HomeMy WebLinkAbout91-0109 Albin Carlson Q1- 0109
RESOLUTION
APPROVING CHANGE ORDER NO. 1 IN THE CONTRACT WITH
ALBIN CARLSON & COMPANY FOR THE
NATIONAL STREET BRIDGE REHABILITATION
WHEREAS, the City of Elgin has heretofore entered into a
contract with Albin Carlson & Company for the National Street
bridge rehabilitation; and
WHEREAS, it is necessary and desirable to modify the
terms of the contract as is described in Change Order No. 1,
attached hereto.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF ELGIN, ILLINOIS, that Larry L. Rice, City Manager, be
and is hereby authorized and directed to execute Change Order
No. 1, a copy of which is attached hereto and made a part
hereof by reference.
s/ George VanDeVoorde
George VanDeVoorde, Mayor
Presented: January 9, 1991
Adopted: January 9, 1991
Vote: Yeas 5 Nays 0
Recorded:
Attest:
s/ Dolonna Mecum
Dolonna Mecum, City Clerk
ELGIN, ILLINOIS
National Street Bridge Rehabilitation
PROJECT #3040
CHANGE ORDER NO. 1
SCOPE: This Change Order No . 1 will provide funds for the
additional sidewalk and deck repairs on the
National Street Bridge
The general contractor for this project is Albin
Carlson & Co . , of Melrose Park , IL .
REASONS FOR CHANGE: This Change Order is required for the
costs associated with additional bridge deck and sidewalk
repairs within the project limits . This additional work was not
anticipated at the time of bidding because the condition of the
concrete could not be determined until the surface was removed .
Once the existing surface was removed it was evident that
additional concrete patching would be required to maintain the
integrity of the structure.
SUMMARY OF CHANGES IN CONTRACT AMOUNT: The amount of the
contract will be revised as follows:
ITEM ADD
16) Deck Slab Repair (Partial Depth ) $ 30, 317.50
19) Bridge Sidewalk Repair (Partial Depth ) 35,060.40
20) Bridge Sidewalk Repair (Full Depth ) __ 1215631„62
Total 77,940.52
Total Cost of all work $450,060.31
Contract Amount 374 ,863. 15
Difference (Change Order Amount ) $ 75, 197. 16
The difference between $75, 197. 16 and $77 ,940 .52 comes from the
various other "added" and "deducted" quantities ( see the
attached payment estimate) . Item numbers 16 , 19, and 20
represent the largest added quantities.
The present contract with Albin Carlson & Co ' is for
374,863. 15. By reason of this Change Order
No . 1 , the contract for the National Street Bridge
Rehabilitation Project will be increased in the amount of
seventy-five thousand one hundred ninety-seven and 16/ 100
( $75 , 197. 16) , the total contract value being four hundred fifty
thousand sixty and 31 / 100 < $450,060.31 > .
CHANGE ORDER NO. 1
December 4, 1990
Page 2
OTHER CONTRACT PROVISIONS: All other contract provisions shall
remain the same.
12 �
Agreed to this ��� T�day of ����C� � w°
� -kv_ , 1990.
Recommended :
ENG%NE I S%ON
By: ��-�-~��
Date: )21 /01;71
Accepted :
ALBJN CARLSON & COMPANY
Party of the Second Part (Contractor )
By: ZL-, --
Title:
7'-
Date: /e,60790
___
Approved :
CITY OF ELGIN
Party of the F. t Part ( Owner )
uy:__l__ �� ___ _�L- __
`' ,
~
Title:_-_- _'_//__ _i
Date:____ f_ __/ 9P/
El
in
eft t)1 Agenda Item No. P
„Irk
December 6, 1990
MEMORANDUM
TO: Mayor and Members of the City Council
FROM: City Manager
SUBJECT: National Street Bridge Rehabilitation Contract
Change Order
PURPOSE: This memorandum will provide the Mayor and Council
with information to consider the authorization of additional
funds for the subject project.
