HomeMy WebLinkAbout85-0528 Sanitary Sewer District Sanitary District of Elgin
Raymond Street & Purify Drive, Elgin, Illinois 60121-0092
Mail all correspondence to P. O. Box 92
Telephone 742-2068
February 7, 1986
Mrs. Marie Yearman, Clerk
City of Elgin
150 Dexter Ct.
Elgin, Illinois 60120
Re: West Dundee Interceptor
Dear Marie:
Enclosed, as requested, is a signed original of a May 28, 1985 sewer
easement grant for your records.
Sincerely,
SANITARY DISTRICTnOF ELGIN
�l
/'11
Gregg Hergenreoder
Engineer
GH:bh
enc.
TRUSTEES
Harold C. Westphal, Jr.
President
Edwin G. Haas
Vice President
Ernest R. Ludwig
Treasurer- Clerk
OFFICIALS
Albin D. Pagorski
General Manager
Gregory Hergenroeder
P.E. District Engineer
Lyle C. Brown
Attorney
I
O
EAS-EMENT GRANT
t�.
THIS GRANT OF EASEMENT, made this zS _ day
of �AC� , �� . from the CITY OF ELGIN, a municipal
corporation, 150 Dexter Court, Elgin, Illinois 60120, hereinafter
called the "Grantor", to the SANITARY DISTRICT OF ELGIN, a
municipal corporation organized and existing under the laws of the
State of Illinois, hereinafter called the "Sanitary District" (Grantee),
Raymond Street and Purify Drive, Elgin, Illinois 50120.
WHEREAS, the Sanitary District has constructed an
interceptor sewer, with appurtenances thereto in areas. which are
presently public right of way described on Exhibit "A", hereinafter
termed the West Dundee Interceptor Sewer, and hereinafter called the
"Interceptor": and
WHEREAS, it is necessary and desirable for the Sanitary
District to obtain a Perpetual Easement, right, privilege and authority
to reconstruct, repair, maintain and operate a certain part of the
Interceptor or lateral lines or sub-trunks connected to the Interceptor,
under and through certain premises hereinafter described: and
WHEREAS, the Sanitary District shall have the right at
all times hereafter to assign all or any part of the Permanent Easement
to the CITY OF ELGIN: and
WHEREAS, the Grantor is willing to grant said Perpetual
Easement, right, privilege and authority to the Sanitary District, or its
future assignee, upon the terms and conditions set forth.
-1-
NOW, THEREFORE, in consideration of the sum of One
Dollar ($1.00) in hand paid by the Sanitary District to Grantor, the
receipt of which is hereby acknowledged, and the covenants and conditions
hereinafter contained, the Grantor hereby bargains, sells, grants,
transfers and conveys to the Sanitary District, its successors and assigns,
the Perpetual Easement, right, permission and authority to reconstruct,
repair, replace, operate, and maintain the Interceptor or lateral lines
or sub-trunks connected to the Interceptor, under and through the
real estate described on Exhibit "A", (said Exhibit consists of O/425
part/). which are attached hereto and made a part hereof.
AND FURTHER IN CONSIDERATION of the grant of
the Perpetual Easement. right, privilege and authority herein contained,
this Easement Grant is subject to the following conditions:
FIRST: The Interceptor has been constructed by the open-
cut method and/or by the jacking and augering method under and through
the Permanent Easement, at the sole expense of the Sanitary District
either of reinforced concrete pipe or other materials that the District
Engineer of the Sanitary District deems advisable, and as approved by the
City of Elgin, and in accordance with the specifications, and plans
prepared by the District Engineer of the Sanitary District and approved
by the City of Elgin. Any lateral lines 'or sub-trunks which may be
connected to the Interceptor.-that may be constructed under and through
the Permanent Easement, shall not be at the expense of the Sanitary
District.
SECOND: The Sanitary District expressly assumes all
responsibility for, and shall save and keep harmless the Grantor, against
any loss, damage, cost or expense which it may suffer, incur or sustain.
-2-
or for which it might become liable growing out of any injury to or
death of persons, or loss. or damage to property, arising out of or
caused in the performance of any work done by or under the authority
of Sanitary District by virtue of the rights granted herein. In the event
of the bringing of any action, suit or suits, against Grantor growing out
of any such loss. damage. -cost or expense, Grantor shall give written
notice to the Sanitary District of the commencement of such action,
suit.. or suits, and therafter the Sanitary District shall
assume be defense thereof. The Sanitary District shall save and keep
harmless the Grantor from any claims for mechanics liens by reason of
any construction work, repairs, replacements or other work, or for any
improvements made or placed upon or to the Permanent Easement by
the Sanitary District. All provisions of this paragraph are applicable only
as to the work done under contract with and under the express provisions
and authority of the Sanitary District.
