Loading...
HomeMy WebLinkAbout91-1023 Jem Morris 91- 10a3 4 RESOLUTION APPROVING CHANGE ORDER NO. 2 IN THE CONTRACT WITH J.E.M. MORRIS CONSTRUCTION, INC. FOR RIVER BANK BIKE PATH, PHASE II WHEREAS, the City of Elgin has heretofore entered into a contract with J.E.M. Morris Construction, Inc. for River Bank Bike Path, Phase II; and WHEREAS, it is necessary and desirable to modify the terms of the contract as is described in Change Order No. 2, attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that Larry L. Rice, City Manager, be and is hereby authorized and directed to execute Change Order No. 2, a copy of which is attached hereto and made a part hereof by reference. s/ George VanDeVoorde George VanDeVoorde, Mayor Presented: October 23, 1991 Adopted: October 23, 1991 Vote: Yeas 6 Nays 1 Recorded: Attest: s/ Dolonna Mecum Dolonna Mecum, City Clerk ELGIN, ILLINOIS RIVER BANK BIKE PATH, PHASE II CHANGE ORDER NO. 2 SCOPE: This Change Order No. 2 covers additional work required because of the compensatory storage done for the work on the east side of the Fox River. The work includes topsoil and seed to cover the excavated area under the Intermodal Transportation Center. The contractor for this project is J.E.M. Morris Construction, Inc. , of Big Rock, Illinois . REASONS FOR CHANGE: This change order is required for the costs associated with the items necessary to restore the bank to it a natural appearance. Complete landscaping of the bank will not be completed until the City Council approves an overall masterplan for the banks of the River in the Center City area. SUMMARY OF CHANGES IN CONTRACT AMOUNT: The amount of the contract will be revised as follows : ITEM ADD Furnish and Install Topsoil $ 1,500 . 00 100 c.y. @$15 per c.y. Seed and erosion control - Salt tolerant low maintenance. 37% Creeping Red Fescue 37% Faults 23% Buffalo Grass 3% Blue Grama 300 s .y. @ $2 . 75 per s .y. 825 . 00 TOTAL NET ADDITIONAL COST $ 2,325.00 -CHANGE ORDER NO. 2 October 4 , 1991 Page 2 The present contract with J.E.M. Morris Construction, Inc. is for $254 ,262 . 65 . By reason of this Change Order No. 2 , the contract for River Bank Bike Path Phase II will be increased in the amount of Two thousand three hundred and twenty-five and no/100 dollars ( $2 , 325 . 00) , the total contract value being Two hundred fifty-six thousand five hundred eighty-seven and 65/100 dollars ( $256,587 . 65) . OTHER CONTRACT PROVISIONS: All other contract provisions shall remain the same. Agreed to this , V,Iday of , 1991 . Recommended: ENGINEERING DIV ON By: /� Date: . "--v�0er�- v1) (q(�! I Accepted: J.E.M. Morris Construction, INC. Party of the Second Part (Contractor) By: (16?, �. Title: L- - Date: Approved: CITY OF ELGIN Party of the Fi t Part (Owner) By: Title: Date• o` Elm 11 1:::> e,.,. Agenda Item No . 91.,. _,_1 J October 3, 1991 MEMORANDUM TO: Mayor and Members of the City Council FROM: City Manager SUBJECT: Fox River Bike Path Phase II Change Order No. 2 PURPOSE: This memorandum will provide the Mayor and Council with information to consider approving Change Order No. 2 for the subject project. BACKGROUND: The City Council approved the change order No 1 to the subject project at their September 11, 1991 meeting. That change order was submitted for your approval in order to complete the compensatory storage necessary to construct the path within the flood plain. With the level of the river at a low elevation it was considered important not to delay the work until the cost of restoration could be calculated. The compensatory storage excavation has been completed. Change Order No. 2 covers the cost of restoring the area under the Intermodal Transportation Center with black dirt and a special mixture of seed along with an erosion blanket to keep the bank in is present location until the seed can germinate and the retain the bank. Further landscaping of the bank will be deferred until a master plan can be developed for this reach of the Fox River. FINANCIAL IMPACT: The current contract is in the amount of $254,262 . 65 . The additional work proposed for the restoration of the bank under the Intermodal Transportation Center is proposed to cost $2,325. 00. The total cost of the contract would increase to $256,587 . 65 . The total amount budged for the construction of the Bike Path is $379,000 (Account Number 388-991-9907) MAYOR AND MEMBERS OF THE CITY COUNCIL October 3, 1991 PAGE 2 RECOMMENDATION: It is recommended that the city Council authorize the City Manager to execute Change Order No. 2 for the River Bank Bike Path Phase II in the amount of $$2,325 . 00. A copy of the change order is attached for your consideration. 11110S. Lasr Rice City Manager Attachment