HomeMy WebLinkAbout85-0726 Otter Creek CO1 8s - oa-6 •A .I. ELGIN, ILLINOIS OTTER CREEK DETENTION AREA Change Order No. 1 SCOPE. This Change Order No. 1 shall cover the installation of 37. 5 Lineal Feet of 60 inch Diameter Class 111 Concrete Pipe, which is an extention of the existing 60 inch storm sewer under U. S. 20 to the Otter Creek Detention Facility. REASON FOR CHANGE. This section of the storm sewer, the extention of an existing 60 inch storm sewer to the detention facility was included in the original plans. The plans were sent to Illinois Department of Transportation (IDOT) , Division of Highways and Division of Water Re- sources (DOWR) for review several times. In one of the review processes, this item was left out inadvertently from schedule of prices. This omission was not detected in the in-house review. CHANGE IN THE CONTRACT AMOUNT Additional cost for 37.5 feet of 60 inch storm sewer installed complete $5,800.00 By reason of this Change Order No. 1 , the contract shall be increased in the amount of Five Thousand Eight Hundred and No/100 ($5,800.00) , the total contract cost with T & W Edmeir Corporation being Six Hundred Fifteen Thousand Eight Hundred Seventy Six and 88/100 Dollars ($615,876.88) . OTHER CONTRACT PROVISION. All other contract provision shall remain the same. Agreed to this ,24.4t" day ofal2La , 1985. Recommended Approved: ENGINEERING DIVISION CITY OF ELGIN Party of the First Part (Owner) AP By Date: June 1 , 19'limmidurnia5 By (4,00/4" Title VTLVL, Accepted: T & W EDMEIR CORP. ,.?,# EOED Party of the Second Part (Contractor) ` n V AUG 0 1 1985 Title President CITY OF ELGIN ENGINEERING 44, June 17, 1985 MEMORANDUM TO: Bob Malm, Acting City Manager FROM: Syed Ally, Civil Engineer II SUBJECT: Otter Creek Detention Area Attached is Change Order No. 1 for Otter Creek Detention Area. The construction of the facility cannot be completed without extending the existing storm sewer under U. S. 20. This item was shown in the original plans. The plans were sent several times to both Division of Highways and Division of Water Resources. A number of changes were made by both agencies each time the plans were reviewed. In one of these review processes this item was eliminated by some one. Unfortunately we did not detect that it was left out from the Summary of quantities and Schedule of prices. We request City Council approval for T & W Edmeir Corp' to proceed with the installation. //P ^0' Syed Ally SA: lr Attachment alb& f4 ~� 4 ELGIN, ILLINOIS OTTER CREEK DETENTION AREA Change Order No. 1 SCOPE. This Change Order No. 1 shall cover the installation of 37.5 Lineal Feet of 60 inch Diameter Class 111 Concrete Pipe, which is an extention of the existing 60 inch storm sewer under U. S. 20 to the Otter Creek Detention Facility. REASON FOR CHANGE. This section of the storm sewer, the extention of an existing 60 inch storm sewer to the detention facility was included in the original plans. The plans were sent to Illinois Department of Transportation (IDOT), Division of Highways and Division of Water Re- sources (DOWR) for review several times. In one of the review processes, this item was left out inadvertently from schedule of prices. This omission was not detected in the in-house review. CHANGE IN THE CONTRACT AMOUNT Additional cost for 37.5 feet of 60 inch storm sewer installed complete 55,800.00 By reason of this Change Order No. 1 , the contract shall be increased in the amount of Five Thousand Eight Hundred and No/100 ($5,800.00) , the total contract cost with T 6 W Edmeir Corporation being Six Hundred Fifteen Thousand Eight Hundred Seventy Six and 88/100 Dollars ($615,876.88). OTHER CONTRACT PROVISION. All other contract provision shall remain the same. Agreed to this day of , 1985. Recommended Approved: ENGINEERING DIVISION CITY OF ELGIN Party of the First Part (Owner) By Date: June 13, 1985 By Title Accepted: T & W EDMEIR CORP. Party of the Second Part (Contractor) By Title T&W EDMIER CORP. = _ .7_ P 249 West Lake Street Elmhurst, Illinois 60126 (312) 834-9555 lb lOr June 4, 1985 City of Elgin Department of Public Works Engineering Division 40 Ann Street Elgin, Illinois 60120 Attn: Mr. Syd Ally • RE: Otter Creek Detention Area 60" Diameter Concrete Pipe Gentlemen: Reference is madeto the above project and the job requirement which necessitates removal of the existing 60" Diameter Flared End Section and the addition of 37.5 Linial Feet of 60" Diameter Class III Concrete Pipe. • We will remove the 60" Diameter Flared End Section and provide and place the additional 60" Diameter Class III Concrete Pipe for the Lump Sum Add of Five Thousand, Eight Hundred Dollars ($5,800.00) to our base contract. Please advise of your acceptance. I remain Yours very truly, T & W EDMIER CORP. CX-..--0-to (.4...). fj.-).,....--- Thomas W. Edmier i TWE:mj Excavating and Site Development