Loading...
HomeMy WebLinkAbout79-0627 Railroad • RESOLUTION AUTHORIZING A SUPPLEMENT TO AN AGREEMENT WITH THE CHICAGO, MILWAUKEE, ST. PAUL AND PACIFIC RAILROAD COMPANY WHEREAS, the City of Elgin has heretofore entered into an agree- ment with the Chicago, Milwaukee, St. Paul and Pacific Railroad Company • for the granting by the railroad to the city a temporary construction easement along Big Timber Road and a license right to install, construct and maintain drainage facilities located on the right of way; and WHEREAS, the City of Elgin has requested additional authority to install storm sewers parallel to and north of the railroad tracks: NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that Leo I. Nelson, City Manager, be and is hereby authorized and directed toexecute acceptance of a supplemental letter of agreement dated June 4, 1979 with the Chicago, Milwaukee, St. Paul and Pacific Railroad Company, a copy of which is attached hereto and made a part hereof by reference. kichard L. Verbic, Mayor Presented: June 27, 1979 Adopted: Vote: Yeas Nays Recorded: Attest: Marie Yearman, City Clerk • ' /11:_ ',-:, Chicago, Milwaukee, St. Paul and Pacific Railroad Company 516 West Jackson Boulevard Chicago, Illinois 60606 Phone 312/648-3000 June 4, 1979 273 IL Elgin McLean Blvd. Mr. Melford A. Dahl, P. E. Director of Public Works City of Elgin 150 Dexter Court Elgin, Illinois 60120 RE: Big Timber Road - North McLean Blvd. Intersection Improvement Section: 75-00094-01-TL Dear Mr. Dahl: Reference is made to the City's letter of May 23, 1979, requesting a license to install a storm sewer parallel to and north of our tracks as part of the subject project. It is our understanding that the City desires to install approximately 820 feet of 24 inch concrete storm sewer and approximately 280 feet of 36 inch concrete storm sewer on Railroad right-of-way as shown in yellow on the attached plan marked Exhibit "X" dated 5/22/79. Catch basins within Big Timber Road would be connected to the sewer by laterals. The storm sewer would also carry McLean Blvd. surface drainage and our sub- surface drainage from the grade crossing area. The City and Railroad are parties to an Agreement which provides, in part, for granting by the Railroad to the City of a temporary construction easement along Big Timber Road and a license right to install, construct and maintain on railroad right-of-way such drainage facilities as may be required to drain said right-of-way at the McLean Blvd. grade crossing. The license right is terminable only upon mutual agreement between the 1 City and Railroad or upon need of the property for other rail related purposes. The existing agreement contains provisions for protection of Railroad traffic and facilities during work by any contractor or contractors for the City. We have no objection to the proposed construction of the storm sewer as shown in yellow on attached Exhibit "X" under the grantings and provisions of the existing agreement. The City's contractor shall be responsible for protection of the Railroad's poleline, other facilities and rail traffic during construction, and the City shall be responsible for the maintenance and operation of the storm sewer after construction is completed. cont'd , June 4, 1979 273 IL Elgin McLean Blvd. Mr. Melford A. Dahl, P. E. Page 2 This letter is furnished in duplicate as a proposed supplement to the existing agreement. If the proposal is acceptable to the City, please have both letters signed and return one to this office so that we can attach it to the Railroad 's copy of the executed agreement. Very truly yours, —4— W. E. Fuhr Assistant Chief Engineer-Staff Proposal by STANLEY E. G. HILLMAN, AS TRUSTEE OF THE PROPERTY OF THE CHICAGO, MILWAUKEE, ST. PAUL AND PACIFIC RAILROAD COMPANY, DEBTOR By: i f-1, —T1.- Lic . B. J Worley, V.P Chief Engineer Accepted by CITY OF ELGIN, ILLINOIS By: ftil 4. , : • I I ...----,.. 4.•---.-.-.—. I 1 ......... 1 4 9/6' , 77AliteR \ AOAD 4.- .. • -- -- -- -_ . -- - i.-_ • — _ -_._ . i . - • __ . ea 0't Ave...o44-4 it; ST016; azwe4 e-Iwo i .4.40frosZO .I41' Jr0AINI .COAkkitkt V • k 7-0 C AbC46 0-- ,... ... .. IS 4 anN r/AligER 4 Ai 0 v E N , k N ct ki .1 - NI t., k • , 4 so' .. ExHIB1T ,i X9 9 , ___i_r_ 1 r .:! 1 IO' .8 E 40 w B/4 k vl ENGoo-.ERsriG DEPARTM.:EET C.M.SI.P.&P.R.P.CL. • 1-< 3 0 PLAT SHOWING __RR_0_,.5:M45-.0 47W 11, cRom st rizAcK Ae a 7/A-tez4 _Ro 4.o Atc_I-EAAt....94Y,42._.... .__ 2141.-e#4,54c7-,04Y.....reve.4oge,124-A/7:_ _e& • TYPiCAL CRoSS 6•E C 770 N Sis/0 W/A/6 PRO P oSE.0 .5-7DRIV .S.E weR SCALE- _1410__Fi:ET PEI,INCH OFFICE OF AS.S1.DOSE L.,:!NZE;E-Sii,USTIASS ----* SeKE4E.: i''le- /.,i .5--22-7•Z__ CI•RtAGO,ILLINOIS