HomeMy WebLinkAbout86-9 Big Timber County Hwy. "
STATE OF ILLINOIS
COUNTY OF KANE
126- - 41:1
SUPERCEDING RESOLUTION NO.
PROVIDING FOR ADDING BIG TIMBER ROAD AS A COUNTY HIGHWAY EXTENSION
FROM ILLINOIS ROUTE 31 TO CONGDON AVENUE
WHEREAS, it has been determined that it is in the interest of Kane County,
State of Illinois to make a change in the County Highway Extension in said
County; and
. ,
WHEREAS, the authority to make such change is provided by Section 5-106
of the Illinois Highway Code, subject to the approval of the Illinois Depart-
ment of Transportation,
NOW, THEREFORE, BE IT RESOLVED, by the County Board of Kane County, State
of Illinois, that the following described location be added as County Highway
No. 21 Extension:
Beginning at the intersection of County Highway No. 21 (Big Timber Road)
with Illinois Route 31 (State Street) extending generally in an easterly
direction crossing the Fox River in the block lying between Belle Avenue
and Jerusha Road and continuing generally in an easterly direction to the
intersection of Congdon Avenue at Prospect Avenue and then continuing
easterly along Congdon Avenue to Dundee Road State Route 25 in the City
of Elgin.
BE IT FURTHER RESOLVED, that the County Clerk is hereby directed to transmit
two (2) certified copies of this resolution to the Department of Transportation
of the State of Illinois through its District Engineer, 1000 Plaza Drive, Schaum-
burg, Illinois, 60196.
PASSED by the Kane County Board on %tb.",...u..ch.r4.....‘ \A AIN '
ATTEST:
,p/-)‘
ciCounty Board [ha!rman, Joard
Kane County, Illinoi Kane County, Illinois
. .
STATE OF ILLINOIS
COUNTY OF KANE
RESOLUTION NO. 8.61~~ i4
AUTHORIZING AMENDED MEMORANDUM OF AGREEMENT WITH CITY OF ELGIN
FOR CONSTRUCTION OF BIG TIMBER ROAD-FOX RIVER BRIDGE
WHEREAS, the City of Elgin has heretofore requested the County of Kane to
enter into a joint agreement for the construction of Big Timber Road from
Illinois Route 31 easterly across the Fox River to Congdon Avenue at Prospect
BouleVard', and
WHEREAS, such improvements will facilitate the east-west traffic flow,
including an additional crossing of the Fox River, for the City of Elgin and
will be of immediate benefit to the residents of the County of Kane and
permanent in nature.
NOW, THEREFORE, BE IT RESOLVED by the County Board of the County of Kane
that the Chairman of the County Board be, and is hereby authorized and directed
to execute on behalf of the County of Kane the Memorandum of Agreement between
the City of Elgin and the County of Kane for the project herein stated.
PASSED by the Kane County Board On %u.,,AA,,,u,..1%.,\ kli 3 M(Y
'
ATTEST:
Crk,
County Board -- Chairman, County Bbard
,
~ - AMENDED MEMORANDUM OF AGREEMENT
BIG TIMBER ROAD - FOX RIVER BRIDGE
BETWEEN CITY OF ELGIN AND COUNTY OF KANE
This Amended Memorandum of Agreement made and entered into this --_
day of 100° A.D. , l9;. , by and between the City of Elgin, Kane County,
Illinois, hereinafter referred to as the "CITY" and Kane County, Illinois herein-
after referred to as the "COUNTY".
WITNESSETH
WHEREAS, the CITY, in order to facilitate the east-west traffic flow including
an additional crossing of the Fox River by extending Big Timber Road (County Highway
21 ) from the intersection with Illinois Route 31 easterly across the Fox River to
Congdon Avenue at Prospect Boulevard and thence easterly to Dundee Avenue following
the alignment prepared by H.W. Lochner, Inc. , dated March 14, 1985; and
WHEREAS, the CITY and COUNTY are desirous of causing said improvements to be
made in that same will be of immediate benefit to the residents of the CITY and
COUNTY and permanent in nature.
NOW, THEREFORE, in consideration of the mutual covenants contained herein,
the parties hereto agree as follows;
(1 ) The CITY agrees to cause the plans , specifications and estimates for such
construction to be prepared and shall submit same to the COUNTY and to the Depart-
ment of Transportation, Division of Highways, State of Illinois, for review and
approval .
(2) The CITY agrees to solicit and receive bids for construction of the
improvements following approval of the plans and specifications by the COUNTY and
the Department of Transportation and upon approval by the COUNTY and the STATE,
award the contract, furnish engineering inspection during construction, and cause
the improvement to be built in accordance with the plans , specifications, and con-
tract.
(3) The CITY and COUNTY agree to pass resolutions appropriating sufficient
funds from Motor Fuel Tax Funds or other local funds to pay their apportionate
share of the cost of this improvement and to provide certified copies thereof to
each other.
The COUNTY shall monthly issue warrants payable to the CITY, for amounts equal
to the payments requested on monthly payment estimates, supported by necessary
documentation, as submitted by the CITY to cover the COUNTY'S share of the cost
for construction and engineering services. Upon completion of the construction
and approval by the COUNTY and STATE, the COUNTY shall issue warrants payable to
the CITY for the balance of its share of the total project.
(4) It is mutually agreed that the cost of the improvement shall be borne
equally between the CITY and the COUNTY on a fifty-fifty /50-50\ basis for the
^ construction and engineering costs, and costs incidental thereto, but that the
^ " maximum amount to be borne by the COUNTY under this agreement shall not exceed
three (3.0) million dollars, including any prior payments made by the COUNTY for
this project in the approximate amount of ninety-four thousand dollars ($94,000'00) '
(5) The CITY agrees that all maintenance and any further improvements to this
segment of highway shall be the responsibility of the CITY, unless the parties
otherwise agree in writing.
(6) The CITY further agrees that as of the date of contract award for the
construction of the said Fox River Bridge, it will assume all maintenance respon-
sibility for Big Timber Road from Randall Road easterly to State Street (Illinois
Route 31 ) and thereby remove such responsibility from the COUNTY.
(7) The COUNTY agrees that should future construction, reconstruction or
widening of Big Timber Road from Randall Road to State Street (Illinois Route 31 )
become necessary, the COUNTY shall assume fifty percent /50%\ of the costs therefore
as a joint project with the CITY pursuant to the CITY-COUNTY Agreement dated March
29, 1983.
(8) This amended agreement and the covenants contained herein shall be null
and void in the event the contract covering the construction work contemplated
herein is not awarded by January 1 , 1988, except that this agreement shall be in
full force and effect with respect to any costs incurred in designing the improve-
ment described.
(9) This amended agreement shall be binding upon and inure to the benefits
Of the parties hereto, their successor, and assigns .
PASSED by the Kane County Board 0O \ 4 , 1986.
CITY N ELGIN
Bv -
Airy
Manager �N�
�� �r
, .tv of Elgin
ATTEST:
� H ^
City Clerk \l
City of Elgin
COUNTY OF KANE
=
By ea�~„
Chairn, County Board »"
Kane County, Illinois
ATTE3I4-
���
�
Clerk County— Board 80�rd
.
Kane County, Illinois