84-1008 Irving Construction
't - Ipo55 •Irvi vka RESOLUTION APPROVING CHANGE ORDER NO. 2 IN THE CONTRACT WITH IRVING CONSTRUCTION COMPANY, INC. FOR THE HEADQUARTERS FIRE STATION PROJECT WHEREAS, the City of Elgin has heretofore entered into a contract with Irving Construction Company, Inc. for the Headquarters Fire Station Project; and WHEREAS, it is necessary and desirable to modify the terms of the contract as is described in Change Order No. 2, attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that Robert O. Maim, Acting City Manager, be and is hereby authorized and directed to execute Change Order No. 2, a copy of which is attached hereto and made a part hereof by reference. Richard L. Verbic, Mayor Presented: October 8, 1984 Adopted: Vote: Yeas Nays Recorded: Attest: Marie Yearman, City Clerk �f l 0,i i 1 CHANGE A CHITECT 0 ORDER CONTRACTOR . FIELD 0 AIA DOCUMENT G701 OTHER PROJECT: Elgin Headquarters Fire Station CHANGE ORDER NUMBER: TWO (name, address) Summit Street at Hill Street TO (Contractor) _ Frying Construction Co. , Inc. ARCHITECT'S PROJECT NO: 8304 13 Jennifer Lane CONTRACT FOR: General Contractor DeKalb, Illinois 60115 L J CONTRACT DATE: December 28, 1983 You are directed to make the following changes in this Contract: 1. Eliminate telephone system (-$10, 150. 00). 2. Install floor drain in kitchen area per request of Chief G. VanDeVoorde bring drain flush with underside of floor. +$80. 00 3. Eliminate the mastic application of roof insulation in hot steep asphalt. Insulation to.be mechanically fastened only. (-$975. 00). The original Contract Sum was $ 925, 501. 00 . Net change by previous Change Orders $ 27, 485. 00 • The Contract Sum prior to this Change Order-was • $ 952, 986. 00 • The Contract Sum will be ttrirreased) (decreased) (tine hanged) by this Change Order . . $ 11, 045. 00 The new Contract Sum including this Change Order will be $ 941, 941. 00 . The Contract Time will be firm-reused) (decreased) (unchanged) by ( 0 ) Dads. The Date of Completion as of the date of this Change Order therefore is unchanged. • John-A. Wabich Irving Construction Co Inca City of Elgin ARCI IJ �T�inPr11a Drive East CONTRACTOR O J nnjfPr 1 .ane °"1'6 Dexter Court Address Address Address nove/Park Illi ois 60103 DeKalb, Illinois 60115 Elgin, Illinois 60120 J BY kill BY BY ti E July 27, 1984 DATE DATE • AIA DOCUMENT G701 • CHANGE ORDER • APRIL 1970 EDITION • AIA© • O 1970 • THE lrzull 1ty.•_ .•AC: AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., NW, WASHINGTON, D.C. 20006 r CHANGE • OWNER ❑ • ARCHITECT 0 ORDER CONTRACTOR . FIELD 0 AIA DOCUMENT G701 OTHER PROJECT: Elgin Headquarters Fire Station CHANGE ORDER NUMBER: TWO (name, address) summit Street at Hill Street TO (Contractor) _ l Irving Construction Co. , Inc. ARCHITECT'S PROJECT NO: 8304 13 Jennifer Lane CONTRACT FOR: General Contractor DeKalb, Illinois 60115 L .1 CONTRACT DATE: December 28, 1983 You are directed to make the following changes in this Contract: 1. Eliminate telephone system (-$10, 150. 00). 2. Install floor drain in kitchen area per request of Chief G. VanDeVoorde bring drain flush with underside of floor. +$80.00 3. Eliminate the mastic application of roof insulation in hot steep asphalt. Insulation to.be mechanically fastened only. (-$975. 00). The original Contract Sum was $ 925, 501. 00 . Net change by previous Change Orders $ 27, 485. 00 • The Contract Sum prior to this Change Order was $ 952, 986. 00 The Contract Sum will be (int1Cased) (decreased) (nrrctlarrged) by this Change Order . . $ 11, 045. 00 The new Contract Sum including this Change Order will be $ 941, 941. 00 The Contract Time will be tir eased) (decreeseef) (unchanged) by ( 0 ) Days. The Date of Completion as of the date of this Change Order therefore is unchanged. • John-A.h Wabich Irving Construction Co.Inr�. City of Elgin ARc 21 �TC�i nPma Drive East CONTRACTOR 1 Jennifer I .ane o"l u Dexter Court Addressl Address Address nove ,Park Illi of s 60103 DeKalb, Illinois 60115 Elgin, Illinois 60120 J BY% BY BY / (5.71E July 27, 1984 DATE DATE AIA DOCUMENT G701 • CHANGE ORDER • APRIL 1970 EDITION • AIA® • 0 1970 • THE QUA /6'. 'NC:AMERICAN INSTITUTE Or ARCHITECTS, 1735 NEW YORK AVE., NW, WASHINGTON, D.C. 20006 - • • CHANGE O ARCHITECT 0 ORDER CONTRACTOR El . . FIELD 0 AIA DOCUMENT G701 OTHER. PROJECT: Elgin Headquarters Fire Station CHANGE ORDER NUMBER: TWO (name, address) Summit Street at Hill Street TO (Contractor) FTrving Construction Co. , Inc. ARCHITECT'S PROJECT NO: 8304 13 Jennifer Lane CONTRACT FOR: General Contractor DeKalb, Illinois 60115 L 1 CONTRACT DATE: December 28, 1983 You are directed to make the following changes in this Contract: 1. Eliminate telephone system (-$10, 150. 00). 2. Install floor drain in kitchen area per request of Chief G. VanDeVoorde bring drain flush with underside of floor. +$80,00 3. Eliminate the mastic application of roof insulation in hot steep asphalt. Insulation to,be mechanically fastened only. (-$975. 00). The original Contract Sum was $ 925, 501. 00 . Net_change by previous Change Orders S 27, 485. 00 The Contract Sum prior to this Change Order was $ 952, 986. 00 The Contract Sum will be ttintreesed) (decreased) (artch rrged) by this Change Order . . $ 11, 045. 00 . The new Contract Sum including this Change Order will be $ 941, 941. 00 The Contract Time will be (increased) (decreased) (unchanged) by ( 0 ) Days. The Date of Completion as of the date of this Change Order therefore is unchanged. • John A. Wabich Irvin Construction Co, Inc. City of Elgin ARC ICT_Cinema Dri e East CONTRACTOR OW - I De er Court 1113 Jennifer T ,anP Address Address Address Hove /Park; Illi of s 60103 DeKalb, Illinois 60115 r 'gin Illi sl s 120 BY BY BY �r i ---.. D E . July 27, 1984 DATE DATE /o //SAY AIA DOCUMENT G701 • CHANGE ORDER • APRIL 1970 EDITION • AIAO • © 1970 • THE Quint , � i'AC: AMIERICAN INSTITUTE OF-ARCHITECTS, 1735 NEW YORK AVE., NW, WASHINGTON, D.C. 20006 (