Loading...
HomeMy WebLinkAbout25-193 Resolution No. 25-193 RESOLUTION AUTHORIZING EXECUTION OF A CHANGE ORDER NO. 1 AND FINAL WITH TRINE CONSTRUCTION CORP. FOR YEAR 3 LEAD SERVICE LINE REPLACEMENT—CONTRACT A (Bid No. 24-016) WHEREAS, the City of Elgin has heretofore entered into a contract Trine Construction Corp. for Year 3 Lead Service Line Replacement—Contract A (Bid No. 24-016); and WHEREAS,it is necessary and desirable to modify the terms of the contract as is described in Change Order No. 1 and Final attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN,ILLINOIS,that Richard G.Kozal,City Manager,be and is hereby authorized and directed to execute Change Order No. 1 and Final, a copy of which is attached hereto and made a part hereof by reference. s/David J. Kaptain David J. Kaptain, Mayor Presented: November 19, 2025 Adopted: November 19, 2025 Omnibus Vote: Yeas: 8 Nays: 0 Attest: s/Kimberly Dewis Kimberly Dewis, City Clerk t��� or Etc. p , D % City of Elgin — Change Order del Aircn�4, ELGIN,ILLINOIS PROJECT#Bid No. 24-016 CHANGE ORDER No. 1 and Final CONTRACT: Year 3 Lead Service Line Replacement—Contract A(Bid No. 24-016) SCOPE: The Year 3 Lead Service Line Replacement Program — Contract A project has been completed, and final quantities are now known. REASONS FOR CHANGE: Change Order No. 1 and Final is the balancing change order to document the final construction value. The circumstances said to necessitate the change in performance were not reasonably foreseeable at the time the contract was signed; the proposed change is germane to the original contract as signed; and the change order is in the best interests of the City of Elgin and is authorized by law. SUMMARY OF CHANGES IN CONTRACT TIME AND WORK: ORIGINAL CONTRACT SUBSTANTIAL COMPLETION DATE: March 31,2025 ORIGINAL CONTRACT COMPLETION DATE: June 1, 2025 ORIGINAL CONTRACT AMOUNT: $4,548,923.75 CHANGE ORDER No. 1 ADD $91,008.37 TOTAL FOR CHANGE ORDER NO. 1: ADD $91,008.37 TOTAL REVISED CONTRACT SUBSTANTIAL COMPLETION DATE: July 31, 2025 TOTAL REVISED CONTRACT COMPLETION DATE: December 1, 2025 TOTAL REVISED CONTRACT AMOUNT: $4,639,932.12 The original amount of the contract with Trine Construction Corp. is$4,548,923.75. Change Order No. 1 will increase the contract amount by a total of$91,008.37, that sum representing 2%of the original contract amount. The revised contract amount inclusive of all change orders is $4,639,932.12. OTHER CONTRACT PROVISIONS: All other contract provisions remain the same. CHANGE ORDER No. 1 Agreed to this 19 day of November ,2025. Recommended by: Water Department By: Nora Bertram Title: Water Director Date: UUl l Z,S' Signature: c-f) /1231... Engineering Enterprises,Inc. Party of the Second Part(Engineer) By: Julie A. Morrison,P.B. Title: Vice President/Principal Date: 11/11/2025 Signature: - --=' " .,.