BACKGROUND: The original approved contract was in the amount
of $374, 863. 15. The amount of the final payment has increased
due to additional deck and sidewalk repairs. The original
quantities for these items were only estimates and could not be
determined exactly until the top surface of the sidewalk and
bridge deck were removed. Upon removal it was discovered that
the material under the surface was badly deteriorated and needed
additional patching. This discovery is consistent with the
similar problems encountered by IDOT in its rehabilitation of
the Chicago and Highland bridges which resulted in quantity
increases in the Route 58 project.
FINANCIAL IMPACT: The final construction cost of the subject
project is $450,060. 31 . This is a $75, 198 . 16 increase to the
original contract. The additional funds for this work are
available in the unexpended monies in the 1989 Bond Fund (#389) .
RECOMMENDATION: It is recommended that the Council approve the
Change Order No. 1 and direct the Staff to prepare the necessary
resolution. A copy of the Change Order is attached for your
consideration.
ommia.
A/Or
wy
La — L. Ripe, City Manager
ELGIN, ILLINOIS ",
National Street Bridge Rehabilitation
PROJECT #3040
CHANGE ORDER NO. 1
SCOPE: This Change Order No. 1 will provide funds for the
additional sidewalk and deck repairs on the
National Street Bridge
The general contractor for this project is Albin
Carlson & Co. , of Melrose Park, IL.
REASONS FOR CHANGE: This Change Order is required for the
costs associated with additional bridge deck and sidewalk
repairs within the project limits . This additional work was not
anticipated at the time of bidding because the condition of the
concrete could not be determined until the surface was removed.
Once the existing surface was removed it was evident that
additional concrete patching would be required to maintain the
integrity of the structure.
SUMMARY OF CHANGES IN CONTRACT AMOUNT: The amount of the
contract will be revised as follows :
ITEM ADD411
16) Deck Slab Repair (Partial Depth) $ 30,317 .50
19) Bridge Sidewalk Repair (Partial Depth) 35, 060. 40
20) Bridge Sidewalk Repair (Full Depth) 12,563 . 62
Total 77,940. 52
Total Cost of all work $450,060.31
Contract Amount 374 ,863. 15
Difference (Change Order Amount) $ 75, 197 . 16
The difference between $75, 197 . 16 and $77,940.52 comes from the
various other "added" and "deducted" quantities (see the
attached payment estimate) . Item numbers 16, 19, and 20
represent the largest added quantities.
The present contract with Albin Carlson & Co. is for
374,863. 15. By reason of this Change Order
No. 1, the contract for the National Street Bridge
Rehabilitation Project will be increased in the amount of
seventy-five thousand one hundred ninety-seven and 16/100
($75, 197 . 16 ) , the total contract value being four hundred fifty
thousand sixty and 31/100 ($450,060. 31 ) .
ft.
f CHANGE ORDER NO. 1
December 6, 1990
Page 2
OTHER CONTRACT PROVISIONS: All other contract provisions shall
remain the same.
Agreed to this day of , 1990 .
Recommended:
ENGINEERING DIVISION
By:
Date:
Accepted:
ALBIN CARLSON & COMPANY
Party of the Second Part (Contractor)
By:
Title:
Date:
Approved:
CITY OF ELGIN
Party of the First Part (Owner)
By:
Title:
Date:
r
. <A,��r
t r ENGINEER'S-PAYMENT-ESTIMATE.: : - , - ' _ -
ESTIMATE NO. Z PROM 11I TO III {Road District)
PAYABLS TO Albin Carlson • .. - - - MUNICIPALITY EL(.-„, •
ADORER 3000 Lake Street, Melrose Park, IL 60160 rasion ,
1 .AWAROEO AOOED PEON. COMeLETEO
STEAM Unit }p� T—STM VALUES fouarrnro causprrrn CWakfnTY soar TRICE VALUES .
