Loading...
HomeMy WebLinkAbout24-48 Resolution No. 24-48 RESOLUTION AUTHORIZING EXECUTION OF A CHANGE ORDER NO. 1 WITH JOEL KENNEDY CONSTRUCTION CORP FOR THE YEAR 2 LEAD SERVICE LINE REPLACEMENT PROGRAM—CONTRACT A (BID NO. 23-001) WHEREAS, the City of Elgin has heretofore entered into a contract with Joel Kennedy Construction Corp for the Year 2 Lead Service Line Replacement Program—Contract A (Bid No. 23-001); and WHEREAS,it is necessary and desirable to modify the terms of the contract as is described in Change Order No. 1 attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN,ILLINOIS,that Richard G. Kozal,City Manager,be and is hereby authorized and directed to execute Change Order No. 1, a copy of which is attached hereto and made a part hereof by reference. s/David J. Kaptain David J. Kaptain, Mayor Presented: February 28, 2024 Adopted: February 28, 2024 Omnibus Vote: Yeas: 7 Nays: 0 Attest: s/Kimberly Dewis Kimberly Dewis, City Clerk ` Of f�C� ` `a City of Elgin Change Order ELGIN, ILLINOIS PROJECT 23-001 CHANGE ORDER No. l CONTRACT: Year 2 Lead Service Line Replacement—Contract A(Bid No. 23-001) SCOPE:The above-referenced project has been substantially completed and the majority of final contract quantities are known. A change order is required to balance out all but one finalized contract item to match actual quantities and to document a reduction in the final contract amount. REASONS FOR CHANGE: • The final contract quantities under the contract said to necessitate this change order were not reasonably foreseeable at the time the contract was signed. • The changes provided in this change order are germane to the original contract as signed. • The change order is in the best interest of the City of Elgin and authorized by law. SUMMARY OF CHANGES IN CONTRACT AMOUNT: ORIGINAL CONTRACT AMOUNT: $6,452,155.00 CHANGE ORDER NO. 1 SEE ATTACHMENT TOTAL FOR CHANGE ORDER NO. 1. SUBTRACT $2,102,581.40 PREVIOUS CHANGE ORDER(S): None TOTAL REVISED CONTRACT AMOUNT: $4,349,573.60 The original amount of the contract with Joel Kennedy Construction Corp is$6,452,155.00.Change Order No. l will decrease the contract amount by a total of$2,102,581.40, that sum representing 32.6% of the original contract amount. The revised contract amount inclusive of all change orders is$4,349,573.60. OTHER CONTRACT PROVISIONS: All other contract provisions remain the same. CHANGE ORDER No. 1 Agreed to this 28 day of Februa __ , 2024. Recommended by: Water Department By: Nora Bertram Title: Water r Director v`Date: f Z1 f 9 1 Signature: . Engineering Enterpris . Party of the Second Part(Engineer) By: Julie A.Morrison,P.E. Title: Vice President/Principal Date: 2/21/24 t y� Signature: :1411:4C a+4ww34•-- Accepted by: Joel Kennedy Construction Corp Party of the Second Part(Contractor) BY: `Te rrL 1 .10 1 Title: Date: Signature: Approved by: CITY OF ELGIN Party of the First Part(Owner) By: Richard G.Kozal Title: City Manager Date: Fe• . 8,2024 4:i / >" "a"." Signature: i Legal Dept1Agreement\Change Order No.1-LSLR Contract A-Joel Kennedy Construction-Clean-2-9-24.docx