�.+� Accepted by: Trine Construction Corp. Party of the Second Part(Contractor) By: M; I `( rAAsa.! Title: Vic.. Date: ll`1t1Z S Signature: :4„ \\)\,,_._ Approved by: CITY OF ELGIN Party of the First Part(Owner) By: Richard G.Kozal Title: City Manager _ Date: No r 19,2025 Signature: _ CHANGE ORDER NO.1 AND FINAL YEAR 3 LEAD SERVICE LINE REPLACEMENT PROGRAM-CONTRACT A CITY OF ELGIN RBA NO. ITEMS UNIT CONTRACT ADJUSTED UNIT PRICEADDITIONS DEDUCTIONS QUANTITY QUANTITY QUANTITY COST QUANTITY COST 1 HOME ASSESSMENT EACH 1120 183.0 $197.40 71.0 S 14,015.40 S - 2 POINT-OF-USE WATER FILTER AND CARTRIDGES EACH 170.0 207.0 $43.70 37.0 $ 1.616.90 $ - 3 TREE ROOT PRUNING EACH 3.0 00 $172.50 3.0 $ 517.50 4 TREE REMOVAL(6-15 UNIT DIAMETER) UNIT 70.0 52 5 $86.25 17.5 $ 1,511.10 5 TREE REMOVAL 115+UNIT DIAMETER) UNIT 60.0 0.0 $109.25 I 60.0'$ 6,555.00 6 REPLACEMENT TREE - - EACH 10.0 0.0 $690.00 10.0 $ 6,900.00 7 ASBESTOS ABATEMENT EACH 3.0 0 0 $1�15"0�.00 3.0 $ 3.450.00 8 SELECT GRANULAR BACKFILL CY 4440.0 4939.2 I69.00 4992 $ 34,441.35 9 CONTROLLED LOW-STRENGTH MATERIAL CY 300.0 173 0 $143.75 127.0 $ 18,256.25 10 POTHOLE EXISTING WATER SERVICE EACH 15.0 6.0 $408.67 9.0 $ 3.678.03 11 STRUCTURE ABANDONMENT EACH 5.0 0 0 540250 5.0 $ 2,012.50 12 ,WATER SERVICE ABANDONMENT ' EACH 20 5.0 $2,533.05 3.0 $ 7,599.15, $ - 13 WATER SERVICE CONNECTION AT BBOX.1-INCH EACH 10.0 8 0 $3.672.06 2.0 $ 7,344.16 14 WATER SERVICE CONNECTION AT BBOX,2-INCH EACH 8.0 0.0 $4.360.50 8.0 $ 34,884.00 15 WATER SERVICE CONNECTION AT MAIN,1-INCH EACH 93.0 175 0 $4,486.82 820 $ 366.279.24 $ - 16 WATER SERVICE CONNECTION AT MAIN,2-INCH _ EACH 8A 3.0 $61 014.35 5.0 $ 30,071.75 17 TAPPING SADDLE-4' EACH 5.0 12.0 $126.04 7.0 $ 882.28 $ - 18 TAPPING SADDLE-6' EACH 1.0 0 0 134.60 1.0 $ 134.60 19 TAPPING SADDLE-W. EACH 20 C.0' $138.52 20 $ 273.04 20 TAPPING SADDLE•10' EACH 10.0 0.0 158.70 10.0 $ 1,587.00 21 NAPPING SADDLE-12' EACH 20 0.0 $170.17 20 $ 340.34 22 REPAIR SLEEVE-4' EACH 3.0 0.0' $797.69 3.0 $ 2.393.07 23 REPAIR SLEEVE-6' EACH 1.0 0.0 $813.86 1.0 $ 813.86 24 REPAIR SLEEVE-8' EACH 20 1.0 $824.54 1.0 $ 824.54' 25 REPAIR SLEEVE-10' EACH 5.0 0 0 $913.14 5.0 $ 4,565.70 26 REPAIR SLEEVE-12' EACH 1.0 0.0 $928.82 1.0 $ 928.82 27 ENCAPSULATION SLEEVE-4' EACH 1.0 0.0 $2,459.97 _ 1.0 $ 2.459.97 28 ENCAPSULATION SLEEVE-6' EACH 1.0 0.0 $2.605.29 1.0 $ 2.60529 29 ENCAPSULATION SLEEVE-8' EACH 20 0.0 $2,934.94 2.0$ 5.869.88 30 ENCAPSULATION SLEEVE-10' EACH 5.0 0 0 $3,611.18 5.0 $ 18,055.90 31 ENCAPSULATION SLEEVE-12' EACH 1.0 0.0 $3,800.09 1.0 $ 3,800.09 32 WATER SERVICE INSTALLATION,TYPE K 1-INCH LF 6900.0 10465 0 $3244 3565.0 $ 115,648.60 $ - 33 WATER SERVICE INSTALLATION.TYPE K 2-INCH LF 1000.0 113.0 $49.98 887.0 $ 44,33226 34 WATER SERVICE CONNECTION AT METER EACH 100.0 168.0 $1,125.42' 66.0 $ 