�
Tree Removal (6 to 15 inch In Dia 41 705 410 1 I • , 417 15_On7D 3 0(
Diameter)
Trench Backfill Cu Yd 4 160 110 4 v 0-QL. 6 p
Bituminous Materials Gal 40 200 00 j NO 5.00 ') r O r o
(Prime Coat) T I J
Aggregate (Prime Coat) Ton l 35 90 _ 31 , 35.00 0
Bituminous Surface Removal Sq Yd 250 2.,500 00 ((02.82
. 3� •P 10.00„J Y GO
(Cold Milling)
Sawing Pavement (Full Lin Ft 170 ' 850 00 148.0 71.4 COQ I / O 7 co
Depth)
Pavement Removal Sa Yd 120 720 00 114137 _?. /2 6.00, /1? 778
Approach Slab Repair Sa Ft. 10 900 00 29205 310-1' 10-.JOD. 3C-;.7 o o
(Partial Depth) ,
_Approach Slab Repair So Yd - 4 280 1)0 4 0 70,_0 0
(Full Depth)
. . • • - - . s, • • - .8 3. 3 i - a ii
Pavement. 10”
- .,- . • : . • • . I :I II 12.0 I c9
Si APWAl k RpmnnA1 AnA So Ft 500 800 20 , z02.17,A51.S?..3 1.60 4-1 7(f' 3
Revlacement • I
X
) Bituminous Concrete Sq Yd ' 1350 20.250 Q0 (3S 15.00 0 75000
Surface Removal
i Concrete Bridge Deck Sa Yd 1350 18.022 50 f 3SO 13,35 1 £' 2Z 5L7
Scarification (1/4 inch) - •
j Bridge Sidewalk So Yd 571 10.278,D0 - - 3-71 I 15.00 1 O 27F' G0
Scarification (1 inch)
I - . : . . - .: •- - • • • . . , 241Z. 3 •S II IA i. so
TOTALS :. .. .
MISCELLANEOUS EXTRAS AND CREDITS VALUES
i-`! i (rF. ;rt-R ( i•"F-:,J6F /At IT4 &AA/c— ,:
/ vSfh 1�j .1
r:: r_ C f-.., r? y free F_''TWA NAT • Jar- LOC# ,N4.- -(-r•'i E-.S_
Cr 15 t1CT1VA 1.c,iC 0 'AU 4•"dS7 7...) , 141411 1-4.1 :� -- 'L • .
lo7G 2G -
• L', rs /,..l C-�o L-S .0),./ c (ti.a - . - - .••
:_ �. i
V • - ' 4l4 84 05
40).0(.0. 3/ ' .5-721 k i f
. • }*-,. -^-, -.r: -_ ---TOTAL MISCELLANEOUS EXTRAS AND CREDITS : 410 lir 3.6 -
_ - - - • • -- . • TOTAL VALUE OF COMPLETED WORK - , `._• -- 74— -/-1-4
. EDUCT RETAtNACE
0.0%
' BALANCE DUE ON COM►LETEO WORK :` 1-' . _
' -- e. , '-` AItSCELLANEOUS DEBITS -' " • •`.• -•.... , - VALUES 4 .OriO� 3/ `
• O'S-r1 m ATE #• I PIA bG 3 d • ----
TOTAL OF DEBITS . 'tip, G,G,3 I (,G
*MT AMOUNT.OUE - ? / t_ rn i i _7 n
„14m. Dta"-br 3 ..-1s.- , .. - _ ..t _ • • -• - .230-7,317. 22
l'")
FlROVED /€, 3 • - r .1, e•i! P/' %0:1— d - GL.i,,, - `�f PvTIsI.
TM.
