response to these additional construction related services, certain revisions must be made to the Agreement. In compliance, therefore, the terms and conditions of the Agreement are modified as specifically set out below. All other parts of the Agreement remain unchanged. I . Scope of Services : add the following: I .B. 5 Phase V: Bidding & Construction 5 . 2 the Engineer shall provide construction administration, on-site construction observation and quality control/testing. I .C. A detailed Scope of Construction Services is attached hereto as Attachment E. V. Payments to the Engineer: D. For construction related services under this Amendment #2 . The Engineer shall be reimbursed at the direct hourly rate of personnel classes as listed in Attachment E and employed on the PROJECT. The total fee will not exceed $30,280 (thirty thousand two hundred eighty dollars) , regardless of actual costs incurred by the Engineer unless substantial modifications to the scope of work are authorized in writing. E. The above fee shall be for basic construction related services as described in Attachment E. Reimbursements shall be in addition to the above and will not exceed $4 ,800 ( four thousand eight hundred dollars) . -2- IN WITNESS WHEREOF, the undersigned have placed their hands and seals upon and executed this Amendment No. 2 in triplicate as though each copy hereof was an original and that there are no other oral agreements that have not been reduced to writing in this statement. For the City: ATTEST: THE CITFOF LGIN ck /7kr-e..t27---By k `t-u By (SEAL) For the Engineer: Dated this ' day of L/Uvie 1993 . ATTEST: By ecretary Pres nt (SEAL) `. fY JJR/ 111 West Washington Street, Suite 1660 Chicago, Illinois 60602 312641 0770 312 6416728 FAX Planning/ LandscapeArchit Urban Design/Civil Engineering/ ngineering/ Environmental Services Johnson Johnson&Roy/inc I U N 07 J g q 2 June 1993 05-053-P028L CITY OF E.LGIN ENGINEERING DEPT. Mr. James L. Kristiansen Director of Public Works City of Elgin 40 Ann Street Elgin, Illinois 60120 Re: Proposal for Construction Administration Services Center City Place Parking Lot Elgin, Illinois Dear Mr. Kristiansen: The Johnson Johnson & Roy/inc (JJR) team is enthusiastic about the opportunity to assist the City of Elgin in construction of the Center City Place Parking Lot. Thank you very much for this opportunity. Based on our meeting with you on 19 May 1993 and subsequent telephone conversations, JJR is pleased to submit this scope of work. We understand this work effort will be handled as a change order to our current contract; therefore, this proposal addresses scope and fee only. The Scope of Services is based upon the following assumption: 1. Substantial Completion for construction will be by 3 September 1993 and Final Completion will be 29 October 1993. We look forward to working closely with the City and your professional staff to complete this effort. If you are in need of additional information to evaluate this proposal, please contact me directly. Sincerely, JOHNSON JOHNSON & ROY/INC Gam` , G?�✓�% Paul J. ese I' Associate PJW:cjb PROPOSAUCNTRCITY Mr. James L. Kristiansen City of Elgin 2 June 1993 Page 2 PHASE V. CONSTRUCTION PHASE 5.1 JJR shall commence Construction Phase services and responsibilities upon the award to a contractor of one contract for construction of the Project and terminate such services at the end of the contractor'seRe 1/1 - year warranty and guaranty period. fiocr/ cv 5.2 JJR shall have access to the construction at all times for the purpose of carrying out and performing duties and responsibilities provided for in this Agreement. 5.3 JJR shall provide on-site construction observation and administration services to maintain and improve the progress and quality of the Work and shall determine, in general, if the Work is proceeding in accordance with the Contract Documents. On the basis of such on-site observations, JJR shall keep the Owner informed with written field reports of the progress and quality of the Work and shall endeavor to guard the Owner against defects or deficiencies in the Work of the contractor. JJR shall not have control or charge of and shall not be responsible for construction means, methods, techniques, sequences or procedures, or for safety precautions and programs in connection with the Work, or for the acts or omissions of the contractor, subcontractors or any other persons performing any of the Work, or for the failure of any of them to carry out the Work in accordance with the Contract Documents. 5.4 JJR shall establish a project directory, identify all parties involved in the construction process and their responsibilities. 5.5 JJR shall maintain orderly files for correspondence, reports of job conferences, shop drawings and samples, reproductions of original Contract Documents including all work directive changes, addenda, change orders, field orders, additional drawings issued subsequent to the execution of the Contract, JJR's clarifications and interpretations of the Contract Documents, progress reports, and other Project related documents. 5.6 JJR shall receive and comment on contractor's list of subcontractors and recommend acceptance/rejections to Owner. 