Loading...
HomeMy WebLinkAbout91-0626 Sinnet • ql - o�ae r � • RESOLUTION APPROVING CHANGE ORDER NO. 1 IN THE CONTRACT WITH SINNETT BUILDERS, INC . FOR ENGINEERING OFFICE IMPROVEMENT WHEREAS, the City of Elgin has heretofore entered into a contract with Sinnett Builders, Inc. for engineering office improvement; and WHEREAS, it is necessary and desirable to modify the terms of the contract as is described in Change Order No. 1, attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that Larry L. Rice, City Manager, be and is hereby authorized and directed to execute Change Order No. 1, a copy of which is attached hereto and made a part hereof by reference. s/ George VanDeVoorde George VanDeVoorde, Mayor Presented: June 26 , 1991 Adopted: June 26 , 1991 Vote: Yeas 5 Nays 0 Recorded: Attest: s/ Dolonna Mecum Dolonna Mecum, City Clerk ELGIN, ILLINOIS ENGINEERING OFFICE IMPROVEMENT CHANGE ORDER NO. 1 SCOPE: This Change Order No. 1 covers the additional items for the Engineering Office Improvements . The general contractor for this project is Sinnett Builders, Inc. of Elgin, IL. REASONS FOR CHANGE: This change order is required for the costs associated with the items requested by Engineering to be added to the improvement to further enhance the working environment for the engineering staff . SUMMARY OF CHANGES IN CONTRACT AMOUNT: The amount of the contract will be revised as follows : ITEM 3 doors for Engineers Offices $ 1,875 Replace two air conditioning difusers $ 170 Paint ceiling in reception & hall area $ 870 Duct work for HVAC in Computer Room $ 630 Replace exterior door with hollow metal in lieu of full lite. $(-) 100 Eliminate hollow metal door and block up opening. $(-) 225 Delete 20 feet of plug mold $( -) 190 Delete 6 feet of 7 foot partitions $(-) 130 Replace carpeting in Engineer's area $ 2,780 Replace carpeting in Secretary's office $ 475 Move door to Conference Room $ 260 Paint walls in Secretary's Office $ 195 Eliminate closet in technicians area $(-) 400 Move printer for gas pumps $ 284 Paint walls & window frame in old drafting room $ 180 Delete removal of sink in drafting room $( -) 90 Delete sound batts in conference room $(-) 240 Furnish & install push/pull plates in Men' s room $ 167 Delete Drywall from computer room $(-) 138 Extra for hardware allowance $ 96 Total Net Additional Cost $ 6,469 y • • CHANGE ORDER NO. 1 June 5, 1991 Page 2 The present contract with Sinnett Builders, Inc. is for $44,060 . By reason of this Change Order No. 1, the contract for the 1991 Engineering Office Remodeling will be increased in the amount of six thousand four hundred sixty nine and 00/100 ($6,469 . 00) , the total contract value being fifty thousand five hundred twenty nine and 00/100 ( $50,529 . 00) . OTHER CONTRACT PROVISIONS: All other contract provisions shall remain the same. Agreed to this ,R67g4 day of , 1991 . Recommended: ENGINEERING VISION By: Date: CD Accepted: SINNETT BUILDERS, INC. Party of the Second Part (Contractor) Title: S .1 — TlLc4,C Date: (o/tS/q I Approved: CITY OF ELGIN Party of the F' t Part (Owner) By: Title: Date: • • i Agenda Item No . 7 V2J_W +�eo rc February 7 , 1991 MEMORANDUM • TO: Mayor and Members of the City Council FROM: City Manager SUBJECT: Engineering Division Office Remodeling Proposal Award PURPOSE: This memorandum will provide the Mayor and Council with information to consider the award of a contract for the Engineering Division Office Remodeling. BACKGROUND: The Engineering Division has outgrown the existing facility at 40 Ann Street. The existing area was remodeled and enlarged to its present size in 1973-74 and now it is too small to house the personnel assigned to the division. An architect was hired in 1990 to complete a design to expand the existing floor