Loading...
HomeMy WebLinkAbout83-1010 EM Melahn '~ 4t3— P310 RESOLUTION APPROVING CHANGE ORDER NO. 1 IN THE CONTRACT WITH E.M. MELAHN CONSTRUCTION CO. FOR THE ALFRED/DFMIOND STREET IMPROVEMENTS WHEREAS, the City of Elgin has heretofore entered into a contract with E.M. Melahn for the Alfred/Demmond Street improvements; and WHEREAS, it is necessary and desirable to modify the terms of the contract as is described in Change Order Number 1, attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that Leo Nelson, City Manager, be and is hereby author- ized and directed to execute Change Order Number 1, a copy of which is attached hereto and made a part hereof by reference. kichard L. Verbic, Mayor Presented: October 10, 1983 Adopted: Vote: Yeas Nays Recorded: Attest: Marie Yearman, City Clerk ▪ r' ELGIN, ILLINOIS • ALFRED-DEMMOND STREET IMPROVEMENTS CHANGE ORDER NO.1 SCOPE. This Change Order No. 1 covers the addition of the lowering of certain sanitary sewer stubs within the project. This work was done immediately to expedite the project. REASON FOR CHANGE. The new storm sewer which is to be installed along the westside of Alfred Street is at a depth of approximately five (5) feet. The sanitary sewer is at a depth of eight (8) to nine (9) feet in the center of the street. Four (4) of the sewer stubs to the west were found to have been installed at varying depth which put them in the path of the storm sewer. It was necessary to remove the old services and replace them from the property line to the main sewer with plastic sewer pipe. CHANGE IN CONTRACT AMOUNT: Time and material cost of lowering $5,411 .78 four (4) Sanitary Sewer Stubs By reason of this Change Order No. 1 , the contract cost shall be increased in the amount of Five Thousand Four Hundred Eleven and 78/100 ($5,411.78). OTHER CONTRACT PROVISIONS. All other provisions of the contract shall remain the same. Agreed to this day of , 1983. Recommended: Approved: ENGINEERING DIVISION CITY OF ELGIN Ii� By C . � �G Party of the First Part (Owner) t1O=- � Date: August 26, 1983' By Title Accepted: E.M. MELAHN CONSTRUCTION CO. Party of the Secons Part (Contractor) By Title 1) September 21 , 1983 MEMORANDUM TO: Leo Nelson, City Manager 'e FROM: Ralph L. Ridley, Civil Engineer I(-k74 RE: Alfred/Demmond Street Improvements Change Order No. 1 While installing the storm sewer for the above referenced project, the contractor found that the sanitary sewer stubs for several of the houses had been raised above the grade they were supposed to be according to our plans. It was therefore necessary to have the services lowered so that the storm sewer could be installed to drain the Alfred and Demmond Intersection. The contractor was directed to lower the sewer services immediately to expedite the project. The work was to be done on a time and material basis plus ten percent (10%) . The invoice from Illinois Hydraulic (a sub-contractor) itemizing the work and a Invoice from E.M. Melahn Construction are included. The original engineers estimate was $171 ,846.25. The bid price awarded by the City Council on July 11 , 1983 was $126,836.45. The amount of increase in the contract price is $5,411 .78 which will make the new contract price $132,248.23. We would therefore request that Change Order No. 1 (copy attached) be approved by the City Council . RLR:do Attachments cc: Mel Dahl Gary Miller Marie Yearman Mike Sarro Dan Blondin . • E'i W CONSTRUCTION nvoice No. 060 _—._.. E. M. >Y - - :' CO.GO ___CLT.YOF ELGIN P.O. BOX 209 Invoice Date Sept . 1_, 19 _� 150 DFXTER COURT (C. & N.W.R.R. TRACKS & ROUTE 31) EMM Job No. _l 8306 ELG I N , IL 60120 ALGONQUIN, ILLINOIS 60102 PH. (312) 658-4541 Project Name A L F R E D & DEMOND ATTN : Mr. Ralph Ridley , Project Engineer ___-- STREETS _ E. M. Melahn Pay Estimate # _ For Work Completed Thru ITEM NO. EMM CODE 1 DESCRIPTION QUANTITY UNIT CONTRACT QUANTITY AMOUNT _ ._____ _ AWARDED PRICE AMOUNT COMPLETED DUE SANITARY SEWER STUB ADJUST . _ _ 1 L . S . $ 4 , 919 . 80 PLUS : OVERHEAD & PROFIT @ ld% • 491 . 98 TOTAL AMOUNT THIS INVOICE $ 5 , 411 . 