Loading...
HomeMy WebLinkAbout84-0515 Ryerson Park Improvements 6 1A-OSIS CITY OF ELGIN ENGINEERING DIVISION 150 DEXTER COURT-ELGIN,ILLINOIS 60120-5555 Telephone: (312) 695- 6500 Ext. 245 TRANSMITTAL LETTER Date June 8 1984 To: Marie Yearman City Clerk Job: Ryerson Park Improvements We transmit herewith for your—Information Approval Files X Correction Return Co of One (1) 4Original Change Order No.2 & Final for the above referenced project. Sheet Nos. CO-I & r0-2 Remarks CC: Mike Sarro, w/original Yours very truly, IL Hydraulic, w/2 originals Ra Ridley,- '-vii 1 Engineer I y � A ^ * ELGIN, ILLINOIS RYERSON PARK IMPROVEMENTS CHANGER ORDER NO. 2 & FINAL SCOPE. This Change Order No. 2 & Final covers the following additions to certain contract quantities: Item 1 . Spirea b. Froebeli (Spirea) 1 Each Item 2. Sodding 245 Square Yards Item 3. #8 Stranded Copper U.S.E. 560 Lineal Feet (Single Conductor) Item 4. Chain Link Fence, 48" High 95 Lineal Feet REASON FOR CHANGE Item 1 . It was necessary to add 1 more Spirea to fill in the landscaping along the new fence. Item 2. Because of the heavy use of the new play equipment the existing paths were also sodded to give the grass a chance at survival that would not be possible with seed. Item 3. The original plan called for a two (2) wire system to serve the new light fixtures. When Commonwealth Edison installed the new service connection they requested that we install a three (3) wire system to be compatable with there new connection. Item 4. An incorrect quantity was specified for the chain link fence. The contract quantity was 105 Lineal Feet. The actual quantity necessary in the field was 200 lineal feet. SUMMARY OF CHANGES IN CONTRACT AMOUNT. The contract shall be revised on the following basis: Item 1 . Spirea b. Froebeli (Spirea) 1 Ea. @ $19'00 $ 19'80 Item 2. Sodding 245 S.Y. @ @3.60 882. 00 Item 3. #8 Stranded Copper U.S.E. (Single Conductor) 560 L.F. @ $1 ,90 1 ,064,00 Item 4. Chain Link Fence, 48" High 95 L.F. @ $8,60 817,00 Total Addition to the Contract Amount $2,782'00 CO-] , By reason of this Change Order No. 2 & Final , the contract cost shall be increased in the amount of Two Thousand Seven Hundred Eighty Two Dollars (2,782.00) . OTHER CONTRACT PROVISIONS. All other provisions of the contract shall remain the same. Agreed to this /64 day of /(-7 , 1984 Recommended: Approved: ENGINEERING DIVISION CITY OF ELGIN By Party • therFi s rt (Iwner) Date: Ma 2, 1984 r., By A _ Title W Accepted: Illinois Hydraulic Construction C•'•=.ny Party of the Seco • P. (Contr. • ) Title 45 cr 7K S CO-2