space and provide additional offices and room for drafting and computers . The design was laid out to utilize as much space as possible that was available under the roof and still provide space for the Police Department to store various vehicles . This plan would have provided for the addition of new offices and drafting space in the existing garage in the building. The estimate of cost for this work was approximately $250,000 . Based on the intent to incorporate the_ Engineering Division into the operation at the Civic Center within the next five years, it was decided to cut back on the plan and complete only the work necessary to provide working space for the short term. Personnel at B. I .S. were consulted as to how best reduce the scope of the project and still provide the needed additional space. The cut back in scope of the project involved a design/build concept. Three (3) local general contractors who specialize in • , this type of construction were invited to submit proposals to complete the work outlined on the attached sketch. We have also attached a sketch of .the existing office space. MAYOR AND MEMBERS OF THE CITY COUNCIL Ift February 7, 1991 PAGE 2 The three contractors who were invited to submit proposals were: Lamp, Inc. , Pace Construction, Inc . and Sinnett Builders, Inc . All three of the contractor submitted proposals . FINANCIAL IMPACT: The 1991 Budget includes $70,000 . 00 for the remodeling of the office. The low proposal, after review and • clarification, was submitted by Sinnett Builders, Inc . , in the amount of $44 , 060 . All of the proposals were very close to this amount. This leaves a balance of $25,940 in the Capital Budget for the remodeling, of the office area. This balance will enable us to purchase additional furniture beyond what is budgeted for the technical staff and the new Public Works Director. We will also consider acquiring partitions to provide work areas and to reduce the background noise . , Each of these will improve the conditions of the office and give it a more. efficient atmosphere. RECOMMENDATION: It is recommended that the City Council accept the proposal from' Sinnett Builders, Inc. , for the price of $44 , 060 . 00 and authorize, the City Manager and City Clerk to sign a contract for the Remodeling of the Engineering Division' s office. The proposal tabulation sheet is attached for your consideration. c -tit )i ,4 � ')�1 Larkyy L<) Rice, City/Manager Attachments • • • CITY OF ELGIN ENGINEER'S BIDS! BIDS2 BIDS3 TABULATION OF BIDS ESTIMATE OF COST SINNETT BUILDERS, INC. PACE CONSTRUCTION CO. LAMP INC. P.O. BOX 146 450 SHEPARD DR. P.O. BOX 865 CITY OF ELGIN ELGIN ELGIN ELGIN LANE COUNTY, ILLINOIS ILLINOIS ILLINOIS ILLINOIS ENGINEERING BUILDING REMODELING 60121 60123 60121-0865 CITY COST CENTER 708 695-1644 708 695-0132 708 741-7220 JANUARY 31, 1991 BID AS READ $44,060.00 BID AS READ $44,340.00 BID AS READ $44,651.00 TOTAL EST. $0.00 AS CORRECTED $44,060.00 AS CORRECTED $44,340.00 AS CORRECTED $44,651.00 ITEM UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL REMODEL ENGINEERING BUILDING L.S. 1 $0.00 $0.00 $44,060.00 $44,060.00 $44,340.00 $44,340.00 $44,651.00 $44,651.00 PAINT STORAGE STORAGE ROOM ROOM (-ti SIGN SHOP POLICE STORAGE GARAGE . ( -N - - x MEWS \ , P.W.D. 6 o WASHROOM !ASM p0Y OFFICE o z..) 0 x OPEN BOILER OFFICE ROOM SPACE z 0 H Gli z ENGR. ENGR. HALL U w OFFICE OFFICEsx -- EXISTING FLOOrPLAN . 0 , • •.. - STORAGE PAINT ROOM STORAGE ROOM ENGR. TECH. ROOM PN u POLICE STORAGE GARAGE lc, !ii: .fi ,\ • MEN'S WASHROOM \\v _ COMPUTER ROOM 1,i•' wAsion I il i U .. . P. ii �W O c-.'z z a ENGINEER ; aa BOILER ROOM w il O U ca. W SC:4 En r aw ENGINEER ENGINEER ENGINEER HALL za a w cn .. AMINIIIIIIIIIINIMMIIIIIIIMMIIIIIII 1'` s�0 " OS I FJOOE