HomeMy WebLinkAbout83-1010 EM Melahn '~ 4t3— P310
RESOLUTION
APPROVING CHANGE ORDER NO. 1 IN THE CONTRACT WITH
E.M. MELAHN CONSTRUCTION CO. FOR THE ALFRED/DFMIOND STREET IMPROVEMENTS
WHEREAS, the City of Elgin has heretofore entered into a contract
with E.M. Melahn for the Alfred/Demmond Street improvements; and
WHEREAS, it is necessary and desirable to modify the terms of the
contract as is described in Change Order Number 1, attached hereto.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
ELGIN, ILLINOIS, that Leo Nelson, City Manager, be and is hereby author-
ized and directed to execute Change Order Number 1, a copy of which is
attached hereto and made a part hereof by reference.
kichard L. Verbic, Mayor
Presented: October 10, 1983
Adopted:
Vote: Yeas Nays
Recorded:
Attest:
Marie Yearman, City Clerk
▪ r' ELGIN, ILLINOIS
• ALFRED-DEMMOND STREET IMPROVEMENTS
CHANGE ORDER NO.1
SCOPE. This Change Order No. 1 covers the addition of the lowering of
certain sanitary sewer stubs within the project. This work was done
immediately to expedite the project.
REASON FOR CHANGE. The new storm sewer which is to be installed along
the westside of Alfred Street is at a depth of approximately five (5)
feet. The sanitary sewer is at a depth of eight (8) to nine (9) feet
in the center of the street. Four (4) of the sewer stubs to the west
were found to have been installed at varying depth which put them in
the path of the storm sewer. It was necessary to remove the old services
and replace them from the property line to the main sewer with plastic
sewer pipe.
CHANGE IN CONTRACT AMOUNT:
Time and material cost of lowering $5,411 .78
four (4) Sanitary Sewer Stubs
By reason of this Change Order No. 1 , the contract cost shall be
increased in the amount of Five Thousand Four Hundred Eleven and 78/100
($5,411.78).
OTHER CONTRACT PROVISIONS. All other provisions of the contract shall
remain the same.
Agreed to this day of , 1983.
Recommended: Approved:
ENGINEERING DIVISION CITY OF ELGIN
Ii�
By C . � �G
Party of the First Part (Owner)
t1O=- �
Date: August 26, 1983' By
Title
Accepted:
E.M. MELAHN CONSTRUCTION CO.
Party of the Secons Part (Contractor)
By
Title
1)
September 21 , 1983
MEMORANDUM
TO: Leo Nelson, City Manager
'e
FROM: Ralph L. Ridley, Civil Engineer I(-k74
RE: Alfred/Demmond Street Improvements
Change Order No. 1
While installing the storm sewer for the above referenced project,
the contractor found that the sanitary sewer stubs for several of the
houses had been raised above the grade they were supposed to be according
to our plans. It was therefore necessary to have the services lowered so
that the storm sewer could be installed to drain the Alfred and Demmond
Intersection.
The contractor was directed to lower the sewer services immediately
to expedite the project. The work was to be done on a time and material
basis plus ten percent (10%) . The invoice from Illinois Hydraulic (a
sub-contractor) itemizing the work and a Invoice from E.M. Melahn
Construction are included.
The original engineers estimate was $171 ,846.25. The bid price
awarded by the City Council on July 11 , 1983 was $126,836.45. The amount
of increase in the contract price is $5,411 .78 which will make the new
contract price $132,248.23. We would therefore request that Change Order
No. 1 (copy attached) be approved by the City Council .
RLR:do
Attachments
cc: Mel Dahl
Gary Miller
Marie Yearman
Mike Sarro
Dan Blondin
.
• E'i W CONSTRUCTION nvoice No. 060 _—._..
E. M. >Y - - :' CO.GO
___CLT.YOF ELGIN P.O. BOX 209 Invoice Date Sept . 1_, 19 _�
150 DFXTER COURT (C. & N.W.R.R. TRACKS & ROUTE 31) EMM Job No. _l 8306
ELG I N , IL 60120 ALGONQUIN, ILLINOIS 60102
PH. (312) 658-4541 Project Name A L F R E D & DEMOND
ATTN : Mr. Ralph Ridley , Project Engineer
___-- STREETS _
E. M. Melahn Pay Estimate # _ For Work Completed Thru
ITEM NO. EMM CODE 1 DESCRIPTION QUANTITY UNIT CONTRACT QUANTITY AMOUNT
_ ._____ _ AWARDED PRICE AMOUNT COMPLETED DUE
SANITARY SEWER STUB ADJUST . _ _ 1 L . S . $ 4 , 919 . 80
PLUS : OVERHEAD & PROFIT @ ld% • 491 . 98
TOTAL AMOUNT THIS INVOICE $ 5 , 411 . 78
}I
I
1
,
. )
r
i ,*!312-742 1516 (^ Invoice 21451
Contract 3026
August 12, 1983
City of Elgin`- 14700
150 Dexter Court, Elgin, Illinois 60120
IN ACCOUNT WITH
_. IL L I N O I S
me I_
iHYDRIULIC
CONSTRUCTION COMPANY•PO BOX 545•ELGIN,IL. 60120
Sanitary Work - Alfred Street
Laborer 65 Hrs.@13.65 887.25
{ Welfare 65 Hrs.@2.61 169.65
Operating Engineer 21 Hrs.@18.65 391.65
Welfare 21 Hrs.@3.85 80.85
Chauffeur 21 Hrs.@15.30 321.30
Welfare 21 Hrs.@2.82 59.22 1600 20
Welfare Fund 309 72
Plus 23°; Payroll Tax 400 05
Plus 157 Payroll & Welfare Fund 286 48
Donahoe 21 Hrs.@22.00 462 00
Dump Truck-3 Axle 21 Hrs.@18.00 378 00
Sand 150 Tons@4.50 675.00 •
6" Surer Pipe 170 L.F.@3.00 510.00
6" 9(Y' Bands 3 Each@21.50 64.50
6" Mission Couplings '10 Each@4.50 45.00
6" Couplings 6 Each@9.00 54.00 1348 50
Plun 107 134 85 4919 80
•
_ ,
. - e.
