RESOLUTION
ACCEPTING THE PROPOSAL OF ROBERT H. ANDERSON & ASSOCIATES, INC.
FOR THE MICHIGAN STREET REDEVELOPMENT AREA -
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS,
that James J. Cook, City Manager, be and is hereby authorized and directed to accept
the proposal on behalf of the City of Elgin of Robert H. Anderson & Associates, Inc. for
engineering services for the Michigan Street Redevelopment Area, a copy of which is
attached hereto and made a part hereof by reference.
George VanDeVoorde, Mayor
Presented: May 25, 1989
Adopted:
Vote: Yeas Nays
Recorded:
Attest:
Marie Yearman, City Clerk
(9)
cozia
gof
July 5, 1989
Mayor and City Council
City of Elgin
150 Dexter Court
Elgin, Illinois 60120
Re: Michigan Street Redevelopment Area
Dear Mayor and Aldermen:
In accordance with instructions in a letter from Mary Buchheid, Planner,dated May 17,
1989, we will proceed with professional engineer services in connection with MICHIGAN
STREET REDEVELOPMENT AREA (hereinafter called the "Project"),in conformance
with the Michigan Street Redevelopment Area RFP,prepared by the Elgin Planning
Department, and with our Letter of Proposal dated April 20, 1989. We would expect to
start our services within ten (10) days after receipt of written authorization from you.
You are expected to furnish us with full information as to your requirements including any
special or extraordinary considerations for the Project or special services needed, and also
to make available pertinent existing data.
Our services will consist of preparing a Preliminary Design, as set forth in the printed
General Provisions as amended and supplemented in Exhibit A thereto, both of which are
attached to this letter, and such additional services as you may request.
You will pay us for our services a lump sum fee of$17,345.
We will bill you monthly for services. Payment is to be made within thirty (30) days of
receipt of our invoice. These financial arrangements are based on the orderly and
continuous progress of the Project.
The schedule for the performance of our services are set forth in Exhibit A to the General
Provisions.
It is necessary that you advise us in writing at an early date if you have budgetary
limitations for the overall Project Cost or Construction Cost. We will endeavor to work
within those limitations. If you request we will submit to you periodically during the
design phase of our services our opinions as to the probability of completing construction
within your budget and where appropriate, request an adjustment in the budget or a
revision in the extent or quality of the Project. We do not guarantee that our opinions will
not differ materially from negotiated prices or bids. If you wish greater assurance as to
probable construction costs or if you wish formal estimates, an independent cost estimator
should be employed.
Services are to be rendered in the customary phases which, together with the general
understandings applicable to our relationship with you, are set forth in the General
Provisions and Exhibit A thereto which are attached to and made a part of this proposal.
Your responsibilities are also set forth in the General Provisions.
ROBERT H.ANDERSON &ASSOCIATES,INC.• 220 WEST RIVER DR.•ST. CHAR LES, IL 60174•708-584-3530• FAX 708-584-3047
Mayor and City Council
City of Elgin
Michigan Street Redevelopment Area
July 5, 1989
Page Two
This proposal, the General Provisions consisting of seven (7)pages, Exhibit A thereto
consisting of two(2)pages and Exhibit B represent the entire understanding between you
and us in respect of the Project and may only be modified in writing signed by both of us.
If it satisfactorily sets forth your understanding of the arrangement between us, we would
appreciate your sighing the enclosed copy of this letter in the space provided below and
returning it to us. This Proposal will be open for acceptance for thirty (30)days from the
date hereon unless changed by us in writing.
Thank you for requesting Robert H. Anderson &Associates to provide professional
services on this Project.
Very truly yours,
ROBERT H. ANDERSON & ASSOCIATES, INC.
Frank H. Gorham, P.