DAY • - S •NS SNOW ESTIMATED QUANTITIES AND VALUES. 8I.R 63(
V*' j oru'a Depastrnent _ l , ;of Transportation `_
__ -•`TM' .'t a^.i-=. . .� r Ty
' ' -ENGINEER'S- PAYMENT ESTIMATE •
/TI«o: . :.. y c (Rood Oaa+et}
Aim TO MUNICIPALITY
ADDRESS • - • • . _ tioecwtt -
*AwAROEO 1 ADDED pEOUCTEtt COUP-CTEO
. . - -ITEM' unit u.,n iv vALucs 1OumNn-ro ouomnrt aimNn ry Ipvtr ttlttcE ma.LuEs
i Deck Slab Revair (Full Sq _"1.4 2r) A,,QQII 1i 20 0 O0, 0
Depth, Type I) - i
3 Deck Slab Repair (Full So Yd 10 3-000 At $.51 1,41 inn_nn HI? 2 t,,
Depth, Type ii)
) Bridge Sidewalk Repair - • Sq Ft 514 t 7,710 10 2,37.36.1 WSL36 15.00 .i•- .7-70 ctri
(Partial Depth) 1
) Bridge Sidewalk Repair So Ft 257 5.397 10 918.ZZI PI,.22. 21.00 71S' 7_
(Full Depth) • ' •
. # 7 '1 . . $ 2500.1)0 - 'C' w0
j Class X Concrete ' Cu Yd 7.8 2.730 10 'I,3' 350.00 '3.13---t> Cr,
2" (Mndified) _
i . .t ._ ea . ..• - - 'a t a 1/ - a • I 1 t 2 op 0 ?SG, o•
a t - • a a . 1 a 1 , $ 1 ro ■ NIM 11 _ dr 0
. . -• - 1,. it, -:•-•-•:', i . •
.x .-r'. - . .. - - .
• - is z-d '- _ • 'le Deck r-S. Yd 571 - --18 843 10 / . 1 S, 3 .0+ !Mir- G
#1 111111111111111111111111111111
7 Pipe Drain, Bituminous Lin Ft 9 5,5 1 10 1.,g . 1, 11 -3 0
Coated -Corrugated Steel. •-. --. -•• , -• -
I2 �---
13 Catcli Basins. -Tvvr C. Each •2 -`1,450 t0 • ., a 725.00 jyt'r - 00
•
p . 23 Frame 'and Grate= ' --.- • - - : • • - . . - •
rete 'Slopewall, - -Sq Yd It - ' 'til_.-'6. 10 - - •• . . y - - 1.50 to {)0
Tvoe I •(Svecial) • a - - .
D Reinforcement Bars. Epoxy • Lin Ft 4800 12,000 /0 , 2ao3 1 6 E 3) 2.50 1?O 7 7 XI,
Coated -' ` - 5
_ , - . .'>`-- in Ft ' 100 5.-1225 I 0 • __ .• 00 , 2.25 r
Joints sad Flan¢eways ' - _ - --" •• 11111111110111.1111 '
TOTALS _.-=i'' - -- . .. _ .. . :.7 ?-1, , :2 '•::, . _`:-='-.1•-•.•.,. .:4 •,_ , - .. . - _ ,
MISCELLANEOUS EXTRAS AND CREDIT= ; • ',.•• . - • ,. VALUES
.. a .rte ... •..- . _l .•-�I- _ - >r. . f.;-' i - • •., l .' -'•.. .•' -`+
•
'" ?,W,," ..'%;:•`.:_^';.e"'•' Law.. :6;4-..•— .. -' .'-'••_•11"CITALIMISCELLIINEOUSEXTRASANDCREDITS - •----- • -, •-•
- • - - - -- -. - - - -TOTAL VALUE OF COMPLETED WORK •' .
;:p V4 .:;.�. ...t. >:> y.: - bEOtICTRETAiNAGE --.,_. s- • . .. - ,.
' ' BALANCE DUE ON COMPLETED WORK - 5 1 - -
• - MISCELLANEOUS Dcetjj' VALUES
774y .. - . , . 'fit�'-:,i t' • :1".°1-41.""---TOTAL OF DENTS •"" • ..-
iMETAMOUNTDUE --
- .
SIGNED' . 1!
