HomeMy WebLinkAbout90-0314 Country Brook North 90_orz,q
Cnrfrj bora
RESOLUTION
APPROVING PRELIMINARY PLAN FOR COUNTRY BROOK NORTH
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS,
that it hereby approves the preliminary plan prepared by U.S. Shelter Group, Inc. dated
November 24, 1989 and revised February 14, 1990 for Country Brook North.
s/ George VanDeVoorde
George VanDeVoorde, Mayor
Presented: March 14, 1990
Adopted: March 14 , 1990
Vote: Yeas 5 Nays 0
Recorded:
Attest:
s/ Marie Yearman
Marie Yearman, City Clerk
February 20 , 1990
MEMORANDUM
TO : Mayor and Members of the City Council
FROM : Land Use Committee , Planning & Land Use Commission
SUBJECT : Land Use Review
PURPOSE
Consideration of Application S2- 90 Requesting Preliminary Plat
Approval for a Residential Subdivision , Property Located on the
North Side of Bode Road , by the U. S . Shelter Group ,
Incorporated , as Applicant and Owner .
BACKGROUND
A petition has been filed by U. S . Shelter Group , Incorporated
requesting preliminary plat approval for a residential
subdivision . The subject property is located on the north side
of Bode Road .
The petitioner is proposing to develop the property with 63
single family lots ranging in lot size from 8 ,450 square feet to
20 , 565 square feet . It should be noted that since the Land Use
Committee considered Petition S2- 90 on January 15 , 1990 , school
site , park site and water system contributions have been amended
to the following :
School site contribution : $ 22 ,089 . 43
Park site contribution : 47 ,831 . 18
Water system contribution : 27 ,006 . 75
These revisions are the result of the ordinance recently adopted
by the City Council which amended the subdivision ordinance .
(See Land Use Review prepared by the Planning Department , dated
January 5 , 1990) .
UNRESOLVED ISSUES
None .
RECOMMENDATION
At its regular meeting of January 15 , 1990 , the Elgin Land Use
Committee recommended approval of Application S2- 90. subject to
the following conditions :
1 . Revisions to the Preliminary Plat and Preliminary Engineering
Plan per the Bureau of Inspection Services , Engineering
Division , Water Department and Planning Department .
2 . Substantial conformance with the revised preliminary plat and
preliminary engineering plan .
3 . Payment of a school cash contribution in the amount of
$ 15 ,426 . 92 . Payment due prior to final plat approval .
Payment may be made on a cost per acre basis for each unit if
the subdivision is developed in phases .
4 . Payment of a school impact fee prior to final plat approval .
The amount to be based on the number of elementary , junior
high and high school age children projected per the Table of
Estimated Ultimate Population per Dwelling Unit , published by
Associated Municipal Consultants , Inc . Payment may be made
on a cost per acre basis for each unit if the subdivision is
developed in phases .
5 . Payment of a park cash contribution in the amount of
$ 23 ,043 . 20 . Payment due prior to final plat approval .
6 . Payment of a water system contribution prior to final plat
approval . The amount to be based on a proportionate share of
capital costs associated with required improvements to the
water system . Payment may be made on a cost per acre basis
for each unit if the subdivision is developed in phases .
7 . Compliance with all other applicable codes and ordinances .
On a motion to recommend approval of Application S2- 90 , subject
to the conditions for approval , the vote was four (4) yes and
zero (0) no (see transcript ) .
RELATED COMMUNICATIONS
Letter to Chuck Littleton , U . S . Shelter , dated January 10 , 1990 .
- 2-
January 5 , 1990
LAND USE REVIEW
PLANNING DEPARTMENT
CITY OF ELGIN
I . SUBJECT
Consideration of Application S2- 90 Requesting Preliminary
Plat Approval for a Residential Subdivision , Property
Located on the North Side of Bode Road , by the U. S . Shelter
Group , Incorporated , as Applicant and Owner .
II . GENERAL INFORMATION
A . Requested Action preliminary Plat Approval
B . Present Zoning R- 2
C . Intended Use Residential
D . Property Location node Road at Poplar Creek Drive
E . Applicant/Owner U. S . Shelter Group . Incorporated
III . EXHIBITS
A . Location Map (see attached ) .
B . Zoning Map 1" = 600 ' (see attached ) .