President
ACCEPTED THIS (al DAY OF , 1989
CITY OF ELGIN, KANE AND COOK COUN I'IES, ILLINOIS
BY 41
A!TEST: 1J1c5,-Q.�R ,.. ir.�jM ,��
CITY CLE
ROBERT H. ANDERSON &ASSOCIATES, INC. •220 WEST RIVER DR. •ST. CHARLES, IL 60174• 708-584-3530• FAX 708-584-3047
A (IA
(le
o
EXHIBIT A TO AGREEMENT
BETWEEN
CITY OF ELGIN, KANE AND COOK COUNTIES, ILLINOIS
AND
ROBERT H. ANDERSON & ASSOCIATES, INC.
DATE
, 1989
FURTHER DESCRIPTION OF BASIC ENGINEERING SERVICES AND RELATED
MA HERS:
1. This is an e..5hibit attached to, made part of and incorporated by reference into the Agreement
made on Oa/t( 12-- , 1989 between CITY OF ELGIN, ILLINOIS, (Owner) and
Robert H. Anderson &Associates, Inc., (Engineer) providing for professional engineering
services for the MICHIGAN STREET REDEVELOPMENT AREA, on a nine (9) acre site,
in Elgin,Illinois. The Basic Services of Engineer as described in Section 1 of the Agreement
are amended or supplemented as indicated below and the time periods for the performance of
certain services as indicated in Section 4 of the Agreement are stipulated as indicated below.
2. The Study and Report Phase has previously been completed by the City of Elgin and is not
included in this agreement.
3. During the Preliminary Design Phase, ENGINEER shall:
3.1 Make a field survey of the site to obtain topographic and planimetric information
on the site and prepare a topographic map of the site showing the location of
existing utilities and infrastructure and contours at two (2) foot intervals.
3.2 Make a boundary survey and prepare a plat of survey and a legal description of the
project area.
3.3 Based on the Conceptual Site Plan furnished by the OWNER, prepare a Preliminary
Plan showing the proposed layout for parking lots, streets, sanitary sewers, water
mains, storm sewers, typical cross sections and details and landscape improvements
in conformance with City of Elgin ordinances, standards and specifications.
3.4 Prepare an opinion of probable project costs, based on the Preliminary Plan.
ROBERT H.ANDERSON &ASSOCIATES, INC.• 220 WEST RIVER DR.•ST. CHARLES, IL 60174•708-584-3530• FAX 708-584-3047
3.5 Consider any associated costs for items other than those listed below as reimbursable
expenses:
Five sets of preliminary design documents and cost estimates for review.
Five sets of preliminary design documents and cost estimates incorporating review
comments.
Telephone and travel costs.
3.6 Procure and maintain professional liability insurance and shall furnish a "Certificate of
Insurance" to the OWNER.
The Preliminary Design Phase services will be completed and ENGINEER'S documentation
and opinions of cost submitted within ninety (90) calendar days following written
authorization from OWNER to Engineer to proceed with that phase of the services.
4. The Final Design Phase is not included.
5. The Construction Phase is not included.
IN WITNESS WHEREOF, the parties hereto have made and executed this Agreement as of
the day and year first above written.
OWNER: ENGINEER
CITY OF ELGIN, ILLINOIS ROB H. ANDERSON & ASSOCIATES, INC.
i' Bye __,,....4..i.-1 ,—
„..-.:.- ,
ATIhST: ca....3.-1-e__-q,ut,"‹....,
CITY CLERK
(SEAL)
ROBERT H. ANDERSON &ASSOCIATES, INC. •220 WEST RIVER DR.•ST. CHARLES, IL 60174• 708-584-3530• FAX 708-584-3047
1
GENERAL PROVISIONS The duties and responsibilities of ENGINEER
during the Preliminary Design Phase are
amended and supplemented as indicated in
paragraph 3 of Exhibit A "Further
Attached to and made a part of LETTER Description of Basic Engineering Services
AGREEMENT dated . . 1 9 8 9 and Related Matters".
between CITY OF ELGIN, ILLINOIS (Owner)
and ROBERT H.ANDERSON & ASSOCIATES, 1.4. Final Design Phase
INC., (Engineer)
THIS SECTION DELETED
in respect of the project "Michigan Street
Redevelopment Area," described herein. 1 .5. Bidding or Negotiating Phase.