78 }I I 1 , . ) r i ,*!312-742 1516 (^ Invoice 21451 Contract 3026 August 12, 1983 City of Elgin`- 14700 150 Dexter Court, Elgin, Illinois 60120 IN ACCOUNT WITH _. IL L I N O I S me I_ iHYDRIULIC CONSTRUCTION COMPANY•PO BOX 545•ELGIN,IL. 60120 Sanitary Work - Alfred Street Laborer 65 Hrs.@13.65 887.25 { Welfare 65 Hrs.@2.61 169.65 Operating Engineer 21 Hrs.@18.65 391.65 Welfare 21 Hrs.@3.85 80.85 Chauffeur 21 Hrs.@15.30 321.30 Welfare 21 Hrs.@2.82 59.22 1600 20 Welfare Fund 309 72 Plus 23°; Payroll Tax 400 05 Plus 157 Payroll & Welfare Fund 286 48 Donahoe 21 Hrs.@22.00 462 00 Dump Truck-3 Axle 21 Hrs.@18.00 378 00 Sand 150 Tons@4.50 675.00 • 6" Surer Pipe 170 L.F.@3.00 510.00 6" 9(Y' Bands 3 Each@21.50 64.50 6" Mission Couplings '10 Each@4.50 45.00 6" Couplings 6 Each@9.00 54.00 1348 50 Plun 107 134 85 4919 80 • _ , . - e. j • 4 •- Aekq i°-..yt 4.. ., ELGIN, ILLINOIS ALFRED-DEMMOND STREET IMPROVEMENTS CHANGE ORDER NO.1 SCOPE. This Change Order No. 1 covers the addition of the lowering of certain sanitary sewer stubs within the project. This work was done immediately to expedite the project. REASON FOR CHANGE. The new storm sewer which is to be installed along the westside of Alfred Street is at a depth of approximately five (5) feet. The sanitary sewer is at a depth of eight (8) to nine (9) feet in the center of the street. Four (4) of the sewer stubs to the west were found to have been installed at varying depth which put them in the path of the storm sewer. It was necessary to remove the old services and replace them from the property line to the main sewer with plastic sewer pipe. CHANGE IN CONTRACT AMOUNT: Time and material cost of lowering $5,411 .78 four (4) Sanitary Sewer Stubs By reason of this Change Order No. 1 , the contract cost shall be increased in the amount of Five Thousand Four Hundred Eleven and 78/100 ($5,411 .78). OTHER CONTRACT PROVISIONS. All other provisions of the contract shall remain the same. Agreed to this day of , 1983. Recommended: Approved: ENGINEERING DIVISION CITY OF ELGIN By(i)7 „ , C Party of the First Part (Owner) Date: August 26, 1983 By Title Accepted: E.M. MELAHN CONSTRUCTION CO. Party of the Secons Part (Contractor) By - ---_-- Title CITY OF ELGIN ENGINEERING DIVISION 150 DEXTER COURT-ELGIN,ILLINOIS 80120-5555 Telephones (312) 693- 6500 Ext. 245 TRANSMITTAL LETTER Date October 25. 1983 To: E. M. Melahn Construction Company P.O. Box 209 Algonquin, Illinois 60102 Job: Alfred/Demmond Street Improvements We transmit herewith for your—Information X Approval Files X Correction Return Copy of 2 Copies of Change Order Number 1 for the above referenced job. Sheet Nos. N/A Remarks One rnpy ic fnr your bonding company and one copy is for your files. CC: Marie Yearman, City Clerk/ Yours very truly, Mike Sarro, Purchasing CITY OF FI GIN Ra _j_. Ridle , Civi Fngine.Er I By ( /. e 71 I l r ELGIN, ILLINOIS ALFRED-DEMMOND STREET IMPROVEMENTS CHANGE ORDER NO.1 SCOPE. This Change Order No. 1 covers the addition of the lowering of certain sanitary sewer stubs within the project. This work was done immediately to expedite the project. REASON FOR CHANGE. The new storm sewer which is to be installed along the westside of Alfred Street is at a depth of approximately five (5) feet. The sanitary sewer is at a depth of eight (8) to nine (9) feet in the center of the street. Four (4) of the sewer stubs to the west were found to have been installed at varying depth which put them in the path of the storm sewer. It was necessary to remove the old services and replace them from the property line to the main sewer with plastic sewer pipe. CHANGE IN CONTRACT AMOUNT: Time and material cost of lowering $5,411 .78 four (4) Sanitary Sewer Stubs By reason of this Change Order No. 1 , the contract cost shall be increased in the amount of Five Thousand Four Hundred Eleven and 78/100 ($5,411 .78). OTHER CONTRACT PROVISIONS. All other provisions of the contract shall remain the same. Agreed to thi s,2¢4---day of 0..6-( r7:7_, , 1983. Recommended: Approved: ENGINEERING DIVISION CITY` OF ELGIN By �g-� Par of t e it t art (Owner) Date: August 26, 1983 By Title Accepted: E.M. MELAHN CONSTRUCTION CO. Party of the SeconedPart (Contractor) By Title v'cti.s.