HomeMy WebLinkAbout91-0508 Pyamid Concrete ill-oSo8 .r RESOLUTION APPROVING CHANGE ORDER NO. 1 IN THE CONTRACT WITH PYRAMID CONCRETE & BLACKTOP FOR THE ELGIN PEDESTRIAN AND BIKE PATH WHEREAS, the City of Elgin has heretofore entered into a contract with Pyramid Concrete & Blacktop for the Elgin Pedestrian and Bike Path; and WHEREAS, it is necessary and desirable to modify the terms of the contract as is described in Change Order No. 1, attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that Larry L. Rice, City Manager, be and is hereby authorized and directed to execute Change Order No. 1, a copy of which is attached hereto and made a part hereof by reference. s/ George VanDeVoorde George VanDeVoorde, Mayor Presented: May 8, 1991 Adopted: May 8, 1991 Vote: Yeas 7 Nays 0 Recorded: Attest: s/ Dolonna Mecum Dolonna Mecum, City Clerk Illinois Department Request for Approval Municipality Elgin of Transportation of Change in Plans Township • County Kane Elgin Pedestrian and Section Bike Path Request No. _ 1 Revised To: City of Elgin tnti#1/Mf f IAMON April 1 , 19 91 Elgin , Illinois Contractor Pyramid Concrete & Blacktop I recommend that an sxteasbe made the above contract. deduction from (between Station 539+43± and Station 550+13± a net length of lineal feet.) (Do not fill In unless a change in length Is Involved.) The estimated quantities are shown below and the contractor agrees to furnish the materials and do the work at the contract unit prices.Show station location for major items. See Exhibit A Item No. Items Additions Deductions 9. Concrete Barrier Wall (1070 L.F. @ $28.98) $31,008.60 9A. Install Plastic Barrier Wall (Lump Sum) $ 4,820.00 *Agreed Price Letter medditdea 26,188.60 38.7e Totals: $ 4,820.00 $31,008.60 Total net deduction to date$ which is_/o of Contract price. Net Change 26,188.60 State fully the nature and reason for the change: To reduce total weight on parking deck Signed 19 Sign 1 1 1991 Highway Commissioner Approved Resident Engineer Recommended County Superintendent of Highways XV01/273411krabldS10106X Note: Make out separate form for change in length quantities. Approved 19 91 Give net quantities only. Submit 3 copies of this form to district engineer(4 copies for road district) If plans are required attach three sets. BLR6301 Ci Manager (4-86) •• • �C4/04/91 05:12 70082533500 PYRAMID CONCRETE INC PAGE 01 • ti CON ET & BLACKTOP 437 S. Patton Avenue A Arlington Heights, IL 60005 A (708)253.3500 A FAX (708) 253-2771 April 04, 1991 Mr. Dick Hampton Hampton , Lenzini & Renwick , Inc. Civil Engineers 3130 Shepard Drive Elgin , Illinois 60123--7010 RE: Change Order - Item 9A, Install Barrier Wall Dear Mr. Hampton , We hereby propose to due the following work : e1 : To install plastic traffic dividers, dividers and epoxy to be supplied by the City of Elgin . Total Cost Installed Labor Only : $4,820.00 Respectully submitted , Jeff Sanders, President Bob Leahy Pyramid Concrete & Project Manager Blacktop, Inc. EXHIBIT A This phase of the Bike Path was designed without the knowledge that the existing Riverside Parking Deck has a load limit of 5 tons . The proposed concrete curb has a unit weight of approximately 10 tons per 10 foot section which would have drastically overloaded the deck. It was, therefore, necessary to find a lighter weight barrier for the path. The plastic barrier wall has a unit weight of 400 pounds per 10 foot section and was well within the limits of the deck.