HomeMy WebLinkAbout91-0626 Sinnet • ql - o�ae
r � •
RESOLUTION
APPROVING CHANGE ORDER NO. 1 IN THE CONTRACT WITH
SINNETT BUILDERS, INC . FOR ENGINEERING OFFICE IMPROVEMENT
WHEREAS, the City of Elgin has heretofore entered into a
contract with Sinnett Builders, Inc. for engineering office
improvement; and
WHEREAS, it is necessary and desirable to modify the
terms of the contract as is described in Change Order No. 1,
attached hereto.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF ELGIN, ILLINOIS, that Larry L. Rice, City Manager, be
and is hereby authorized and directed to execute Change Order
No. 1, a copy of which is attached hereto and made a part
hereof by reference.
s/ George VanDeVoorde
George VanDeVoorde, Mayor
Presented: June 26 , 1991
Adopted: June 26 , 1991
Vote: Yeas 5 Nays 0
Recorded:
Attest:
s/ Dolonna Mecum
Dolonna Mecum, City Clerk
ELGIN, ILLINOIS
ENGINEERING OFFICE IMPROVEMENT
CHANGE ORDER NO. 1
SCOPE: This Change Order No. 1 covers the additional items
for the Engineering Office Improvements .
The general contractor for this project is Sinnett
Builders, Inc. of Elgin, IL.
REASONS FOR CHANGE: This change order is required for the costs
associated with the items requested by Engineering to be added
to the improvement to further enhance the working environment
for the engineering staff .
SUMMARY OF CHANGES IN CONTRACT AMOUNT: The amount of the
contract will be revised as follows :
ITEM
3 doors for Engineers Offices $ 1,875
Replace two air conditioning difusers $ 170
Paint ceiling in reception & hall area $ 870
Duct work for HVAC in Computer Room $ 630
Replace exterior door with hollow metal
in lieu of full lite. $(-) 100
Eliminate hollow metal door and block
up opening. $(-) 225
Delete 20 feet of plug mold $( -) 190
Delete 6 feet of 7 foot partitions $(-) 130
Replace carpeting in Engineer's area $ 2,780
Replace carpeting in Secretary's office $ 475
Move door to Conference Room $ 260
Paint walls in Secretary's Office $ 195
Eliminate closet in technicians area $(-) 400
Move printer for gas pumps $ 284
Paint walls & window frame in old drafting room $ 180
Delete removal of sink in drafting room $( -) 90
Delete sound batts in conference room $(-) 240
Furnish & install push/pull plates in Men' s room $ 167
Delete Drywall from computer room $(-) 138
Extra for hardware allowance $ 96
Total Net Additional Cost $ 6,469
y •
•
CHANGE ORDER NO. 1
June 5, 1991
Page 2
The present contract with Sinnett Builders, Inc. is for
$44,060 . By reason of this Change Order No. 1, the contract for
the 1991 Engineering Office Remodeling will be increased in the
amount of six thousand four hundred sixty nine and 00/100
($6,469 . 00) , the total contract value being fifty thousand five
hundred twenty nine and 00/100 ( $50,529 . 00) .
OTHER CONTRACT PROVISIONS: All other contract provisions shall
remain the same.
Agreed to this ,R67g4 day of , 1991 .
Recommended:
ENGINEERING VISION
By:
Date: CD
Accepted:
SINNETT BUILDERS, INC.
Party of the Second Part (Contractor)
Title: S .1 — TlLc4,C
Date: (o/tS/q I
Approved:
CITY OF ELGIN
Party of the F' t Part (Owner)
By:
Title:
Date:
•
• i Agenda Item No . 7
V2J_W
+�eo rc
February 7 , 1991
MEMORANDUM
•
TO: Mayor and Members of the City Council
FROM: City Manager
SUBJECT: Engineering Division Office Remodeling
Proposal Award
PURPOSE: This memorandum will provide the Mayor and Council
with information to consider the award of a contract for the
Engineering Division Office Remodeling.
BACKGROUND: The Engineering Division has outgrown the
existing facility at 40 Ann Street. The existing area was
remodeled and enlarged to its present size in 1973-74 and now it
is too small to house the personnel assigned to the division.
An architect was hired in 1990 to complete a design to expand
the existing floor space and provide additional offices and room
for drafting and computers .