C . Petitioner ' s Statement ( see attached ) .
D . Preliminary Plan prepared by ( see enclosed ) .
U . S . Shelter Group , Inc . dated
November 24 , 1989
IV. CONSIDERATIONS
A petition has been filed by U. S . Shelter Group ,
Incorporated requesting preliminary plat approval for a
residential subdivision . The subject property is located
on the north side of Bode Road (see Exhibits A and B) .
The petitioner is proposing to develop the property with 63
single family lots ranging in lot size from 8 ,450 square
feet to 20 , 565 square feet ( see Exhibits C and D) .
- Page 1 -
V. FINDINGS
A . Site Characteristics
The subject property contains approximately 20 . 65
acres . The property is unimproved .
B . Sewer and Water •�
The subject property is proposed to be serviced through
a 12" watermain located along Bode Road and a 16"
watermain located along Stonehurst Drive . The property
is proposed to be serviced through an 8 inch sanitary
sewer located along Stonehurst Drive . Stormwater is
proposed to be detained onsite and released at a
controlled rate into the storm sewer systems serving
Parkwood and Parkwood East subdivisions .
C . Traffic and Parking
Bode Road serves as a major east-west collector serving
the adjacent residential neighborhoods . Bode Road has
a design capacity of approximately 12 ,500 vehicles per
day , and has a traffic volume of 4 , 327 vehicles per
day.
The developer is proposing to construct 63 single
family units in the residential subdivision . The total
projected traffic impact dispersed along Bode Road and
Stonehurst Drive when completed would be 630 vehicle
per day ( 63 d . u . x 10) .
The required parking for residences is two spaces per
unit .
Sources : Engineering Division , City of Elgin .
Design Manual , State of Illinois , 1984 .
Trip Generation Manual , ITE , Third Edition .
E . M . C . 19 . 44 Off- street Parking .
D . Zoning History
The western portion of the subject property was annexed
into the City of Elgin in 1970 and the easterly portion
in 1978 . Both parcels were zoned R- 2 Single Family
Residence District upon annexation .
E . Zoning Status
The subject property is of adequate size to be
developed in accordance with the zoning and subdivision
regulations .
- Page 2-
F. Surrounding Land Use and Zoning -
The areas located to the north , east and west of the
subject property are zoned R- 2 Single Family Residence
District . These areas are zoned with single family
residences .
G . Trend of Development • �
The area in which the subject property is located is
developing with single family residences .
H . Comprehensive Plan
The Comprehensive Plan designates subject property as
community facilities and urban subdivision residential .
The proposed development complies with the
Comprehensive Plan in the urban residential
classification .
At the time the Comprehensive Plan .was adopted in 1983 ,
the subject property was to be developed with a school .
Accordingly , the property was designated "community
facilities" . The surrounding area is designated "urban
residential" .
VI . CONDITIONS FOR APPROVAL
1 . Revisions to the Preliminary Plat and Preliminary
Engineering Plan per the Bureau of Inspection Services ,
Engineering Division , Water Department and Planning
Department .
2 . Substantial conformance with the revised preliminary
plat and preliminary engineering plan .
3 . Payment of a school cash contribution in the amount of
$ 15 ,426 . 92 . Payment due prior to final plat approval .
Payment may be made on a cost per acre basis for each
unit if the subdivision is developed in phases .
4 . Payment of a school impact fee prior to final plat
approval . The amount to be based on the number of
elementary , junior high and high school age children
projected per the Table of Estimated Ultimate
Population per Dwelling Unit , published by Associated
Municipal Consultants , Inc . Payment may be made on a
cost per acre basis for each unit if the subdivision is
developed in phases .
S . Payment of a park cash contribution in the amount of
$ 23 ,043 . 20 . Payment due prior to final plat approval .
- Page 3-
Payment may be made on a cost per acre basis for each
unit if the subdivision is developed in phases .
6 . Payment of a water system contribution prior to final
plat approval . The amount to be based on a
proportionate share of capital costs associated with
required improvements to the water system . Payment may
be made on a cost per acre basis for each unit if the
subdivision is developed in phases .
7 . Compliance with all other applicable codes and
ordinances .