5.7 JJR shall obtain, review and forward to Owner contract bond from contractor, have contractor file certificate of insurance with Owner, have contractor secure and pay for all required permits and obtain, review and approve contractor's progress schedule. 5.8 JJR shall have contractor coordinate any utility shutoffs, removals, adjustments or staking with Owner or appropriate utility company. 5.9 JJR shall, prior to the first application for payment, review the contractors schedule of values and provide written comments to the Owner. Mr. James L. Kristiansen City of Elgin 2 June 1993 Page 3 5.10 JJR shall use our best efforts to review and return all shop drawings and submittals as promptly as possible in less than fourteen (14) calendar days from receipt by JJR. All actions will be entered into the submittal log. 5.11 Review of specified contractor's submittals (such as shop drawings, product data and materials), is for the limited purpose of checking for conformance with the information given and the design concept expressed in the Contract Documents. Review of such submittals is not conducted for the purpose of determining the accuracy and completeness of other details such as dimensions and quantities or for substantiating instructions for installation or performance of equipment or systems designed by contractor, all of which remain the responsibility of contractor to the extent required by the Contract Documents. JJR's review shall not constitute approval of safety precautions or construction means, methods, techniques, sequences or procedures. When professional certification of performance characteristics of materials, systems or equipment is required by the Contract Documents, JJR shall be entitled to rely upon such certification to establish that the materials, systems or equipment meet the performance criteria required by the Contract Documents. 5.12 JJR shall review the percentage of the Work for verifying the accuracy of the contractor's monthly application for payment. Any discrepancies which are observed shall be promptly reported in writing to the Owner. 5.13 At 50 percent completion, JJR shall verify requirements for reduction in retainage. Where applicable, contractor shall submit Consent of Surety. JJR shall check waiver of lien. 5.14 JJR shall promptly review and check the inspection reports and the periodic field test reports and data provided by the contractor and all such other testing and inspection entities as Owner, from time to time, may designate. JJR shall promptly advise the Owner in writing of defects or deficiencies in the quality of the Work as indicated by such testing and inspection reports. 5.15 JJR shall attend meetings with the Owner and contractor and shall prepare and distribute minutes of such meetings. 5.16 JJR shall prepare and distribute bulletins, change orders, clarifications and supplemental instructions for errors and omissions of the Contract Documents, as required during the Construction Phase. 5.17 JJR shall participate in one nursery inspection for inspection, tagging or otherwise approving plant material for use on the project. Mr. James L. Kristiansen City of Elgin 2 June 1993 Page 4 5.18 JJR shall verify that tests, equipment and systems startups and operating and maintenance training sessions are conducted in the presence of appropriate personnel, and that contractor maintains adequate records thereof; and observe, record and report to Owner appropriate details relative to the test procedures and startups. 5.19 JJR shall conduct inspections and issue a Certificate of Substantial Completion setting forth the dates of substantial completion and identifying the "Punch List" of incomplete or unsatisfactory items remaining to be completed. 5.20 JJR shall verify that certificates, maintenance and operation manuals and other data required to be assembled and furnished by contractor are applicable to the items actually installed and in accordance with the Contract Documents, and have this material delivered to Owner prior to final payment for the Work. 5.21 JJR shall conduct subsequent inspections to determine that the contractor has satisfactorily completed all "Punch List" items, and has otherwise complied with the Contract Documents. 5.22 JJR shall receive from contractor the final application for payment along with release of liens, consent of surety, if any, and verify that all other conditions of the contract have been met and issue final certificate for payment of Contractor. 5.23 JJR shall administrate and coordinate the remedial work of the Contractor(s) after final inspection. 5.24 JJR shall review all as-built drawings and all appropriate manuals and written warranties as required by the Contract Documents for compliance with such documents and transmit to Owner. 5.25 JJR shall consult with Owner during the warranty period and make recommendations concerning inadequate performance of materials, systems and equipment under warranty. 5.26 JJR shall visit the site prior to the expiration of the contractor's one (1) year warranty and guaranty period to verify that the Work, and any remedial warranty or guaranty Work, has been completed in accordance with the Contract Documents and assist Owner in administering corrective action from the Contractor. ADDITIONAL SERVICES The following are excluded from the above listed Basic Services. Additional Services shall be provided if and when authorized by the Owner in writing, in advance of performance. II Mr. James L. Kristiansen City of Elgin 2 June 1993 Page 5 - - Prepare and distribute bulletins, change orders, clarifications and supplemental 7 instruction for changes and modifications requested by the Owner or for unforeseen circumstances which may arise during construction. vide : .