HomeMy WebLinkAbout24-66 Resolution No. 24-66 RESOLUTION AUTHORIZING EXECUTION OF A CHANGE ORDER NO. 1 AND FINAL WITH F.H. PASCHEN, S.N. NIELSON & ASSOCIATES, LLC FOR THE LORDS PARK PAVILION EXTERIOR REPAIRS WHEREAS, the City of Elgin has heretofore entered into a contract F.H. Paschen, S.N. Nielson & Associates, LLC for the Lords Park pavilion exterior repairs; and WHEREAS,it is necessary and desirable to modify the terms of the contract as is described in Change Order No. 1 and Final attached hereto. NOW,THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS,that Richard G. Kozal,City Manager,be and is hereby authorized and directed to execute Change Order No. 1 and Final, a copy of which is attached hereto and made a part hereof by reference. s/David J. Kaptain David J. Kaptain, Mayor Presented: March 6, 2024 Adopted: March 6, 2024 Omnibus Vote: Yeas: 9 Nays: 0 Attest: s/Kimberly Dewis Kimberly Dewis, City Clerk :14�f ye Change Order City of Elgin ELGIN,ILLINOIS PROJECT: M00184 CHANGE ORDER No. I AND FINAL CONTRACT: Lords Park Pavilion Exterior Repairs—Job Order Contract SCOPE: Replace rotted wood structure as needed in various areas that were not known at the time of the bid.The conditions requiring repairs developed as a result of unknown conditions that could not be reasonably foreseen at the time of the bid.These conditions were verified by City staff and charged on a time and material basis. REASONS FOR CHANGE: Since the replacement necessitating these changes in the scope of work were not planned, the circumstances said to necessitate the change in performance were not reasonably foreseeable at the time the contract was signed. The change is germane to the original contract as signed and the change order is in the best interests of the City of Elgin and authorized by law. SUMMARY OF CHANGES IN CONTRACT AMOUNT: ORIGINAL CONTRACT AMOUNT: $830,303.00 Replacement of additional rotted wood structure as detailed in the attached JOC proposal TOTAL FOR CHANGE ORDER NO. 1 AND FINAL: ADD$101,695.97 TOTAL OF PREVIOUS CHANGE ORDERS: N/A TOTAL REVISED CONTRACT AMOUNT: $931,998.97 The original amount of the contract with F.H. Paschen, S.N. Nielson&Associates, LLC, is $830,303.00. Change Order No. 1 and Final will increase the original contract amount by a total of $101,695.97, that sum representing twelve and two tenths percent(12.2%)of the original contract amount. The new contract amount, inclusive of all change orders, is$931,998.97. OTHER CONTRACT PROVISIONS: All other contract provisions remain the same. CHANGE ORDER NUMBER 1 AND FINAL Agreed to this 6th th day of March,2024. Recommended by: Building Maintenance Department By: Rich Iloke Title: Building Maintenance Superintendent Date: ?A/ 20.77 (...... _......07---e_....„.,...... Signature: Accepted by: F.H. Paschen,S.N. Nielson & Associates, LLC Party of the Second Part (Contractor) By: Josh Curran Title: Vice President Date: 2I2of Signature: Approved by: CITY OF ELGIN Party of the First Part(Owner) By: Richard G. Kozal Title: City Manager Date: Marc 4 Signature: legal Ikpt\AgrecnrcniChangc Oder No I and Final-I'.11 Paschen-lords Pat(Pavilion I:xlcrior Repairs-Clean-2-20-24.docx