The design was laid out to utilize as much space as possible
that was available under the roof and still provide space for
the Police Department to store various vehicles . This plan
would have provided for the addition of new offices and drafting
space in the existing garage in the building. The estimate of
cost for this work was approximately $250,000 . Based on the
intent to incorporate the_ Engineering Division into the
operation at the Civic Center within the next five years, it was
decided to cut back on the plan and complete only the work
necessary to provide working space for the short term.
Personnel at B. I .S. were consulted as to how best reduce the
scope of the project and still provide the needed additional
space.
The cut back in scope of the project involved a design/build
concept. Three (3) local general contractors who specialize in
• , this type of construction were invited to submit proposals to
complete the work outlined on the attached sketch. We have also
attached a sketch of .the existing office space.
MAYOR AND MEMBERS OF THE CITY COUNCIL Ift
February 7, 1991
PAGE 2
The three contractors who were invited to submit proposals
were: Lamp, Inc. , Pace Construction, Inc . and Sinnett Builders,
Inc . All three of the contractor submitted proposals .
FINANCIAL IMPACT: The 1991 Budget includes $70,000 . 00 for the
remodeling of the office. The low proposal, after review and
• clarification, was submitted by Sinnett Builders, Inc . , in the
amount of $44 , 060 . All of the proposals were very close to this
amount. This leaves a balance of $25,940 in the Capital Budget
for the remodeling, of the office area.
This balance will enable us to purchase additional furniture
beyond what is budgeted for the technical staff and the new
Public Works Director. We will also consider acquiring
partitions to provide work areas and to reduce the background
noise . , Each of these will improve the conditions of the office
and give it a more. efficient atmosphere.
RECOMMENDATION: It is recommended that the City Council
accept the proposal from' Sinnett Builders, Inc. , for the price
of $44 , 060 . 00 and authorize, the City Manager and City Clerk to
sign a contract for the Remodeling of the Engineering Division' s
office. The proposal tabulation sheet is attached for your
consideration.
c -tit )i ,4 � ')�1
Larkyy L<) Rice, City/Manager
Attachments
• • •
CITY OF ELGIN ENGINEER'S BIDS! BIDS2 BIDS3
TABULATION OF BIDS ESTIMATE
OF COST SINNETT BUILDERS, INC. PACE CONSTRUCTION CO. LAMP INC.
P.O. BOX 146 450 SHEPARD DR. P.O. BOX 865
CITY OF ELGIN ELGIN ELGIN ELGIN
LANE COUNTY, ILLINOIS ILLINOIS ILLINOIS ILLINOIS
ENGINEERING BUILDING REMODELING 60121 60123 60121-0865
CITY COST CENTER 708 695-1644 708 695-0132 708 741-7220
JANUARY 31, 1991
BID AS READ $44,060.00 BID AS READ $44,340.00 BID AS READ $44,651.00
TOTAL EST. $0.00 AS CORRECTED $44,060.00 AS CORRECTED $44,340.00 AS CORRECTED $44,651.00
ITEM UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL
REMODEL ENGINEERING BUILDING L.S. 1 $0.00 $0.00 $44,060.00 $44,060.00 $44,340.00 $44,340.00 $44,651.00 $44,651.00
PAINT
STORAGE STORAGE
ROOM ROOM
(-ti
SIGN SHOP
POLICE STORAGE GARAGE . (
-N - - x MEWS
\ , P.W.D. 6 o WASHROOM
!ASM p0Y
OFFICE o
z..)
0
x OPEN BOILER
OFFICE ROOM
SPACE z
0
H
Gli
z ENGR. ENGR. HALL U
w
OFFICE OFFICEsx
--
EXISTING FLOOrPLAN
.
0 ,
• •.. -
STORAGE PAINT
ROOM STORAGE
ROOM
ENGR. TECH. ROOM
PN
u
POLICE STORAGE GARAGE lc, !ii:
.fi
,\
•
MEN'S WASHROOM
\\v
_
COMPUTER ROOM 1,i•'
wAsion I
il
i U .. .
P.
ii �W O
c-.'z z a ENGINEER ; aa BOILER ROOM
w il O
U ca.
W SC:4 En r
aw ENGINEER ENGINEER ENGINEER HALL
za a
w cn
..
AMINIIIIIIIIIINIMMIIIIIIIMMIIIIIII
1'` s�0 " OS I FJOOE