-h/s pailagraAb 710 be .Ir)clu ded it) Sasic S ei,iicps a be e . -27- Prepare record documents or as-builts, based on information furnished by the /. Contractor, including significant changes in the work made during construction. EXTRA SERVICES In addition to performing the Basic Services and additional services described above, JJR will be available to provide Extra Services during the period of this contract, including but not limited to the following: 1. Preparing written or graphic material for and/or attending public or private hearings, meeting, or conferences with public, quasi-public or private persons, groups, or agencies for the purpose of presenting the plans or any other like action, except as specifically provided in the final Work Plan. 2. Preparing drawings, reports and/or slides required because of revisions in the project program or criteria when such revisions are inconsistent with approvals or instructions previously given; or performing services required to prepare alternate schemes for Client's consideration beyond those described in the description of services. 3. Coordinating and/or reviewing work of any and all others performing services for the project retained by the Client, and by any other person or organization on behalf of the client, except as specifically provided in the final Work Plan. 4. Preparation or coordination of presentation quality perspectives, renderings, or models other than those provided in the course of the work and prepared by the Client's request. 5. Providing services similar to those set forth herein before and not otherwise covered by the contract. Extra services are to be compensated separately. REMUNERATION Basic Services The client shall compensate JJR for the Scope of Services described herein on an hourly basis. The maximum labor fee for this project is outlined below. 1. Construction Phase a. Basic Services through Substantial Completion $24,360 (12 weeks at 24 hours per week at $75 per hour) (12 weeks at 2 hours per week at $45 per hour) (12 weeks at 4 hours per week at $35 per hour) Mr. James L. Kristiansen City of Elgin 2 June 1993 Page 6 b. Basic Services from Substantial Completion $ 5,920 through Final Completion (8 weeks at 8 hours per week at $75 per hour) (8 weeks at 4 hours per week at $35 per hour) -s— --Bas -Ser4ses-f-re final Completion $ 6.700 --t-h-rough-E -d-o#,Warranty Pcriod Gle/� /r - (40-months-at 8 hours per month at $75 per hour) T C/ (10 months at 2 hours per month at $35 per hour) Total $36,980 Reimbursables 34,,10 In addition to the labor fees, we recommend that a budget of $4,800 be established for reimbursable expenses per the attached Standard Fee and Reimbursement Schedule. Extra Services For Extra Services, JJR will be compensated at the hourly rate described in the attached JJR Standard Fee and Reimbursement Schedule for the actual hours worked by JJR staff. The terms and conditions of the current contract dated 20 August 1992 shall also apply to this contract amendment. This document may serve as an agreement between us and you may indicate your acceptance by signing in the space provided below and returning one signed copy for our files. We appreciate this opportunity for providing our services to you on this important project. Attachment jmblproposallctraty AUTHORIZED REPRESENTATIVE: CITY OF ELGIN BY: TITLE: PRINTED SIGNATURE: DATE: AUTHORIZ REPRESENTATI E: HNSON JOHNSON & ROY/inc BY: ITLE: Vice President/Secretary PR INTED SIGNATURE: George L. Sass, ASLA DATE: 2 June 1993 STANDARD FEE AND REIMBURSEMENT SCHEDULE JOHNSON JOHNSON & ROY/inc CHICAGO, ILLINOIS 4 JANUARY 1993 PROFESSIONAL AND TECHNICAL STAFF Senior Principal $125.00/hour Principal $110.00/hour Senior Associate $85.00/hour Associate $75.00/hour Senior Professional Staff/Level 2 $79.00/hour Senior Professional Staff/Level 1 $60.00/hour Professional Staff/Level 2 $55.00/hour Professional Staff/Level 1 $45.00/hour Senior Technical Staff $45.00/hour Technical Staff $35.00/hour These billing rates are subject to semi-annual review and revision. A surcharge of fifty percent (50%) will be added to hourly rates for expert witness testimony and/or for participation at hearings, depositions, etc. REIMBURSABLE EXPENSES Mileage $0.28/mile Travel and Subsistence Cost Telephone, Telex, Telecopy, etc. Cost Postage, Handling, etc. Cost Copies (8-1/2" x 11") $0.10/copy Color Copies (8-1/2" x 11") $2.25/copy Color Copies (11" x 17") $3.75/copy Reproduction and Printing Cost + 10% Materials Cost + 10% Equipment Rental Cost Subcontract Services Cost + 10% Computer expenses for in-house Computer Aided Design and Drafting (CADD) Services shall be billed at $15.00 per machine hour, exclusive of personnel costs. INVOICES Progress invoices shall be issued monthly and payment is due upon receipt. Balances remaining unpaid after thirty (30) days are subject to a monthly finance charge of 1% (12% annually) until paid. Johnson Johnson&Roylinc