Loading...
HomeMy WebLinkAbout25-71 Resolution No. 25-71 RESOLUTION AUTHORIZING EXECUTION OF A CHANGE ORDER NO. 1 WITH FIVE STAR ENERGY SERVICES LLC FOR YEAR 3 LEAD SERVICE LINE REPLACEMENT—CONTRACT B (Bid No. 24-017) WHEREAS, the City of Elgin has heretofore entered into a contract Five Star Energy Services LLC for Year 3 Lead Service Line Replacement—Contract B (Bid No. 24-017); and WHEREAS,it is necessary and desirable to modify the terms of the contract as is described in Change Order No. 1 attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS,that Richard G.Kozal,City Manager,be and is hereby authorized and directed to execute Change Order No. 1, a copy of which is attached hereto and made a part hereof by reference. s/David J. Kaptain David J. Kaptain, Mayor Presented: April 9, 2025 Adopted: April 9, 2025 Omnibus Vote: Yeas: 9 Nays: 0 Attest: s/Kimberly Dewis Kimberly Dewis, City Clerk City of Elgin Change Order or rt e • a �j '�,,.,� ELGIN,ILLINOIS .4•." PROJECT#Bid No.24-017 CHANGE ORDER No.1 CONTRACT:Year 3 Lead Service Line Replacement--Contract B (Bid No.24-017) SCOPE: The Year 3 Lead Service Line Replacement Program — Contract B project objective was to replace approximately 740 lead service lines by March 31, 2025. The total original contract amount was $7,951,574.00. This change order would allow for approximately sixty (60) additional lead service line replacements utilizing project savings from another contract. REASONS FOR CHANGE: The City's LSLR IEPA loan value for Year 3 construction costs is $9,535,081.00, which includes both Contracts B and C construction costs.Contract C is nearing completion with an estimated$665,979.36 in contract value remaining.Due to the savings on Contract C,it is in the best interests of the City to transfer the estimated remaining contract value from Contract C to Contract B.A final balancing change order will be completed for both Contract B and Contract C once final construction costs are known. The circumstances said to necessitate the change in performance were not reasonably foreseeable at the time the contract was signed; the proposed change is germane to the original contract as signed; and the change order is in the best interests of the City of Elgin and is authorized by law. SUMMARY OF CHANGES IN CONTRACT TIME AND WORK: ORIGINAL CONTRACT AMOUNT: $7,951,574.00 CHANGE ORDER No. I ADD $665,979.36 TOTAL FOR CHANGE ORDER NO. 1: ADD $665,979.36 TOTAL REVISED CONTRACT AMOUNT: $8,617,553.36 The original amount of the contract with Five Star Energy Services LLC is$7,951,574.00. Change Or- der No. 1 will increase the contract amount by a total of$665,979.36,that sum representing 8.4%of the original contract amount. The revised contract amount inclusive of all change orders is $8,617,553.36. OTHER CONTRACT PROVISIONS:All other contract provisions remain the same. CHANGE ORDER No. 1 Agreed to this 9 day of April ,2025. Recommended by: Water Department By: Nora Bertram _ Title: Water Director _ Date: 3 f ZO/ z Signature: /471-- Engineering Enterprises,Inc. Party of the Second Part(Engineer) By: Julie A.Morrison. P.E. Title: Vice President/Principal Date: .3//y_3 r)r Signature: Gi.,.t Accepted by: Five Star Energy Services LLC Party of the Second Part(Contractor) By: M1(:�E kc.sNt8 �. Title: CE0 �tQ•-ES lIk'tiY � _ Date: 11Lcikt~H ZO, Zoe 5 Signature: ^� Approved by: CITY OF ELGIN Party of the First Part(Owner) By: Richard G.Kozal Title: Ci:. Mana,er Date: API' Signature: C:1Userslhailey_k1HoxUsgal DeptlAgrccmcnt\Change Order No.t-Five Star Energy-[SLR Year 3-Contract B-Clean-3-14-25.docx