,.� •
TIT
APPROVED ,1! - - -
. . = v ,. , :r TIT
' ' "'FOR DAY LASOR SECTIONS WOW' ESTIMATED QUANTITIES AND VALUES. SLR
• V%I....,.5Kiertiiiliirriaid`o'ii-7 :. . .. ' . - - ,
* - • 'ENGINEER S- PAYMENT ESTIMATE .
. ESTIMATE NO. • - _ • • -if -TO - IS Mod District/
.. • . -
. . •
VAYAMILE TO " - ,. • . - .
- - 4IUNICIFALITY ' -
ADDRESS Semis* #
spen•TIsrAilltDCO ir=
: ---- Cossirt.rrE 0
ITEMS Unit *imams touamrsr.0 - ourimnry SIMITIMKE VALUES
i2 Bituminous -Concrete - Ton • . 44 ' q 49(i. WI L 4.-11, 110_,.00 s'iti&O CO
Surface Course, Mixture D,
Class I, Type 2 --)
3 Protective Coat So Yd 2021 1_11q t.5 JS-72 •64,ii A Aq 4-42-I
4 Epoxy Crack Seal:EN? tin Fr110111_,A.nno an 1 /9.1 S-Oli An cm -3 .o(-1 00
5 Pneumatic Applied Concrete So Ft 200 :.000 , 00 2.ee, 40_00
6 Formed Concrete Renair Cu Ft in . 1_,nn •nnI 159 /44 #9n Cia_a_n?.?0 CN,
7 : . - - - . - . ' 4 4 . 1 1 II &A . is 4-II * v()
8 Clean and Paint Bridge Each 40 5..800 , 00 qp 145.00 _ :57'00 z7r,
Bearings
9 Cleanin: and Paintin: Lin Ft 631 $ ## 1> 66 /0
Metal Handrail
3 Thermoplastic Pavement SQ Ft 627 877 SO_ • toe4. . 0.8? L40 a.-3 7,--
Marking, Removal ' • - . ••• ...•
,
• .: . . ., - .- . a, . . • - ' 4 • ' , 116 . II 53.# , _. - • . 0, . 5- .
%-Letters 4--Svmbols -,-:-'•-•,, ---- --• ?'' '7 ,' i. '' -- - '' ' -
. -
:6 - ii 155.13 6.- %- I . _ O '
Line 4" '
'. s is $
41, SO
Line24"- ---: - --.' -t- - - - •* — - - . . .. ..•.. •.. • -
'
• "- , 4., s 4 . .711 . 4 • ' • . 01 . .- o - ••
.e III Letters 4 S ..bols IIIIIMMIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII .
i Pavement Marking Tape,- . - -Lin Ft 7000 ' 10.500 00 fic35 SOOS- 1:50 7S-0 . .5-003
Type III. 4"
iThe .•o. • - .. • : II
— - - - . ..,• • - %. r I-*- IMIIIEIINIIIIIMIIIMIIIIIIIIIIMIMII .
° II - 411 4 • • Z - II' 4 4" . • , linirriM1111111111111111111111111111 4 '
-Warkina—Line A"' •- • - -. :• ,. --."-, --- '
_• - -._
• ,, - • ,
*.. .
• -,..1.--.,.:.., ' ...-- '. . - , - -MISCELLANEOUS EXTRAS AND CREDITS . - • - • • VALUES - •-- '
•-• . ,
1-
Pr`e-Cile'vvete„,,{.3,A6.4fk. Pittie.44-s.",3- _
-S4-. - brie ... - 3, t 33 - , . , • , . __
• 3 4 0.-4, 5 .. . 1,c.: ....- -17 `.S ' '•1-• 1 - - •''' s - - ---* ' '17- •.**. -. - - ,.-
._ .. - ... . •
, .
. , . . . , . . . . - . . . ' •
•
.. . . • - .-
, . . . . , . . .. .. .. __
. . . .
. .
. _ .
• ' . .
.. .