SECTION 1 THIS SECTION DELETED
BASIC SERVICES OF ENGINEER
1 .6. Construction Phase
1.1 General
THIS SECTION DELETED
1.1.1. ENGINEER shall perform professional
engineering services in all phases of the 1.7. Operation Phase
Project to which this agreement applies as
hereinafter provided. These include THIS SECTION DELETED
customary civil engineering services.
SECTION 2
1.2 Study and Report Phase ADDITIONAL SERVICES OF ENGINEER
This Section Deleted 2.1 . Services Requiring Authorization in
Advance
1 .3 Preliminary Design Phase
If authorized in writing by OWNER,
After written authorization to proceed with ENGINEER shall furnish or obtain from
the Preliminary Design Phase, ENGINEER others Additional Services not included as
shall: part of Basic Services except to the
extent provided otherwise in Exhibit A
1 .3.1 . In consultation with OWNER and on "Further Description of Basic Engineering
the basis of the accepted Study and Report services and Related Matters"; these will be
Documents, determine the general scope, paid for by OWNER as indicated in Section 5.
extent and character of the Project.
SECTION 3 -
1 .3.2. Prepare preliminary design OWNER'S RESPONSIBILITIES
documents consisting of final design
criteria, preliminary drawings outline OWNER shall do the following in a timely
specifications and written descriptions of manner so as not to delay the services of
the Project. ENGINEER:
1 .3.3. Based on the information contained 3.1. Designate in writing a person to act
in the preliminary design documents, as OWNER's representative with respect to
submit a revised opinion of Project Cost. services under this Agreement. Such person
shall have complete authority to transmit
1 .3.4. Furnish five copies of the above instructions, receive information,
preliminary design documents and present interpret and define OWNER's policies and
and review them in person with OWNER. decisions with respect to ENGINEER's
services for the Project.
Page 1
2
3.2 Provide all criteria and full 3.5. Provide engineering surveys to
information as to OWNER's requirements establish reference points for construction
for the Project, including design objectives (except to the extent provided otherwise in
and constraints, space, capacity and Exhibit A "Further Descriptions of Basic
performance requirements, flexibility and Engineering Services and Related Matters),
expandability, and any budgetary to enable Contractor(s) to proceed with the
limitations; and furnish copies of all design layout of the work
and construction standards which OWNER
will require to be included in the Drawings 3.6. Arrange for access to and make all
and Specifications. provisions for ENGINEER to enter upon
public and private property as required for
3.3 Assist ENGINEER by placing at ENGINEER to perform services under this
ENGINEER's disposal all available Agreement.
information pertinent to the Project
including previous reports and any other 3.7. Examine all drawings, and other
data relative to design or construction of the documents presented by ENGINEER, obtain
Project. advice of an attorney, insurance counselor
and other consultants as OWNER deems
3.4. Furnish to ENGINEER, as required appropriate for such examination and
for performance of ENGINEER's Basic render in writing decisions pertaining
Services (except to the extent provided thereto within a reasonable time so as not to
otherwise in Exhibit A "Further delay the services of the ENGINEER.
Descriptions of Basic Engineering Services
and Related Matters), the following: 3.8. THIS PARAGRAPH DELETED
3.4.1 . data prepared by or services of 3.9. THIS PARAGRAPH DELETED
others, including without limitation
borings, probings and subsurface 3.10. THIS PARAGRAPH DELETED
explorations, hydrographic surveys,
laboratory tests and inspections of samples, 3.11 . THIS PARAGRAPH DELETED
materials and equipment;
3.12. THIS PARAGRAPH DELETED
3.4.2. appropriate professional
interpretations of all of the foregoing; 3.13. THIS PARAGRAPH DELETED
3.4.3. environmental assessment and 3.14. Give prompt written notice to
impact statements; ENGINEER whenever OWNER observes or
otherwise becomes aware of any
3.4.4. property, boundary, easement, development that affects the scope or timing
right-of-way, topographic and utility of ENGINEER's services.
surveys;
3.15. Furnish, or direct ENGINEER to
3.4.5. THIS PARAGRAPH DELETED provide, Additional Services as stipulated in
paragraph 2.1 of this Agreement or other
3.4.6. zoning, and other land use services as required.
restrictions; and
3.16. Bear all costs incident to compliance
3.4.7. with the requirements of this Section 3.