- Page 4-
LOCATION MAP
40
�
q r'yAP ® pI0
C Fs)' •, V U
Z WIY
a z T OL C Iy,� Y Y O
J
N. NN)** *
` J
v
6� I
C TIMBER
}
1
(41:411
I' CONGDON�'iNG1 SUMMIT
ti�Q1,44NoIMBALr SUBJECT PROPERTY
W
IMIP -
WI 55, 1 BODE .
20 l4.1\V
ilk .0."‘" W CHICAGO 0 CN/C400
r
`I
4441 411
1IIL U.S. 20
♦i ;Acc 0
01 BLUFF CITY
O U
=
a it
Z
T BOWESY1 O
_ is. 8 I
t
W Q
ill
.d
U $
HOPPS.,_
BARTLETT,
1
COOK CO.
Dlr PAGE CO.
•
PLANNING DEPARTMENT
CITY OF ELGIN EXHIBIT A
1334 N! 3.7V7S
8 LIHIHX3 t a 000t oos=
0001Z ooSI aaa ooc o
mason warp immure .0,
smimere II von.•ftworesso
ICY ewe seam w mm"omr
j'' f .craw Enmm wNIIM.. !'! s loam yr
as".almisi Ewra IN Emmq Ea-nu► fig Imam
41.4.1 41111.1""n"" is Emma guma•rmr sip am no",„,imam an
�`, Y...r._.� �arrs�,�! 1e ���" '�„ Ir n'm'�'�w�wrs'WWI !11
l IIIINIR
Ir."WI el SIM $111 HMO
„411; W ONINOZ
O �:=•i SIONI11N1013 40 Alts
Ile 4/41 , 4111 , Eti
V
1 10.I4Nit
,, 716, ! ,
. i.
,/ iii - t r (
.!.4.. / :10
`.� i
ale
ilii TAIL' Ow'� t
EH
•• ■
• Mr
_aft im-
r r�
Mg
�
•: •.. ■/i ■ !. ` rII—: 0:
-� 41111 111Miiiliiiiiiiiiiiiiiiigiiiiii:.i:iiiiiiiii:iiiiiE::_wa-singluip,♦.. ■
.iiiieili:.:EiiIiIiiiiiiiMi:: :::iiIiIi::il lit: .1*-4=Wipsimp 14F4P4A,':'w s . '
In alp a reipPX41 \II;7.-- ;sk
03l13DISNO3
$ UIflIhiiIuhvI
+►In,f
38 of Valli b :�.•., �•iat �..D 6 - g S • 1 d dtf .,- • .�►46, ,,rtitom. its .illee lai Ni.._.: 44 z�, A.,.■.•
ellaIrA
. Ationist01#
� a='/11)No Zair AIL ugir �Vt • �,'i,,,,,,'r**IN&Ab t-T.)��
.42A.:zoils 5757.77,10,„ *vow/ unsilop ,,,,,,ir
mw,erf ity• im--4:0).+-iiivi itimmuminow . tv-
• 11alliamr sir
at -1
me 1 01 1 Wilk "ijk44 4%p 6�n1♦//1-. ��- l i
010 �ii itr �8/1/� 1M� 3�
L!1<A Mid ►u" itiii- .i■nism livrgit I ,21
ira-! .rim : ..3 illsinsa■iiallaw�1,+■Bm .l
is . In
•
1 . * . Pm !
w I;
.
PETITIONER'S STATENIEI`NI'
EXHIBIT C
STATEMENT OF PURPOSE
Application is being made for the approval of the
subdivision of approximately 20 Acres of vacant land into 63
residential lots and a park/detention site. The property is
presently zoned R-2 and will be developed in compliance with
all the requirements of the R-2 zoning and the subdivision
regulations. All lots are substantially in excess of the
minimum R-2 requirements. No variations are being sought.
STATEMENT OF CONFORMANCE
The proposed subdivision, Country Brook North, conforms
with all aspects of the R-2 Zoning Regulations (Title 19)
and the Subdivision Regulations (Title 18) .
The extension of Sebring Drive to the west creates two
non-conforming lots in Parkwood Unit No. 5, Lots 454 and 456
will not have the required side yard of twenty-five (25' )
feet abutting a street.
The proposed subdivision is compatible with the
surrounding zoning and land uses and conforms to the
characteristics of the surrounding area.