HomeMy WebLinkAbout84-1217 Alliance • ELGIN, ILLINOIS NATIONAL STREET STREETSCAPE PHASE I CHANGE ORDER NO. 1 SCOPE. This Change Order No.1 covers an addition to the above contract with Alliance Contractors, Inc. , 1166 Lake Avenue, Woodstock, IL 60098 as follows: Item 1 . Supply six (6) each Street Lights manufactured by Sterner Lighting, Inc. , Wensted, Minnesota. The drawing number is 3PD16236-BO1 . No labor for installation is included. REASONS FOR CHANGE Item 1 . The contract for $76,450.80 was awarded to Alliance Contractors, Inc. for construction of sidewalk for major portion of the north side and small section on the south side as well as ten (10) Tree Grates (material only, no labor) to be used for Phase II of the project. This included Base Bid and Alternates 2 & 3. Alternate 1 , supplying six (6) street lights (material only, no labor) for $15,510.00 was not awarded due to limitations of the Jobs Bill funds. The requirement is for the contractor to guarantee a minimum of $35,000.00 worth of work subcontracted to a minority contractor. Without Alternate 1 , supply- ing the lights, Alliance Contractors, Inc. is unable to meet this requirement. We have been advised by the Community Development Department that by rearranging priorities, an add- itional $15,510.00 may be made available for this project. SUMMARY OF CHANGES IN CONTRACT AMOUNT. The amount of the contract shall be revised as follows: ADD Item 1 . Supplying six Street Lights (Material only, no labor) $15,510.00 By reason of this Change Order No.1 , the contract cost shall be increased in the amount of Fifteen Thousand Five Hundred and Ten Dollars ($15,510.00). ••• -P OTHER CONTRACT PROVISIONS. All other provisions of the contract shall remain the same. Agreed to this 1 -14 `day of---J2).4212.42y0AD4E.v— , 1984 Recommended: Approved: ENGINEERING DIVISION CITY OF ELGIN Par the First By Part (Ow er Date: December 11 , 198A / OW' • By Title Acting City Manager Accepted: ALLIANCE CONTRACTORS, INC. Party f the Seconliir Contractor) trj By Title 642 C.O.-2 CITY OF ELGIN ENGINEERING DIVISION 150 DEXTER COURT-ELGIN,ILLINOIS 60120-5555 Telephone: (312) 693-6300 Ext. 243 TRANSMITTAL LETTER Date December 28, 1984 To: Marie Yearman City Clerk Job: National Street Streetscape Phase I, Change Order No. 1 We transmit herewith for your—Information Approval Files X Correction Return Copy of 1 (2(664V4f Change Order No. 1 Sheet Nos. 1 & 2 Remarks This is your final copy of Change Order No. 1. CC: Mike Sarro w/Original Yours very truly, Ralph Ridley, Civil Engineer I By December 11, 1984 MEMORANDUM TO: Bob Maim, Acting City Manager FROM: Planning Department RE: National Street Improvements As part of the Housing and Community Development Block Grant Program the City of Elgin is required to establish an annual Minority Business Enterprise (MBE) goal. The MBE goal for 1984 is $35,000. In order to meet this goal a "minority set aside" was established for the National Street improvements. In selecting the lower cost alternative for the National Street improvements the work eliminated was $15,510. of minority work. After discussions with H.U.D. it was determined that contingency funds from the 1983 HCD budget could be used to support an HCD Jobs Bill project. Therefore, if a change order is approved to provide for the full scope of National Street improvements the City will be able to achieve $35,000. in MBE contract awards. Awarded Project Cost = $76,450.80 Engineering and Inspection Costs = 7,500.00 Proposed Change Order = 15,510.00 Total Project Cost = $99,410.80 fru R7 r7 1: i • F L.. L Ld OFLGii; ENGINEERING PAA/sl Change Order No. 1 attached Copies to: Marie Yearman Mike Sarro Erwin Jentsch Mel Dahl Gary Miller . • ELGIN, ILLINOIS NATIONAL STREET STREETSCAPE PHASE I CHANGE ORDER NO. 1 SCOPE. This Change Order No.1 covers an addition to the above contract with Alliance Contractors, Inc. , 1166 Lake Avenue, Woodstock, IL 60098 as follows: Item 1 . Supply six (6) each Street Lights manufactured by Sterner Lighting, Inc. , Wensted, Minnesota. The drawing number is 3PD16236-BO1 . No labor for installation is included. REASONS FOR CHANGE Item 1 . The contract for $76,450.80 was awarded to Alliance Contractors, Inc. for construction of sidewalk for major portion of the north side and small section on the south side as well as ten (10) Tree Grates (material only, no labor) to be used for Phase II of the project. This included Base Bid and Alternates 2 & 3. Alternate 1 , supplying six (6) street lights (material only, no labor) for $15,510.00 was not awarded due to limitations of the Jobs Bill funds. The requirement is for the contractor to guarantee a minimum of $35,000.00 worth of work subcontracted to a minority contractor. Without Alternate 1 , supply- ing the lights, Alliance Contractors, Inc. is unable to meet this requirement. We have been advised by the Community Development Department that by rearranging priorities, an add- itional $15,510.00 may be made available for this project. SUMMARY OF CHANGES IN CONTRACT AMOUNT. The amount of the contract shall be revised as follows: ADD Item 1 . Supplying six Street Lights (Material only, no labor) $15,510.00 By reason of this Change Order No.1 , the contract cost shall be increased in the amount of Fifteen Thousand Five Hundred and Ten Dollars ($15,510.00) . OTHER CONTRACT PROVISIONS. All other provisions of the contract shall remain the same. Agreed to this day of , 1984 Recommended: Approved: ENGINEERING DIVISION CITY OF ELGIN Party of the First By Part (Owner) Date: December 11 , 1984 By Title Acting City Manager Accepted: ALLIANCE CONTRACTORS, INC. Party of the Second Part (Contractor) By Title C.O.-2