74277.72 $ - 35 WATER SERVICE PIPE,TYPE L.1-INCH LF 50.0 0.0 583.63 50.0 $ 4,181.50 36 WATER SERVICE PIPE,TYPE L,3/4-INCH IF 150.0 10 0 $84.78 140.0 $ 11,86920 37 INTERNAL PLUMBING FITTINGS REPLACEMENT EACH 10.0 7 0 5403.50 3.0 $ 1,480.50 36 GROUNDING EACH 5.0 4 0 $1118�4�0�.00 1.0 $ 1,840.00 39 RPZ VALVE REPAIR EACH 15.0 0.0 $480.00 15.0 $ 6,900.00 40 SANITARY SEWER SERVICE REPAIR EACH 56.0 9.0 $2,436.10 47.0 $ 114,496.70 41 BRICK PAVER REMOVAL AND REINSTALLATION SF 200.0 174.0 $13.80 26.0 $ 358.80' 42 PCC SIDEWALK REMOVAL SF 8075.0 6133.8 $2.59 1941.3 $ 5,027.84 43 PCC SIDEWALK REPLACEMENT SF 8075.0' 6896 6 $16.10 1178.E $ 18,973.05 44 CONCRETE CURB AND GUTTER REMOVAL LF 1230.0 1184.7 $13.80 45.3 $ 625.14 46 CONCRETE CURB AND GUTTER REPLACEMENT LF 1230.0 1395 9 $57.50 165.9 $ 9,53925 46 CONCRETE CURB AND GUTTER REMOVAL(IDOT) IF 280.0 167.6 $20.70 1124 $ 2,326.68 47 CONCRETE CURB AND GUTTER REPLACEMENT(IDOT; LF 280.0 158.8 589.00 121.2 $ 8,362.80 46 HOT-MX ASPHALT PAVEMENT REMOVAL SY 48820 4180.3 $14.38‘ 501.7 $ 7,213.87 49 HOT-MX ASPHALT PAVEMENT PATCH.8-INCH SY 42320 '209.3 5156.40 30227 $ 472.751.84 50 HOT-MX ASPHALT PAVEMENT PATCH(IDOT),12-RICH SY 125.0 178 6 $322.00 53.6 $ 17,272.06 - 51 HOT-MX ASPHALT PAVEMENT PATCH WITH CONCRETE BASE(IDOT).12-INCH SY 300.0 n.9 5391.00 222.1 $ 86,85283 52 PCC PAVEMENT REMOVAL SY 64.0 37.7 $20.70 26.3 $ 544.41 53 PCC PAVEMENT PATCH,8-INCH SY 64.0 29.2-8276.00 34.8_$ 9.604.80 54 PCC DRIVEWAY REMOVAL SY 105.0 117 6 $14.38 12.8 $ 184.50 55 PCC DRIVEWAY REPLACEMENT SY 105.0 134 7 $276.00 29.7 $ 8,208.24 56 HMA DRIVEWAY REMOVAL SY 75.0. 34 $14.38 40.8 $ 583.11 57 HMA DRIVEWAY REPLACEMENT SY 75.0 49 $230.00 25.3 $ 5,819.00 58 SEED AND BLANKET SY 2350.0 4764' $12.85 2414.7 $ 30,545.32 59 THERMOPLASTIC PAVEMENT MARKING,4-INCH IF 70.0 0.0 $11.50 70.0 $ 805.00 60 THERMOPLASTIC PAVEMENT MARING,6-INCH LF 90.0 0.0 $17.25 90.0 $ 1,552.50 61 THERMOPLASTIC PAVEMENT MARKING,24-INCH LF 24.0 00 S46.00 24.0 $ 1,104.00 62 THERMOPLASTIC PAVEMENT MARKING.LETTERS AND SYMBOLS SY 24.0 0 0 $57.50 24.0 $ 1,380.00 63 DETECTOR LOOP,TYPE 1 LF ' 55.0 0 0 $63.25 55.0 S 3.478.75 PAGE 1 OF 2 CHANGE ORDER NO.1 AND ANAL YEAR 3 LEAD SERVICE LINE REPLACEMENT PROGRAM-CONTRACT A CITY OF ELGIN ITEM NO. ITEMS UNIT CONTRACT ADJUSTED UNIT PRICE ADDITIONS DEDUCTIONS QUANTITY QUANTITY QUANTITY COST QUANTITY COST 64 NON-SPECIAL,NONHAZARDOUS SOIL WASTE DISPOSAL TON 315.0 5 $40.00 154.6 $ 8,184.80 65 TRAFFIC CONTROL AND PROTECTION LS 1.0 1.0 $387,921.79 66 TRAFFIC CONTROL AND PROTECTION(IDOT) EACH 28.0 28.0 $1,035.00 67 DUST CONTROL-MECHANICAL SWEEPING EACH 10.0 3 0 $920.00 7.0 $ 6.440.00 68 ALLOWANCE-ITEMS ORDERED BY THE ENGINEER LS 30000.0 0 0 $1.00 30000.0 $ 30,000.00 69 EXPLORATORY EXCAVATION EACH 5.0 1 0 $1,233.75 4.0 $ 4,935.00 70 CONNECTION TO EXISTING WATER MAIN,6-INCH EACH 