Loading...
HomeMy WebLinkAbout25-3 Resolution No. 25-3 RESOLUTION AUTHORIZING EXECUTION OF A CHANGE ORDER NO. 1 WITH F.H. PASCHEN FOR ELGIN POLICE DEPARTMENT CONCRETE REPLACEMENT JOB ORDER CONTRACT WHEREAS,the City of Elgin has heretofore entered into a contract F.H. Paschen for Elgin Police Department concrete replacement job order contract; and WHEREAS, it is necessary and desirable to modify the terms of the contract as is described in Change Order No. 1 attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS,that Richard G.Kozal,City Manager,be and is hereby authorized and directed to execute Change Order No. 1, a copy of which is attached hereto and made a part hereof by reference. s/David J. Kaptain David J. Kaptain, Mayor Presented: January 8, 2025 Adopted: January 8, 2025 Omnibus Vote: Yeas: 7 Nays: 0 Attest: s/Kimberly Dewis Kimberly Dewis, City Clerk 1r OF r,c, �, � City of Elgin -- Change Order .l 4,1 0 ELGIN, ILLINOIS PROJECT M00210 CHANGE ORDER No. 1 CONTRACT: Elgin Police Department Concrete Replacement-Job Order Contract SCOPE: Addition of limestone and CMU block wall replacement, as well as handrail repairs and additional miscellaneous work. REASONS FOR CHANGE: Upon demolition of the existing limestone blocks, it was discov- ered that more block is required to be replaced. The CMU block wall supporting the limestone was also found to be compromised, rendering the foundational wall useless for the new lime- stone. Other necessary changes have been discovered as the project has progressed and revealed other deficiencies. This includes necessary repairs to handrails and pavers, installation of con- struction fencing, additional caulking work and pavers to be reconfigured. Much of this addition- al work is necessary to prolong the lifespan of the final product. The circumstances said to necessitate the changes in performance were not reasonably foreseea- ble at the time the contract was signed. The changes are germane to the original contract as signed. This change order is in the best interests of the City of Elgin and authorized by law. SUMMARY OF CHANGES IN CONTRACT AMOUNT: ORIGINAL CONTRACT AMOUNT: $465,138.81 CHANGE ORDER NO. 1 CMU replacement and additional limestone, as well as handrail repairs and miscellaneous additional work ADD $51,481.33 TOTAL FOR CHANGE ORDER NO. 1: ADD $51,481.33 TOTAL REVISED CONTRACT AMOUNT: $516,620.14 The original amount of the contract with F.H. Paschen is $465,138.81. Change Order No. 1 will increase the original contract amount by a total of$51,481.33, that sum representing 11.06% of the original contract amount. The new contract amount, inclusive of all change orders, is $516,620.14. OTHER CONTRACT PROVISIONS: All other contract provisions remain the same. 1 CHANGE ORDER No. 1 Agreed to this 8th day of-January,2025- Recommended by: Building Maintenance By: Glen Dettman Title: Interim Superintendent Date: /Y // Signature: r% ,' t Accepted by: F.H.Paschen By: Josh Curran Title: Vice President Date: 12/11/2024 DigrobJ ar. uY sped o n umbj. Cuban o=F.H.P..cM,.n Signature: _. Approved by: CITY OF ELGIN Party of the First Part(Owner) By: Richard G. Kozal Title: City Manager Date: Jan 8, 2025 Signature: Legal Dept\Agreement\Change Order No 1-FH Paschen-EPD Concrete Repair Project M00210-Clean-12-6-24.doc 2