All of which ENGINEER may use and rely SECTION 4 - PERIODS OF SERVICE
upon in performing services under this
Agreement. 4.1. The ENGINEER acknowledges that the
timely performance of professional services
is an important element of ths Agreement.
Page 2
3
Accordingly, it is agreed that the ENGINEER SECTION 5 - PAYMENTS TO ENGINEER
will put forth is best professional effort to
complete the work in accordance with the 5.1 . Methods of Payment for
schedule attached as Appendix A. The Services and Expenses of ENGINEER
provisions of this Section 4 and the various
rates of Compensation for ENGINEER's 5.1.1 . For Basic Services. OWNER shall
services provided for elsewhere in this pay ENGINEER for Basic Services rendered
agreement have been agreed to in under Section 1 (as amended and
anticipation of the orderly and continuous supplemented by Exhibit A "Further
progress of the Project. Description of Basic Engineering Services
and Related Matters") as follows:
4.2. THIS PARAGRAPH DELETED
5.1.1.1. based on the terms set forth in the
4.3. THIS PARAGRAPH DELETED LETTER AGREEMENT.
4.4. THIS PARAGRAPH DELETED 5.1.1.2. THIS PARAGRAPH DELETED
4.5. ENGINEER's services under the 5.1.1.3. THIS PARAGRAPH DELETED
Preliminary Design Phase shall be
considered complete at the earlier of (1) 5.1.1.4. THIS PARAGRAPH DELETED
the date when the submissions for that phase
have been accepted by OWNER or (2) thirty 5.1.2. For Additional Services. OWNER
days after the date when such submissions shall pay ENGINEER for Additional Services
are delivered to OWNER for final acceptance. rendered under Section 2 as follows:
4.6. THIS PARAGRAPH DELETED 5.1.2.1. General. For Additional Services
of ENGINEER' principals and employees
4.7. THIS PARAGRAPH DELETED engaged directly on the Project and rendered
pursuant to paragraph 2.1 or 2.2 (except
4.8. THIS PARAGRAPH DEALETED services as a consultant or witness under
paragraph 2.1.13), on the basis of hourly
4.9. If OWNER has requested significant billing rates.
modifications or changes in the general
scope, extent or character of the Project, 5.1.2.2. Professional Associates and
the time of performance of ENGINEER'S Consultants. For services and Reimbursable
services shall be adjusted equitably. Expenses of independent professional
associates and consultants employed by
4.10. THIS PARAGRAPH DELETED ENGINEER to render Additional Services
pursuant to paragraph 2.1 or 2.2, the
4.11 . If ENGINEER's services are delayed amount billed to ENGINEER therefor times a
or suspended in whole or in part by OWNER factor of 1.05.
for more than three months for reasons
beyond ENGINEER's control, ENGINEER shall 5.1.2.3. Serving as a Witness. For
on written demand to owner (but without services rendered ENGINEER's principals
termination of this Agreement) be paid as and employees as consultants or witnesses
provided in paragraph 5.3.2. If such delay in any litigation, arbitration or other legal
or suspension extends for more than one or administrative proceeding in accordance
year for reasons beyond ENGINEER's with paragraph 2.1.13, at the rate of
control, the various rates of compensation $1000 per day or any portion thereof (but
provided for elsewhere in this Agreement compensation for time spent in preparing to
shall be subject to equitable adjustment. appear in any such litigation, arbitration or
proceeding will be on the basis provided in
4.12. THIS PARAGRAPH DELETED paragraph 5.1.2.1). Compensation for
ENGINEER' s independent professional
Page 3
•
4
associates and consultants will be on the and employees engaged directly on the
basis provided in paragraph 5.1.2.2. Project. In the event of any such
termination, ENGINEER also will be
5.1.3. For Reimbursable Expenses. In reimbursed for the charges of independent
addition to payments provided for in professional associates and consultants
paragraphs 5.1.1. and 5.1.2. OWNER shall employed by ENGINEER to render Basic
pay ENGINEER the actual costs of all Services, and paid for all unpaid Additional
Reimbursable Expenses incurred therefor Services and unpaid Reimbursable
times a factor of 1.15. Expenses, plus all termination expenses.
