HomeMy WebLinkAbout25-3 Resolution No. 25-3
RESOLUTION
AUTHORIZING EXECUTION OF A CHANGE ORDER NO. 1 WITH F.H. PASCHEN FOR
ELGIN POLICE DEPARTMENT CONCRETE REPLACEMENT JOB ORDER CONTRACT
WHEREAS,the City of Elgin has heretofore entered into a contract F.H. Paschen for Elgin
Police Department concrete replacement job order contract; and
WHEREAS, it is necessary and desirable to modify the terms of the contract as is described
in Change Order No. 1 attached hereto.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
ELGIN, ILLINOIS,that Richard G.Kozal,City Manager,be and is hereby authorized and directed
to execute Change Order No. 1, a copy of which is attached hereto and made a part hereof by
reference.
s/David J. Kaptain
David J. Kaptain, Mayor
Presented: January 8, 2025
Adopted: January 8, 2025
Omnibus Vote: Yeas: 7 Nays: 0
Attest:
s/Kimberly Dewis
Kimberly Dewis, City Clerk
1r OF r,c,
�, � City of Elgin -- Change Order
.l
4,1 0
ELGIN, ILLINOIS
PROJECT M00210
CHANGE ORDER No. 1
CONTRACT: Elgin Police Department Concrete Replacement-Job Order Contract
SCOPE: Addition of limestone and CMU block wall replacement, as well as handrail repairs
and additional miscellaneous work.
REASONS FOR CHANGE: Upon demolition of the existing limestone blocks, it was discov-
ered that more block is required to be replaced. The CMU block wall supporting the limestone
was also found to be compromised, rendering the foundational wall useless for the new lime-
stone. Other necessary changes have been discovered as the project has progressed and revealed
other deficiencies. This includes necessary repairs to handrails and pavers, installation of con-
struction fencing, additional caulking work and pavers to be reconfigured. Much of this addition-
al work is necessary to prolong the lifespan of the final product.
The circumstances said to necessitate the changes in performance were not reasonably foreseea-
ble at the time the contract was signed. The changes are germane to the original contract as
signed. This change order is in the best interests of the City of Elgin and authorized by law.
SUMMARY OF CHANGES IN CONTRACT AMOUNT:
ORIGINAL CONTRACT AMOUNT: $465,138.81
CHANGE ORDER NO. 1
CMU replacement and additional limestone, as well as
handrail repairs and miscellaneous additional work ADD $51,481.33
TOTAL FOR CHANGE ORDER NO. 1: ADD $51,481.33
TOTAL REVISED CONTRACT AMOUNT: $516,620.14
The original amount of the contract with F.H. Paschen is $465,138.81. Change Order No. 1 will
increase the original contract amount by a total of$51,481.33, that sum representing 11.06% of
the original contract amount. The new contract amount, inclusive of all change orders, is
$516,620.14.
OTHER CONTRACT PROVISIONS: All other contract provisions remain the same.
1
CHANGE ORDER No. 1
Agreed to this 8th day of-January,2025-
Recommended by:
Building Maintenance
By: Glen Dettman
Title: Interim Superintendent
Date: /Y //
Signature: r% ,' t
Accepted by:
F.H.Paschen
By: Josh Curran
Title: Vice President
Date: 12/11/2024
DigrobJ ar. uY sped
o n umbj.
Cuban
o=F.H.P..cM,.n
Signature: _.
Approved by:
CITY OF ELGIN
Party of the First Part(Owner)
By: Richard G. Kozal
Title: City Manager
Date: Jan 8, 2025
Signature:
Legal Dept\Agreement\Change Order No 1-FH Paschen-EPD Concrete Repair Project M00210-Clean-12-6-24.doc