HomeMy WebLinkAbout24-282 Resolution No. 24-282
RESOLUTION
AUTHORIZING EXECUTION OF AN AGREEMENT WITH FEHR GRAHAM AND
ASSOCIATES, LLC FOR PROFESSIONAL SERVICES IN CONNECTION WITH THE 2025
VARIOUS STREETS RESURFACING PROJECT
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS,
that pursuant to Elgin Municipal Code Section 5.02.020B(9)the City Council hereby finds that an
exception to the requirements of the procurement ordinance is necessary and in the best interest of
the city; and
BE IT FURTHER RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN,
ILLINOIS, that Richard G. Kozal, City Manager, and Kimberly A. Dewis, City Clerk, be and are
hereby authorized and directed to execute an Agreement on behalf of the City of Elgin with Fehr
Graham and Associates, LLC,for professional services in connection with the 2025 various streets
resurfacing project, a copy of which is attached hereto and made a part hereof by reference.
s/David J. Kaptain
David J. Kaptain, Mayor
Presented: December 18, 2024
Adopted: December 18, 2024
Omnibus Vote: Yeas: 9 Nays: 0
Attest:
s/Kimberly Dewis
Kimberly Dewis, City Clerk
AGREEMENT
THIS AGREEMENT is made and entered into this 18 day of December, 2024,by and
between the CITY OF ELGIN, an Illinois municipal corporation (hereinafter referred to as
"CITY")and Fehr Graham and Associates,LLC,an Illinois limited liability company(hereinafter
referred to as"ENGINEER").
WHEREAS, the CITY desires to engage the ENGINEER to furnish certain professional
services in connection with 2025 Various Streets Resurfacing Project (hereinafter referred to as
the"PROJECT"); and
WHEREAS, the ENGINEER represents that it is in compliance with Illinois Statutes
relating to professional registration of individuals and has the necessary expertise and experience
to furnish such services upon the terms and conditions set forth herein below.
NOW, THEREFORE, it is hereby agreed by and between the CITY and the ENGINEER
that the CITY does hereby retain the ENGINEER for and in consideration of the mutual promises
and covenants contained herein, the sufficiency of which is hereby acknowledged to act for and
represent it in the engineering matters involved in the PROJECT as described herein, subject to
the following terms and conditions and stipulations,to-wit:
1. SCOPE OF SERVICES
A. All work hereunder shall be performed under the direction of the Director of Public
Services of the CITY, herein after referred to as the"DIRECTOR".
B. The Scope of Services for this PROJECT shall include providing design
engineering services for the roadway improvements associated with the PROJECT
including milling and resurfacing of existing pavement, roadway patching,
sidewalk removal and replacement,curb and gutter removal and replacement,ADA
improvements,miscellaneous improvements as may be required,the completion of
documentation required by IDOT for an MFT construction section project,
coordination with IDOT, including but not limited to the review and approval of
necessary documentation and PROJECT plans and specifications,and coordination
with the City's Purchasing Department to advertise the PROJECT for bidding.
C. A detailed Scope of Services for the PROJECT is attached hereto as Attachment A,
and incorporated into this Agreement by this reference. A manhour estimate is
included as Attachment C and incorporated into this Agreement by this reference.
D. An exhibit presenting the Proposed Project Locations for the PROJECT is attached
hereto as Attachment D, and incorporated into this Agreement by this reference.
2. PROGRESS REPORTS
A. An outline project milestone schedule is provided hereinunder.
a. Design Services Notice to Proceed—December 20,2024
b. Begin Field Data Collection—December 2024
c. Begin Design Engineering—January 2025
d. Submit 75%Progress Set to IDOT/City Staff for Review—February 2025
e. Address City/IDOT Comments and Finalize Bid Documents—March 2025
f. Advertise Project for Bidding—April 2025
g. Open Bids—May 2025
h. Award Construction Contract and Begin Construction—June 2025
i. Construction Completion—October 2025
B. A detailed project schedule for the PROJECT is included as Attachment B,attached
hereto, and incorporated into this Agreement by this reference. Progress will be
recorded on the project schedule and submitted monthly as a component of the
Status Report described in C below.
C. The ENGINEER will submit to the DIRECTOR monthly a status report keyed to
the project schedule. A brief narrative will be provided identifying progress,
findings and outstanding issues.
3. WORK PRODUCTS
All work product prepared by the ENGINEER pursuant hereto including, but not limited to,
reports, plans, designs, calculations, work drawings, studies, photographs, models and
recommendations shall be the property of the CITY and shall be delivered to the CITY upon
request of the DIRECTOR; provided, however, that the ENGINEER may retain copies of such
work product for its records. ENGINEER'S execution of this Agreement shall constitute
ENGINEER'S conveyance and assignment of all right,title and interest, including but not limited
to any copyright interest, by the ENGINEER to the CITY of all such work product prepared by
the ENGINEER pursuant to this Agreement. The CITY shall have the right either on its own or
through such other engineers as determined by the CITY to utilize and/or amend such work
product. Any such amendment to such work product shall be at the sole risk of the CITY. Such
work product is not intended or represented to be suitable for reuse by the CITY on any extension
to the PROJECT or on any other project, and such reuse shall be at the sole risk of the CITY
without liability or legal exposure to the ENGINEER.