Termination expenses mean Reimbursable
5.1.4. The terms "Hourly Billing Rates" Expenses directly attributable to
and "Reimbursable Expenses" have the termination which, if termination is at
meanings assigned to them in paragraph 5.4. OWNER's convenience, shall include an
amount computed as a percentage of total
5.2 Times of Payments. compensation for Basic Services earned by
ENGINEER to the date of termination, as
5.2.1. ENGINEER shall submit monthly follows:
statements for Basic and Additional Services
rendered and for Reimbursable Expenses 20% if termination occurs after
incurred. The statements will be based upon commencement of the Preliminary Design
ENGINEER's estimate of the proportion of Phase.
the total services actually completed at the
time of billing. OWNER shall make prompt 5.3.4. Because of substantial costs incurred
monthly payments in response to by the ENGINEER to stop and restart a
ENGINEER's monthly statements. project once it is underway, OWNER agrees
to pay ENGINEER a project re-start fee of
5.3. Other Provisions Concerning $1,000.00 if the progress of the project is
Payments. halted at any time for a period of thirty
(30) days or more by OWNER, for any
5.3.1 If OWNER fails to make any payment reason, or by ENGINEER under paragraph
due ENGINEER for services and expenses 5.3.1 .
within thirty days after receipt of
ENGINEER's statement therefor, the amounts 5.3.5. Whenever a factor is applied to
due ENGINEER will be increased at the rate Salary Costs in determining compensation
of 1-1/2% per month from said thirtieth payable to ENGINEER that factor will be
day, and in addition, ENGINEER may, after adjusted periodically and equitably to
giving seven days' written notice to OWNER, reflect changes in the various elements that
suspend services under this Agreement until comprise such factor. All such adjustments
ENGINEER has been paid in full all amounts will be in accordance with generally
due for services, expenses and charges. accepted accounting practices as applied on a
consistent basis by ENGINEER and consistent
5.3.2. In the event of termination by with ENGINEER's overall compensation
OWNER under paragraph 7.1 upon the practices and procedures.
completion of any phase of the Basic
Services, progress payments due ENGINEER 5.4. Definitions.
for services rendered through such phase
shall constitute total payment for such 5.4.1. The Hourly Billing Rates used as a
services. In the event of such termination basis for payment means the rates shown on
by OWNER during any phase of the Basic Exhibit B "Schedule of Hourly Rates for
Services, ENGINEER will be paid for Employee Classifications, 1989".
services rendered during that phase on the
basis of ENGINEER's hourly billing rates_for 5.4.2. Reimbursable Expenses mean the
services rendered during that phase to date actual expenses incurred by ENGINEER or
of termination by ENGINEER's principals ENGINEER'S independent professional
Page 4
5
associates or consultants, directly or
indirectly in connection with the Project,
such as expenses for: reproduction of
reports, Drawings, and similar Project-
related items in addition to those required
under Section 1 ;
Page 5
, .