j
• 4
•- Aekq i°-..yt 4.. .,
ELGIN, ILLINOIS
ALFRED-DEMMOND STREET IMPROVEMENTS
CHANGE ORDER NO.1
SCOPE. This Change Order No. 1 covers the addition of the lowering of
certain sanitary sewer stubs within the project. This work was done
immediately to expedite the project.
REASON FOR CHANGE. The new storm sewer which is to be installed along
the westside of Alfred Street is at a depth of approximately five (5)
feet. The sanitary sewer is at a depth of eight (8) to nine (9) feet
in the center of the street. Four (4) of the sewer stubs to the west
were found to have been installed at varying depth which put them in
the path of the storm sewer. It was necessary to remove the old services
and replace them from the property line to the main sewer with plastic
sewer pipe.
CHANGE IN CONTRACT AMOUNT:
Time and material cost of lowering $5,411 .78
four (4) Sanitary Sewer Stubs
By reason of this Change Order No. 1 , the contract cost shall be
increased in the amount of Five Thousand Four Hundred Eleven and 78/100
($5,411 .78).
OTHER CONTRACT PROVISIONS. All other provisions of the contract shall
remain the same.
Agreed to this day of , 1983.
Recommended: Approved:
ENGINEERING DIVISION CITY OF ELGIN
By(i)7 „ , C Party of the First Part (Owner)
Date: August 26, 1983 By
Title
Accepted:
E.M. MELAHN CONSTRUCTION CO.
Party of the Secons Part (Contractor)
By - ---_--
Title
CITY OF ELGIN
ENGINEERING DIVISION
150 DEXTER COURT-ELGIN,ILLINOIS 80120-5555
Telephones (312) 693- 6500
Ext. 245
TRANSMITTAL LETTER
Date October 25. 1983
To: E. M. Melahn Construction Company
P.O. Box 209
Algonquin, Illinois 60102
Job: Alfred/Demmond Street Improvements
We transmit herewith for your—Information X
Approval
Files X
Correction
Return
Copy of
2 Copies of Change Order Number 1 for the above referenced job.
Sheet Nos. N/A
Remarks One rnpy ic fnr your bonding company and one copy is for your files.
CC: Marie Yearman, City Clerk/ Yours very truly,
Mike Sarro, Purchasing
CITY OF FI GIN
Ra _j_. Ridle , Civi Fngine.Er I
By ( /. e
71 I l r
ELGIN, ILLINOIS
ALFRED-DEMMOND STREET IMPROVEMENTS
CHANGE ORDER NO.1
SCOPE. This Change Order No. 1 covers the addition of the lowering of
certain sanitary sewer stubs within the project. This work was done
immediately to expedite the project.
REASON FOR CHANGE. The new storm sewer which is to be installed along
the westside of Alfred Street is at a depth of approximately five (5)
feet. The sanitary sewer is at a depth of eight (8) to nine (9) feet
in the center of the street. Four (4) of the sewer stubs to the west
were found to have been installed at varying depth which put them in
the path of the storm sewer. It was necessary to remove the old services
and replace them from the property line to the main sewer with plastic
sewer pipe.
CHANGE IN CONTRACT AMOUNT:
Time and material cost of lowering $5,411 .78
four (4) Sanitary Sewer Stubs
By reason of this Change Order No. 1 , the contract cost shall be
increased in the amount of Five Thousand Four Hundred Eleven and 78/100
($5,411 .78).
OTHER CONTRACT PROVISIONS. All other provisions of the contract shall
remain the same.
Agreed to thi s,2¢4---day of 0..6-( r7:7_, , 1983.
Recommended: Approved:
ENGINEERING DIVISION CITY` OF ELGIN
By �g-�
Par of t e it t art (Owner)
Date: August 26, 1983 By
Title
Accepted:
E.M. MELAHN CONSTRUCTION CO.
Party of the SeconedPart (Contractor)
By
Title v'cti.s.