10.0 9.0 $4,935.00 1.0 $ 4,935.00 71 CONNECTION TO EXISTING WATER MAIN.8-INCH EACH 3.0 0.0 $4,935.00 3.0 $ 14,805.00 72 SANITARY SEWER,8-INCH,PVC C900 LF 30.0 68 5 $287.67 38.5 $ 11,075.30 73 WATER MAIN PROTECTION,16-INCH LF 262.0 57 0 $175.25 205.0 $ 35,926.25 74 WATER SERVICE PIPE,D.I.P.6-INCH LF 75.0 101 5 $280.34 26.5 $ 7,429.01 75 WATER MAIN.CLASS 52,WITH POLYETHYLENE WRAP.8-INCH LF 4821.0 5301.0 $129.53 480.0 $ 62,174.40 , 76 MECHANICAL JOINT FITTINGS LB 6239.0 6677 0 $0.01 438.0 $ 4.38 77 GATE VALVE(RESIDENT SEAT)IN 60-VAULT,6-INCH EACH 2.0 2.0 $7,036.22 78 GATE VALVE(RESILIENT SEAT)IN 60'VAULT,8-INCH EACH 16.0 18.0 $7,827.10 20_$ 15,654.20 79 VALVE VAULT ABANDONMENT ' EACH ' 18.0 15 0 $493.50 3.0 $ 1,480.50 80 FIRE HYDRANT ASSEMBLY,WITH AUXIUARY VALVE,6-INCH MJ EACH 19.0 16.0 $9,547.56 3.0 $ 28,642.68 81 FIRE HYDRANT REMOVAL EACH 5.0 6 0 $1,233.75 1.0 $ 1233.75 82 WATER MAIN TESTING AND DISINFECTION LS 1.0 1.0 $7,360.00 83 DISCONNECT AND ABANDON EXISTING WATER MAIN EACH 11.0 9.0 $1,974.00 20 $ 3,948.00 84 AGGREGATE SHOULDERS,TYPE SY 800.0 3000 $19.55 500.0 $ 9,775.00 85 FOUNDATION MATERIAL CY 50.0 0.0 $51.75 50.0 $ 2,587.50 88 DETECTABLE WARNING PANEL SF 34.0 28 0 $57.50 6.0 $ 345.00 ALTERNATE A-DIRECTIONAL DRILL STA.60+35 TO 64+80 LF 445.0 340.0 $24275 105.0$ 25,488.75 C01-1 HO,.1. X ASPHALT PAVEMENT PATCH.5-INCH(AUP=$73 00/SYI SY 312.6 $i3 00 3128 $ 22.816.15 CO1-2 TEMPORARY BINDER.3-INCH(AUP=547.00/SY) SY 219.1 $47 00 2191. $ 10,298.17 C01-3 HOT-MIX ASPHALT PAVEMENT PATCH.4-INCH(AUP=560.20/SY) SY 4310.6 $60.20 4310 6 $ 259A96.92 C01-4 16-x8"PRESSURE CONNECTION(AUP=$21,900 00/EACH) =ACH 2.0 $21.900 00 2 0 $ 43,800 00 C01.5 HOT-MIX ASPHALT PAVEMENT PATCH W/PCC BASE,16-INCH($307.001SY SY 95.6 $307.00 95 0 $ 29.149.65 COI-6 AT&T DUCT CROSSING AT CRYSTALIWING(T&M) LS 1,0 $3 277.34 1.0 $ 3,277.34 C01-7 12"PVC WATER MAIN QUALITY STORM SEWER($98.00/LF) LF 278 0 $98.00 278.0'$ 27.244,00 C01-8 12"DIP STORM SEWER($507 OO/LF) IF 34.0 $507 00 34 0 $ 17,238.00 C01-9 WATER MAIN I ISCONNECTS ON WING ST.(AUP=$11,041.06IEACHI EACH 2 0 $11 041.06 2.0 S 22,082,12 CO1-10 WATER SERVICE CONNECTION AT MAIN,1 5-INCH(AUP=$5,700 00/EACH EACH' 1 0 $5.700.00 1.0 $ 5,700.00 C01-11 WATER SERVICE INSTALLATION.TYPE K.1 5-INCH(AUP=$47.98/LF) LF 117 0 $47 98 117 0 $ 5.61366 C01-12 PCC TEMP PATCH.2'(AUP=5802.66/EACH) EACH 17 0 $80266 17 0 $ 13,64522 C01-13 WASTE MANAGEMENT DISPOSAL CREDIT TO THE CITY(11/18/24) LS 1 0 $9.617.24 1 0 S (9.61724). COI-14 WASTE MANAGEMENT DISPOSAL CREDIT TO THE CITY 08/01125 LS 1 0 $2,395.83 1.0 $ 2.395,83 OTALADDITION-= 1,232,814.j% TOTAL DEDUCTIONS= $(1,141,605.65) ORIGINAL CONTRACT PRICE: $4,548,923.75 CURRENT CONTRACT PRICE ADJUSTED BY PREVIOUS CHANGE ORDER(S): $4.54,9,923.75 AMOUNT OF CURRENT CHANGE ORDER: $ 91,038.37 FINAL CONTRACT PRICE: $4`699,93212 PAGE 2 OF 2