6
7.1. Termination
SECTION 6 - CONSTRUCTION COST
AND OPINIONS OF COST The obligation to provide further services
under this Agreement may be terminated by
either party upon thirty day's written
6.1 . CONSTRUCTION COST notice in the event of substantial failure of
the other party to perform in accordance
The construction cost of the entire Project with the terms hereof through no fault of
(herein referred to as "Construction Cost") the terminating party.
means the total cost to the OWNER of those
portions of the entire project designed and 7.2 Reuse of Documents
specified by ENGINEER, but it will not
include ENGINEER's compensation and All documents including Drawings and
expenses, the cost of land, rights-of-way, Specifications prepared or furnished by
or compensation for or damages to ENGINEER (and ENGINEER's independent
properties unless this Agreement so professional associates and consultants)
specifies, nor will it include OWNER's legal, pursuant to this Agreement are instruments
accounting, insurance counseling or auditing of service in respect of the Project and
services, or interest and financing charges ENGINEER shall retain ownership and
incurred in connection with the Project or property interest therein whether or not
the cost of other services to be provided by the Project is completed. OWNER may make
others to OWNER pursuant to paragraphs and retain copies for information and
3.7 through 3.11, inclusive. (Construction reference in connection with the use and
Cost is one of the items comprising Project occupancy of the Project by OWNER and
Costs which is defined in paragraph 1.2.5. others; however, such documents are not
intended or represented to be suitable for
6.2 Opinions of Cost reuse by OWNER or others on extensions of
the Project or on any other project. Any
6.2.1 . Since ENGINEER has no control over reuse without written verification or
the cost of labor, materials, equipment or adaptation by ENGINEER for the specific
services furnished by others, or over the purpose intended will be at OWNER's sole
Contractor(s) methods of determining risk and without liability or legal exposure
prices, or over competitive bidding or to ENGINEER or to ENGINEER's independent
market conditions. ENGINEER's opinions of professional associates and consultants from
probable Project Costs and Construction all claims, damages, losses and expenses
Cost provided for herein are to be made on including attorneys' fees arising out of or
the basis of ENGINEER's experience and resulting therefrom. Any such verification
qualifications and represent ENGINEER's or adaptation will entitle ENGINEER to
best judgment as an experienced and further compensation at rates to be agreed
qualified professional engineer, familiar upon by OWNER and ENGINEER.
with the construction industry; but
ENGINEER cannot and does not guarantee that 7.3 Insurance
proposals, bids or actual Project or
Construction Costs will not vary from 7.3.1 ENGINEER shall procure and
opinions of probable cost prepared by maintain insurance for protection from
ENGINEER. If prior to the Bidding or claims under worker's compensation acts,
Negotiating Phase OWNER wishes greater claims for damages because of bodily injury
assurance as to Project or Construction including personal injury, sickness or
Costs, OWNER shall employ an independent disease or death of any and all employees or
cost estimator as provided in paragraph 3.9. of any person other than such employees,
and from claims or damages because of
SECTION 7 injury to or destruction of property
GENERAL CONSIDERATION including loss of use resulting therefrom.
Page 6
7
7.4 Controlling Law construction phase of the project or
following its completion, each undersigned
This Agreement is to be governed by the law party will cooperate in good faith to explore
of the State of Illinois. and, if possible, arrive at an amicable
resolution of the problem without resort to
7.5 Successors and Assigns litigation or arbitration.
7.5.1 OWNER and ENGINEER each is hereby 7.6.2 In the event the parties are unable to
bound and the partners, successors, reach an agreement, a mediator, mutually
executors, administrators, and legal acceptable to all, will be utilized in further
representatives of OWNER and ENGINEER effort to resolve the dispute.
(and to the extent permitted by paragraph
7.5.2 the assigns of OWNER and ENGINEER) 7.6.3 It is further understood and agreed
are hereby bound to the other party to this that any such action taken or statement(s)
Agreement and to the partners, successors, made in an effort to resolve the problem
executors, administrators, and legal will be without prejudice to any legal right
representatives (and said assigns) of such or defense(s) that any party subsequently
other party, in respect of all covenants, may raise in the event that such voluntary
agreements, and obligations of this resolution attempts are unsuccessful.
Agreement.
