APPROVING CHANGE ORDER NO. 1 IN THE CONTRACT WITH
PYRAMID CONCRETE & BLACKTOP FOR THE
ELGIN PEDESTRIAN AND BIKE PATH
WHEREAS, the City of Elgin has heretofore entered into a
contract with Pyramid Concrete & Blacktop for the Elgin
Pedestrian and Bike Path; and
WHEREAS, it is necessary and desirable to modify the
terms of the contract as is described in Change Order No. 1,
attached hereto.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF ELGIN, ILLINOIS, that Larry L. Rice, City Manager, be
and is hereby authorized and directed to execute Change Order
No. 1, a copy of which is attached hereto and made a part
hereof by reference.
s/ George VanDeVoorde
George VanDeVoorde, Mayor
Presented: May 8, 1991
Adopted: May 8, 1991
Vote: Yeas 7 Nays 0
Recorded:
Attest:
s/ Dolonna Mecum
Dolonna Mecum, City Clerk
Illinois Department Request for Approval Municipality Elgin
of Transportation of Change in Plans
Township
•
County Kane
Elgin Pedestrian and
Section Bike Path
Request No. _ 1 Revised
To: City of Elgin
tnti#1/Mf f IAMON April 1 , 19 91
Elgin , Illinois Contractor Pyramid Concrete & Blacktop
I recommend that an sxteasbe made the above contract.
deduction from
(between Station 539+43± and Station 550+13± a net length of lineal feet.)
(Do not fill In unless a change in length Is Involved.)
The estimated quantities are shown below and the contractor agrees to furnish the materials and do the work at the
contract unit prices.Show station location for major items. See Exhibit A
Item No. Items Additions Deductions
9. Concrete Barrier Wall (1070 L.F. @ $28.98) $31,008.60
9A. Install Plastic Barrier Wall (Lump Sum) $ 4,820.00
*Agreed Price Letter
medditdea 26,188.60 38.7e Totals: $ 4,820.00 $31,008.60
Total net deduction to date$ which is_/o of Contract price.
Net Change 26,188.60
State fully the nature and reason for the change: To reduce total weight on parking deck
Signed 19 Sign 1 1 1991
Highway Commissioner
Approved Resident Engineer
Recommended
County Superintendent of Highways XV01/273411krabldS10106X
Note: Make out separate form for change in length quantities. Approved 19 91
Give net quantities only.
Submit 3 copies of this form to district engineer(4 copies for road district)
If plans are required attach three sets.
BLR6301 Ci Manager
(4-86)
•• • �C4/04/91 05:12 70082533500 PYRAMID CONCRETE INC PAGE 01
• ti
CON ET
& BLACKTOP 437 S. Patton Avenue A Arlington Heights, IL 60005 A (708)253.3500 A FAX (708) 253-2771
April 04, 1991
Mr. Dick Hampton
Hampton , Lenzini & Renwick , Inc.
Civil Engineers
3130 Shepard Drive
Elgin , Illinois 60123--7010
RE: Change Order - Item 9A,
Install Barrier Wall
Dear Mr. Hampton ,
We hereby propose to due the following work :
e1 : To install plastic traffic dividers, dividers
and epoxy to be supplied by the City of Elgin .
Total Cost Installed Labor Only : $4,820.00
Respectully submitted ,
Jeff Sanders, President Bob Leahy
Pyramid Concrete & Project Manager
Blacktop, Inc.
EXHIBIT A
This phase of the Bike Path was designed without the knowledge
that the existing Riverside Parking Deck has a load limit of 5
tons . The proposed concrete curb has a unit weight of
approximately 10 tons per 10 foot section which would have
drastically overloaded the deck. It was, therefore, necessary
to find a lighter weight barrier for the path. The plastic
barrier wall has a unit weight of 400 pounds per 10 foot section
and was well within the limits of the deck.