Loading...
HomeMy WebLinkAbout25-110 Resolution No. 25-110 RESOLUTION AUTHORIZING EXECUTION OF A CHANGE ORDER NO. 1 WITH UPLAND DESIGN, LTD. FOR THE RENOVATION OF WING PARK WHEREAS, the City of Elgin has heretofore entered into a contract Upland Design, Ltd. for the renovation of Wing Park; and WHEREAS,it is necessary and desirable to modify the terms of the contract as is described in Change Order No. 1 attached hereto; and WHEREAS,that pursuant to Elgin Municipal Code Section 5.02.020B(9)the City Council hereby finds that an exception to the requirements of the procurement ordinance is necessary and in the best interest of the city; and NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN,ILLINOIS,that Richard G.Kozal,City Manager,be and is hereby authorized and directed to execute Change Order No. 1, a copy of which is attached hereto and made a part hereof by reference. s/David J. Kaptain David J. Kaptain, Mayor Presented: June 11, 2025 Adopted: June 11, 2025 Omnibus Vote: Yeas: 9 Nays: 0 Attest: s/Kimberly Dewis Kimberly Dewis, City Clerk \.0 OF 1, .+� , City of Elgin Change Order ELGIN,ILLINOIS PROJECT: WING PARK MASTER PLAN& INCLUSIVE PLAYGROUND CHANGE ORDER No. 1 CONTRACT: Agreement with Upland Design,Ltd. For Professional Services in Connection with the Renovation of Wing park SCOPE: To allow for the consultant to survey additional areas in Wing Park at the Elgin Classic Little League complex which require paving improvements to comply with ADA standards, as well as complete design services including drafting construction drawings and a cost estimate; and to allow for the consultant to develop two concepts and cost estimates for the renovation of existing park restroom facilities near the proposed inclusive playground renovation site. REASONS FOR CHANGE: After the signing of the original agreement, during the early de- sign and planning stages of this project, additional work was identified which was not anticipated at the time the project was originally bid. The circumstances said to necessitate this change in the work were not reasonably foreseeable at the time the contract was signed.The change is germane to the original contract as signed. This change order is in the best interests of the City of Elgin and authorized by law SUMMARY OF CHANGES IN CONTRACT AMOUNT: This will be an increase to the original contract. ORIGINAL CONTRACT AMOUNT: $355,740.00 CHANGE ORDER No. l ADD $29,850.00 TOTAL REVISED CONTRACT AMOUNT: $385,590.00 The original amount of the contract with Upland Design Ltd. was $355,740.00. Change Order No. 1 totaling $29,850.00 will increase the original contract amount by a total of$29,850.00 that sum representing 8.4%of the original contract amount. The new contract amount, inclusive of all change orders is$385,590.00. OTHER CONTRACT PROVISIONS: All other contract provisions remain the same. CHANGE ORDER No. 1 Agreed to this 11 day of _Iune ,2025. Recommended by: Parks and Recreation Department By: Greg Hulke Title: Parks and Facilities Superintendent Date: 5/30/25 Signature: ' v Accepted by: Upland Design Ltd. Party of the Second Part(Contractor) By: Michelle A.Kelly Title: President Date: May 30,2025 Signature: )17?---eAlf iialt• Approved by: CITY OF ELGIN Party of the First Part(Owner) By:Richard G. Kozal Title:Cit\ Manager Date: Ju 025 Signature:L L� Legal Dept\Agreernent\Change Order-I-Wing Park Master Plan&Inclusive Playground-Clean-5-22-25.doc