7.7 LIMITATION OF LIABILITY
7.5.2 Neither OWNER nor ENGINEER shall
assign, sublet or transfer any rights under 7.7.1 The OWNER agrees to indemnify,
or interest in (including but without hold harmless, and defend the Engineer from
limitation, moneys that may become due or and against any and all claims, costs, suits,
moneys that are due) this Agreement and damages, including defense costs,
without the written consent of the other, arising out of errors, omissions, or
except to the extent that any assignment, inaccuracies in the documents and
subletting or transfer is mandated by law or information provided by the OWNER to the
the effect of this limitation may be ENGINEER.
restricted by law. Unless specifically stated
to the contrary in any written consent to an
assignment, no assignment will release or
discharge the assignor from any duty or
responsibility under this Agreement.
nothing contained in this paragraph shall
prevent ENGINEER from employing such
independent professional associates and
consultants as ENGINEER may deem
appropriate to assist in the performance of
services hereunder.
7.5.3 Nothing under this Agreement shall
be construed to give any rights or benefits
hereunder to anyone other than OWNER and
ENGINEER.
7.6 Agreement to Mediate
7.6.1 It is understood and agreed by the
undersigned parties that in the event of any
disagreement, dispute, controversy, project
delay, unanticipated extra expense, or
problem that may arise during the design or
Page 7
May 5, 1989
MEMORANDUM
TO: Mayor and Members of the City Council
FROM: City Manager
SUBJECT: Greater Downtown Elgin Commission - Review
of Michigan Street Redevelopment Project
PURPOSE: The purpose of this memo is to provide information on
comments made by the GDEC on the Michigan Street Redevelopment
Project.
BACKGROUND: At its May 4 , 1989 meeting, the Greater Downtown
Elgin Commission was given a presentation by staff from Planning
and Public Works of the conceptual plan for the Michigan Street
Redevelopment Project. As you might recall , the Council reached
a consensus on this plan at a Committee of the Whole meeting on
February 22 , 1989 and directed staff to obtain estimates of
costs for the improvements . The Commission supported the need
for redevelopment in that area and the need to pursue an engi-
neering study. However, the Commission noted that the conceptu-
al plan was larger in scope than was originally presented. In
addition, the Commission expressed concern over the inclusion of
homes along Villa Street for demolition. The Commission could
not recommend support for the conceptual plan presented but
proposed that the engineering study examine the areas which were
addressed by earlier versions of the conceptual plan.
RECOMMENDATION: No recommendation - for informational purposes
only.
,4/Ines J. 44,Ok, City Manager
JJC:amp
May 4 , 1989
MEMORANDUM
TO: Mayor and Members of the City Council
FROM: City Manager
SUBJECT: Michigan Street Development
PURPOSE: This memorandum will provide the Mayor and Council
with information to consider an award for preliminary engineer-
ing services associated with the subject development.
BACKGROUND: The City Council considered various options for the
development of the Michigan Street area at the Committee of the
Whole meeting on February 22 , 1989. The Council then directed
the staff to obtain estimates of cost for the improvements. The
Planning Department sent a Request For Proposals (RFP' s) to five
engineering firms and four responded.
FINANCIAL IMPACT: The four engineering firms that responded
with their respective fee for services are as follows:
Walker Parking Consultants $24 ,500. 00
Midwest Consulting Engineers 21 ,435 . 00
Hampton, Lenzini & Renwick, Inc. 18, 000. 00
Robert H. Anderson & Assoc. , Inc. 17, 345 . 00
There is in the Community Development Block Grant Program $7 ,500
for this project , plus $200 ,000 budgeted in the 1989 Capital
Improvement Program (385) .
RECOMMENDATION: The Greater Downtown Elgin Commission (GDEC) on
Thursday, May 4 , 1989 , discussed the project and the RFP' s which
were presented by staff and the Commission noted that the plan
presented was larger in scope than what they thought was neces-
sary and expressed a concern about including the properties on
Villa Street in the project. However, it is the recommendation
of the GDEC that the City Council award the work for preliminary
engineering services for the subject improvement to Robert H.
Anderson & Associates , Inc. in the amount of $17 , 345 .00 .
41, /
AO
res J. Co./, City Manager
JJC:amp