... , , r , ..... .. . . , ,
- •••• - • -f *Tom.MISCELLANEOUS EXTRAS AND CREDITS • •• • . . • .
:- ..- ...--- .-.- . ,.
OM 1. __.: • _- • . ,- VALUES • ..
-
• ' : .- - -, _. ,_-., .•••. .:...-.•.:-•:. -...---.•; ...,--.- - . -.. --.--,-----',••••• ---- .-. ; ----, -- :,---VOTAL OF DEBITS --.*. :,'". 1
. . „. _.
XDOEIr 9.111/ * ' * - . • .
_. :-
. .
.. •
!PROVED ".15 "-
TITI.
. • . . ..
. - TITL
.. *
• • ' — .
`FOR DAY LABOR SECTIONS SHOW ESTIMATED OUANTITIES AND VALUES. LA 63c
, • '
- •-,-- ,--:--, • , --I.• ---, 4-- '-; •,-.4----'-' .;.1";;;,.-,::..-4.;-,...-:-t••:i:.-;:,-.C.-:: ,*i.,-....•'. - - - - • , -, `• "„ • - - - •••:::--: • •- •...
nai
• :‘,1.7.,,,
`w
. .. +aNW LduUil
..' COUNTY
• 'Ti ENG INEER'.S—PA YMENT -EST1MATE .,7 : : ::-. -d-
ESTIMATE NO. PROM • ti _TO 11 Mood Diaries!
AYAELR TO -MUNICIPALITY '
•
• !DRESS
Sa tiew
•AwAa0EO 1Aooco oD.x1t4 comoLrrca
ITEMS Unit TV VALUES IpuN4TITY gUANTTTrOU N11TY II'+tT anCE VALUES
+8 Thermoplastic Pavement Lin Ft 107 214_ 0Q 1 2_ 44
Markin- — Line 6"
t9 Thermoplastic Pavement Lin Ft 24 I 90_ 00 _ 3_?5 -
Marking — Line 12" ,
4 Thermoplastic Pavement Lin Ft 62 ' 496, 00, , B-.00
Marking — Line 24"
.1 Drill & Grout Dowel Bar- c I I s- — ,
A::re:ate o em. . : A • , I 1 I I 70 M " 1 I P
Access " - ,
3 Traffic Control & ' Ls Sum 1 14.000 00 I 4DIIn_nn 1'1 ray OO
Protection
Y• . • , ,, 1 $55 ii Ails ll 'D/) ' n On
5 Railroad Protective L.Sum 1 15,000 00 1 4500000 /sac, O2 -
Liability Insurance �t1JD
� .
6 Protective Shield So Ft 2108 , 4.2)6 nn , 21a6 D I 9_nn _ _- — di'Th
7 Adjusting Tries-4n - - 'er11 " ' 1'? , •1 ,'cnn stn . I , i_+. 1 19c op 1 SC)O ea"
Elertrirs1 Rnxafi ,
•
i
---r , 4111.101111MM•11111==
•
,.. .
TOTALS . _ • . . _. • - ala,g5l 15
• - MLA
ISCELNEOUS EXTRAS AND CREDITS • • : • • • VALUES #05-1 444
•. `- ,-,. , - •-- -. s. . •- - . . TOTAL MISCELLANEOUS EXTRAS AND CREDITS
- • - TOTAL VALUE OF COMPLETED WORK •- ' • • • • .
'DEDUCT RETAINAGE . • 4 -
-BALANCE DUE ON COMPLETED PORK - •. , - •{ " -
) . ' '-MISCELLANEOUS DESITS •- • VALUES
. .. . ; TOTAL OF DEBITS I •
• - - . . - :-:a 4ET AMOUNT DUE -
2NLEL .. , tf
'PROVED . 1 11TITLE
. TITLE
*FOR DAY LABOR SECTIONS Sf4OW ESTIMATED QUANTITIES AND VALUES. .SLR E30:
-.. I , - - ..y. - I tX• -*' • Iii .. - .,,;