HomeMy WebLinkAbout83-1010 Ryerson Park Improvements a RESOLUTION APPROVING CHANGE ORDER NO. 1 IN THE CONTRACT WITH ILLINOIS HYDRAULIC CONSTRUCTION COMPANY FOR RYERSON PARK IMPROVEMENTS WHEREAS, the City of Elgin has heretofore entered into a contract with Illinois Hydraulic Construction Company for Ryerson Park improve- ments; and WHEREAS, it is necessary and desirable to modify the terms of the contract as is described in Change Order Number 1, attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that Leo Nelson, City Manager, be and is hereby author- ized and directed to execute Change Order Number 1, a copy of which is attached hereto and made a part hereof by reference. Richard L. Verbic, Mayor Presented: October 10, 1983 Adopted: Vote: Yeas Nays Recorded: Attest: Marie Yearman, City Clerk ELGIN, ILLINOIS RYERSON PARK IMPROVEMENTS CHANGE ORDER NO.1 SCOPE. This Change Order No.1 covers additions and modifications to the above contract as follows: Item 1 . The contractor shall install a photo electric cell on an existing light pole to activate the new lighting fixtures. Item 2. The contractor shall provide 56 each Euonymous Alata Compacta four (4) feet high to be planted on two (2) foot centers between the proposed fence and the existing stdewalk. REASON FOR CHANGE Item 1. The original lighting fixtures were on timers and a meter. Commonwealth Edison now has a Rate 25 contract with the City that covers the use of a photo electric cell that will turn the lights on at dusk and off at dawn. Item 2. Public Property and Recreation has requested that an add- itional row of hedges be added to the new proposed fence. This extra hedge will act as a screen and help to improve a major approach to the city (Route 31 from the South). SUMMARY OF CHANGES IN CONTRACT AMOUNT. The contract amount shall be revised on the following basis: Item 1 . Additional cost to install $ 64.35 photo electric cell Item 2. Additional cost to install 56 2,956.00 each Euonymous Alata Compacta four (4) feet high to be planted on two (2) foot centers between the proposed fence and the exist- ing sidewalk Total Addition to the Contract Amount $3,020.35 By reason of this Change Order No.1 , the contract cost shall be increased in the amount of Three Thousand Twenty and 35/100 Dollars ($3,020.35). OTHER CONTRACT PROVISIONS. All other provisions of the contract shall remain the same. 1 ' Agreed to this -2-441-day of e96 .4-4e../v , 1983. Recommended: Approved: ENGINEERING DIVISION CITY OF ELGIN 1 BY . - OF_ JAVe Lai Part, of he ' st 'art (Owner) Date: 'eptem,er 30, 1 83 By /...t) Title J ill ....",k ' Accepted: ILLINOIS HYDRAULIC CONSTRUCTION COMPANY Party of the Second Part (Contractor) By Title 4,-,:, 1„,-, September 30, 1983 MEMORANDUM TO: Leo Nelson, City Manager FROM: Ralph Ridley, Civil Engineer I RE: Ryerson Park Improvements Change Order No. 1 Change Order No. 1 covers the addition of a photo electric cell to the lighting system and additional planting material for the Ryerson Park Improvements. The original service for the park lighting was by a meter and timer mounted on a utility pole. To provide a constant service between dusk and dawn, the addition of the photo electric cell will be added to the contract. The lighting will then be paid for under a Rate 25 Contract with Commonwealth Edison. Public Property and Recreation has requested that an additional row of hedges be added to the contract. This hedge will act as a screen and help to improve a major approach to the City (Route 31 from the south) . The original engineer's estimate to construct this project was $44,985.00. The contract cost is $35,782.00 which was awarded to Illinois Hydraulic Construction on July 11, 1983. The two items above will add $3,020.35 (Photo Electric Cell $64.35, and 56 Evonymous Alata Compactor $2,956.00) . We would therefore request that the City Council approve Change Order No. 1 to the Tyerson Park Improvements (copy attached) . RLR:lr Attachment cc: Mel Dahl Gary Miller Marie Yearman Dan Blondin Mike Sarro ELGIN, ILLINOIS RYERSON PARK IMPROVEMENTS CHANGE ORDER NO.1 SCOPE. This Change Order No. 1 covers additions and modifications to the above contract as follows: Item 1 . The contractor shall install a photo electric cell on an existing light pole to activate the new lighting fixtures. Item 2. The contractor shall provide 56 each Euonymous Alata Compacta four (4) feet high to be planted on two (2) foot centers between the proposed fence and the existing SIdewalk. REASON FOR CHANGE Item 1 . The original lighting fixtures were on timers and a meter. Comonwealth Edison now has a Rate 25 contract with the City that covers the use of a photo electric cell that will turn the lights on at dusk and off at dawn. Item 2. Public Property and Recreation has requested that an add- itional row of hedges be added to the new proposed fence. This extra hedge will act as a screen and help to improve a major approach to the city (Route 31 from the South). SUMMARY OF CHANGES IN CONTRACT AMOUNT. The contract amount shall be revised on the following basis: • Item 1 . Additional cost to install $ 64. 35 photo electric cell Item 2. Additional cost to install 56 2,956.00 each Euonymous Alata Compacta four (4) feet high to be planted on two (2) foot centers between the proposed fence and the exist- ing sidewalk Total Addition to the Contract Amount $3,020.35 By reason of this Change Order No.1 , the contract cost shall be increased in the amount of Three Thousand Twenty and 35/100 Dollars ($3,020. 35) . OTHER CONTRACT PROVISIONS. All other provisions of the contract shall remain the same. _ _ Agreed to this day of , 1983. Recommended: Approved: ENGINEERING DIVISION,. CITY OF ELGIN .�--� F Party of the First Part (Owner) By Date: 9eptem er 30, 1 83 By Title Accepted: ILLINOIS HYDRAULIC CONSTRUCTION COMPANY Party of the Second Part (Contractor) By Title