HomeMy WebLinkAbout25-12 Resolution No. 25-12 RESOLUTION AUTHORIZING EXECUTION OF A CHANGE ORDER NO. 1 WITH F.H. PASCHEN FOR HEMMENS EQUIPMENT ENCLOSURE JOB ORDER CONTRACT WHEREAS, the City of Elgin has heretofore entered into a contract F.H. Paschen for Hemmens equipment enclosure job order contract; and WHEREAS,it is necessary and desirable to modify the terms of the contract as is described in Change Order No. 1 attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN,ILLINOIS,that Richard G. Kozal,City Manager,be and is hereby authorized and directed to execute Change Order No. 1, a copy of which is attached hereto and made a part hereof by reference. s/David J. Kaptain David J. Kaptain, Mayor Presented: January 22, 2025 Adopted: January 22, 2025 Omnibus Vote: Yeas: 9 Nays: 0 Attest: s/Kimberly Dewis Kimberly Dewis, City Clerk o�- OFf(c., f City of Elgin Change Order �..t „ If ELGIN,ILLINOIS PROJECT M00230 CHANGE ORDER No. 1 CONTRACT: Hemmens Equipment Enclosure-Job Order Contract SCOPE: Modify enclosure footprint to meet environmental and local code requirements. Provide addi- tional excavation and construction services for completion. REASONS FOR CHANGE: Revisions to the original site plan were made necessary due to environ- mental and code requirements. These changes to the enclosure moved the walls for easier access by staff to the equipment for required service. The move of the walls were also made necessary due to the prox- imity of the walls to surrounding utilities in the area. The move of the walls required additional excava- tion and larger footings to be poured. • The circumstances said to necessitate the change in performance were not reasonably foreseeable at the time the contract was signed • The change is germane to the original contract as signed • The change order is in the best interests of the City of Elgin and authorized by law SUMMARY OF CHANGES IN CONTRACT AMOUNT: ORIGINAL CONTRACT AMOUNT: $88,808.91 CHANGE ORDER No. 1 Make modifications to enclosure walls ADD $45,982.88 TOTAL FOR CHANGE ORDER NO. 1: ADD $45,982.88 TOTAL REVISED CONTRACT AMOUNT: $134,791.79 The original amount of the contract with F.H. Paschen is$88,808.91. Change Order No. 1 will increase the original contract amount by a total of$45,982.88, that sum representing 51% of the original contract amount.The new contract amount,inclusive of all change orders is$134,791.79. OTHER CONTRACT PROVISIONS: All other contract provisions remain the same. CHANGE ORDER No. 1 Agreed to this 22 day of January ,2025. Recommended by: Building Maintenance Department By: Glen Dettman Title: Interim Superintendentnt Date: - / P Signature: Accepted by: F.H.Paschen Party of the Second Part(Contractor) By:Josh Curran Title:Vice President Date: 1/3/2025 D.FH .. by .m Oran-JosMs a..ctuae. dam Signature: 1 t ra 1• °° A�JY15 N n 2•1 1 ➢R Approved by: CITY OF ELGIN Party of the First Part(Owner) By: Richard G. Kozal Title: City Manager Date: Jan 2025 Signature: