Loading...
HomeMy WebLinkAbout25-204 Resolution No. 25-204 RESOLUTION AUTHORIZING EXECUTION OF A CHANGE ORDER NO. 1 WITH INNOVATION LANDSCAPE, INC. FOR SUMMERHILL PARK RENOVATIONS (Bid No. 25-005) WHEREAS,the City of Elgin has heretofore entered into a contract Innovation Landscape, Inc. for Summerhill Park Renovations (Bid No. 25-005); and WHEREAS,it is necessary and desirable to modify the terms of the contract as is described in Change Order No. 1 attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN,ILLINOIS,that Richard G. Kozal,City Manager,be and is hereby authorized and directed to execute Change Order No. 1, a copy of which is attached hereto and made a part hereof by reference. s/David J. Kaptain David J. Kaptain, Mayor Presented: December 3, 2025 Adopted: December 3, 2025 Omnibus Vote: Yeas: 9 Nays: 0 Attest: s/Kimberly Dewis Kimberly Dewis, City Clerk LKM O`(4 o,ti City of Elgin Change Order iri: ELGIN,ILLINOIS PROJECT: Bid No.25-005 CHANGE ORDER No. l CONTRACT: Summerhill Park Renovations—Bid No. 25-005 SCOPE: To perform topsoil undercut and drain installation for area underneath pickleball and basketball courts to ensure proper compaction and drainage. REASONS FOR CHANGE: When the project was initially bid, site conditions did not suggest that the depth of the topsoil would be as extensive as it was discovered to be.In order to maintain the integrity and longevity of the basketball and pickleball courts, additional topsoil must be re- moved and additional drainage added to create a solid surface to install asphalt for the courts. The circumstances said to necessitate the change in performance were not reasonably foreseeable at the time the contract was signed. The change is germane to the original contract as signed. This change order is in the best interests of the City of Elgin and authorized by law. SUMMARY OF CHANGES IN CONTRACT AMOUNT: This contract is being increased by $69,330. This will allow the contractor to perform the topsoil removal and installation of drain- age as described above. ORIGINAL CONTRACT AMOUNT: $1,308,529 CHANGE ORDER No. 1 Perform additional topsoil removal and drainage work ADD $69,330 TOTAL FOR CHANGE ORDER NO. 1 ADD $69,330 TOTAL REVISED CONTRACT AMOUNT: $1,377,859 The original amount of the contract with Innovation Landscape Inc. was $1,308,529.00. Change Order No. 1 totaling $69,330 will increase the original contract amount by a total of$69,330, that sum representing 5.3% of the original contract amount. The new contract amount, inclusive of all change orders, is$1,377,859. OTHER CONTRACT PROVISIONS: All other contract provisions remain the same. CHANGE ORDER No. 1 Agreed to this 3 day of December , 2025. Recommended by: Parks and Recreation Department By:_Greg Hulke _ Title: Parks and Facilities Superintendent Date: Octobyr 0,2025 Signature: / Accepted by: Innovation Landscape,Inc. Party of the Second Part(Contractor) By: Nataly Diaz Title: President _ Date: 11/21/2 2 Signature: _ - - Approved by: CITY OF ELGIN Party of the First Part(Owner) By: Richard G.Kozal Title: City Manager Date: D• b;dc 2025 __ / ' Signature: Air �//( Legal DepAWgreement Innovation Landscape-Change Order I-Bid 25-005 Summerhill Park-Clean-11-5-25.doc