THIRD: The rights and obligations of the Grantor and the
Sanitary District hereunder shall inure to the benefit of and be binding
upon their respective successors and assigns, and all terms, conditions
-and covenants herein shall be constructed as covenants running with
the land.
FOURTH: After the Interceptor, lateral lines or sub-
trunks have been constructed and placed in operation:
(a) The Grantor may use the surface of said real
estate, it being understood, however, that such
use shall not in any manner interfere with or
damage the Interceptor, lateral lines or sub-
trunks. and that the Sanitary District shall have
the right of access to said real estate at all
times from the nearest highway or street for
the purpose of reconstruction, repair, maintenance
or operaiton of the Interceptor, lateral lines or
sub-trunks.
-3-
(b) The Grantor is guaranteed ingress and egress at
all times during and after construction so as not
to disrupt Water Department operations of Grantor.
CO The Grantor agrees that no buildings will be -
constructed over the Permanent Easement.
(d) The Grantor reserves the right to construct fences
or surface parking lot over the Permanent Easement.
(e) The Grantor reserves the right to connect lateral
`.: sewers to manholes installed within the Permanent
Easement, provided that all applicable ordinances
of the Sanitary District are complied with in making
any such connection.
(f) The Grantor agrees to give the Grantee a construction
easement, as shown on the working (construction)
drawings and plans for the project.
(g) The Sanitary District shall at Sanitary District's
expense, maintain said sanitary sewer in good repair.
Should repair of the Interceptor be required, Sanitary
District agrees to replace all landscape material
-with equal material and restore easement area to
original condition. Access to easement and repair
area shall also be restored to original-condition.
Repair activities which interfere with normal Water
Department operations of_ Grantor shall be completed
continuously until normal operations are restored.
FIFTH: All landscape material and sodding shall be replaced .
and guranteed for one year and Grantee shall cause sodding and landscape
material to be watered through the guarantee period of one year.
SIXTH: Appropriate and adequate dust control measures shall
be employed during construction.
SEVENTH: Should construction activities in any way interfere
with normal Water Department operations of Grantor, the Grantee
guarantees that the contractor shall work continuously until normal operations
are restored.
-4-
EIGHTH: If access is through City property for construction
of the Interceptor—said areas, including but not limited to pavement.
curb and gutter, plantings, sod drainage ditches, culverts and existing
underground utilities shall be repaired and restored at no expense to the
City of Elgin.
NINTH: Grantee agrees that there shall be no random
filling in the flood plain with trees, stumps or other materials of any kind.
TENTH: Prior to commencement of reconstruction or
repair the Grantee shall provide to Grantor the contractor's proposed
construction method within the easement areas. The Grantor must approve
all construction methods prior to commencement of construction.
ELEVENTH: The City of Elgin shall be notified 48 hours
in advance of the start of any construction.
IN WITNESS WHEREOF, the Grantor has caused this
instrument consisting of 5 pages, including the Exhibit "A" and this page
to be executed by the Grantor.
CITY OF ELGIN SANITARY DISTRICT OF ELGIN
By.
City M ager Its President
ATTEST: ATTEST:
1
Its Clerk Its Clerk
=5-
Z .
NORTH INTERCEPTOR SEWER
EASEMENT DESCRIPTIONS IN
CITY OF ELGIN RIGHT OF WAY
Mable Street That part of the west k of the northeast k of Section
II Township 41 N, Range BE of the 3rd P.M. described as follows:
The 66 foot wide right of way north from the north right of way of
Owasco Avenue to the north right of way line of Jerusha Avenue extended
in Sadlers Addition.
Jerusha Street That part of the northwest k of the northeast k of
Section II Township 41- N. Range BE of the 3rd P.M. described as follows:
The 65 foot wide right of way east from the east right of way of Mable
Street to a line 40 feet east of and parallel to the east right of way line
of Tinker Street extended in Sadlers Addition.
West River Road That part of the northeast k of the southeast k
of Section 2. Township 41 N. Range BE of the 3rd P.M. described as
follows: The 100 foot wide right of way extending west.600 feet and
extending east 150 feet from the east line of said Section 2.
South Airport Road That part of the northwest k of Section 1 and the
northeast k of Section 2 in Township 41 N. Range BE of the 3rd P.M.
and that part of the southeast k of Section B, Township 42 N,Range BE
of the 3rd P.M. described as follows: The west 400 feet of the 100 foot
wide right of way from the east right of way line of Highpoint Road
extended southerly in the Elgin O'Hare Business Center.
EXHIBIT 'A'