HomeMy WebLinkAbout24-49 Resolution No. 24-49 RESOLUTION AUTHORIZING EXECUTION OF A CHANGE ORDER NO. 1 WITH RAY'S ELECTRICAL SERVICE LLC AND TOM'S PLUMBING INC. FOR THE YEAR 2 LEAD SERVICE LINE REPLACEMENT PROGRAM—CONTRACT D (BID NO. 23-014) WHEREAS, the City of Elgin has heretofore entered into a contract with Ray's Electrical Service LLC and Tom's Plumbing Inc. for the Year 2 Lead Service Line Replacement Program — Contract D (Bid No. 23-014); and WHEREAS,it is necessary and desirable to modify the terms of the contract as is described in Change Order No. 1 attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN,ILLINOIS,that Richard G.Kozal,City Manager,be and is hereby authorized and directed to execute Change Order No. 1, a copy of which is attached hereto and made a part hereof by reference. s/David J. Kaptain David J. Kaptain, Mayor Presented: February 28, 2024 Adopted: February 28, 2024 Omnibus Vote: Yeas: 7 Nays: 0 Attest: s/Kimberly Dewis Kimberly Dewis, City Clerk fVo5�� City of Elgin Change Order 114•f Of U t`Cy ELGIN, ILLINOIS PROJECT# Bid No. 23-014 CHANGE ORDER No. I CONTRACT: Year 2 Lead Service Line Replacement Program- Contract D (Emergency Repairs) (Bid No. 23-014) SCOPE: The Year 2 Lead Service Line Replacement Program - Contract D project objective was to replace lead service lines on an as-needed basis when a leak was identified by the City on a lead water service line. The scope of work called for the awarded contractor(joint venture between Ray's Electrical Service and Tom's Plumbing) to respond to a lead service line in need of replacement within 20 days of receiving notice from the City. The project included replacing water service lines on public and private property (with a signed Temporary Construction Easement agreement from the homeowner). The total original contract amount is $884,973.00. REASONS FOR CHANGE: The Year 2 Emergency Repairs - Contract D states the work involves the replacement of up to 60 lead service lines, and that the contract will remain in force for 365 calendar days (May 2, 2024) or until 60 lead service lines are replaced, whichever comes first. As of February 12, 2024, Ray's and Tom's have replaced 45 lead service lines and will continue to replace up to 60 services or until May 2, 2024. To ensure that the City has a lead service line emergency repair contractor in place until the Year 3 emergency repair contract can be approved, it is in the best interest of the City to modify the existing contract such that the contractors will continue to replace lead service date through the completion date of 365 calendar days (May 2, 2024), regardless of the number of service lines that have been replaced, up to the contract amount. The circumstances said to necessitate the change in performance were not reasonably foreseeable at the time the contract was signed; the change is germane to the original contract as signed; and the change order is in the best interests of the City of Elgin and is authorized by law. SUMMARY OF CHANGES IN CONTRACT TIME AND WORK: ORIGINAL CONTRACT COMPLETION DATE: The contract will remain in force for 365 calendar days or until 60 lead service lines arc replaced, whichever comes first. ORIGINAL CONTRACT AMOUNT: $884,973.00 CHANGE ORDER NO. I REMOVE "or until 60 lead service lines are replaced, whichever comes first" and revise the work such that more than 60 lead service lines may be replaced, up to the contract amount. TOTAL FOR CHANGE ORDER NO. I: REMOVE "or until 60 lead service lines are replaced, whichever comes first" and revise the work such that more than 60 lead service lines may be replaced, up to the contract amount. PREVIOUS CHANGE ORDER(S): Change Order No. N/A N/A TOTAL OF PREVIOUS CHANGE ORDERS: N/A TOTAL REVISED CONTRACT COMPLETION DATE: May 2"d, 2024 TOTAL REVISED CONTRACT AMOUNT: $884,973.00 The original completion date of the contract with Ray's Electrical and Tom's and Tom's Plumbing is May 2, 2024, or until 60 lead service lines are replaced, whichever comes first. Change Order No. 1 will remove the maximum number of services to be replaced and keep the completion date of 365 calendar days(May 2, 2024), up to the contract amount. OTHER CONTRACT PROVISIONS: All other contract provisions remain the same. CHANGE ORDER No. 2 !INSERT DATE FROM COW MEMO] Agreed to this 28 day of_ Febru -, 2024. Recommended by: Water Department By: Nora Bertram Title: Water Dir �ector Date: ZI Z, Signature: — ! / , — — - - — Engineering Enterprises, Inc. Party of the Second Part(Engineer) By: Julie A.Morrison,P.E. Title: Vice President 2/22/24 Date: __ Signature Accepted by: Ray's Electrical Service LLC (Joint Venture) Party of the Second Part t((Co/ntractor) By: L ;c a JQLIv�a�� Title: }'11 Ur► 6 Ole"AA_ Date: -- Signature: _ Tom's Plumbing Inc.(Joint Venture) Party of the Second Part(Contractor) ' ,A CAr Title: Date: -ZZ - ZJ Signature: Approved by: CITY OF ELGIN Party of the First Part(Owner) By: Richard G. Kozal Title: City Manager - _ Date: Febr >2024 Signature: _ _