4. PAYMENTS TO THE ENGINEER(Not To Exceed Method)
A. For services provided the ENGINEER shall be paid at the rate of 3.3 times the direct
hourly rate of personnel employed on this PROJECT, with the total fee not to
exceed$174,000 regardless of the actual costs incurred by the ENGINEER unless
substantial modifications to the scope of the work are authorized in writing by the
DIRECTOR, and approved by way of written amendment to this Agreement
executed by the parties.
B. For outside services provided by other firms or subconsultants,the CITY shall pay
the ENGINEER the invoiced fee to the ENGINEER,plus 5%. The cost of any such
-2 -
outside services is included within the total not-to-exceed amount of $174,000
provided for in Section 4A above.
C. The cost of any such reimbursable expenses is included within the total not-to-
exceed amount of$174,000 provided for in Section 4A above.
D. The CITY shall make periodic payments to the ENGINEER based upon actual
progress within 30 days after receipt and approval of invoice. Said periodic
payments to the ENGINEER shall not exceed the amounts shown in the following
schedule, and full payments for each task shall not be made until the task is
completed and accepted by the DIRECTOR.
Date Estimated% Estimated Value of Estimated
Completion Work Completed Invoice Value
12/29/2024 15% $26,100 $26,100
1/26/2025 25% $43,500 $69,600
2/23/2025 25% $43,500 $113,100
3/29/2025 15% $26,100 $139,200
4/26/2025 10% $17,400 $156,600
5/24/2025 5% $8,700 $165,300
6/28/2025 5% $8,700 $174,000
5. INVOICES
A. The ENGINEER shall submit invoices in a format approved by the CITY. Progress
reports(2C above)will be included with all payment requests.
B. The ENGINEER shall maintain records showing actual time devoted and cost
incurred. The ENGINEER shall permit the authorized representative of the CITY
to inspect and audit all data and records of the ENGINEER for work done under
this Agreement. The ENGINEER shall make these records available at reasonable
times during the Agreement period, and for a year after termination of this
Agreement.
6. TERMINATION OF AGREEMENT
Notwithstanding any other provision hereof,the CITY may terminate this Agreement at any time
upon fifteen(15)days prior written notice to the ENGINEER. In the event that this Agreement is
so terminated, the ENGINEER shall be paid for services actually performed and reimbursable
expenses actually incurred prior to termination, except that reimbursement shall not exceed the
task amounts set forth under section 4 above.
7. TERM
-3 -
This Agreement shall become effective as of the date the ENGINEER is given a notice to proceed
and, unless terminated for cause or pursuant to section 6, shall be deemed concluded on the date
the CITY determines that all of the ENGINEER's work under this Agreement is completed. A
determination of completion shall not constitute a waiver of any rights or claims which the CITY
may have or thereafter acquire with respect to any term or provision of the Agreement.
8. NOTICE OF CLAIM
If the ENGINEER wishes to make a claim for additional compensation as a result of action taken
by the CITY,the ENGINEER shall give written notice of his claim within 15 days after occurrence
of such action. No claim for additional compensation shall be valid unless so made. Any changes
in the ENGINEER's fee shall be valid only to the extent that such changes are included in writing
signed by the CITY and the ENGINEER. Regardless of the decision of the DIRECTOR relative
to a claim submitted by the ENGINEER, all work required under this Agreement as determined
by the DIRECTOR shall proceed without interruption.
9. BREACH OF CONTRACT
If either party violates or breaches any term of this Agreement, such violation or breach shall be
deemed to constitute a default, and the other party has the right to seek such administrative,
contractual or legal remedies as may be suitable to the violation or breach; and, in addition, if
either party,by reason of any default,fails within fifteen(15)days after notice thereof by the other
party to comply with the conditions of the Agreement, the other party may terminate this
Agreement. Notwithstanding the foregoing, or anything else to the contrary in this Agreement,
with the sole exception of an action to recover the monies the CITY has agreed to pay to the
ENGINEER pursuant to section 4 hereof, no action shall be commenced by the ENGINEER
against the CITY for monetary damages. ENGINEER hereby further waives any and all claims or
rights to interest on money claimed to be due pursuant to this Agreement, and waives any and all
such rights to interest which it claims it may otherwise be entitled pursuant to law, including,but
not limited to,the Local Government Prompt Payment Act(50 ILCS 501/1, et seq.), as amended,
or the Illinois Interest Act(815 ILCS 205/1,et seq.),as amended. The parties hereto further agree
that any action by the ENGINEER arising out of this Agreement must be filed within one year of
the date the alleged cause of action arose or the same will be time-barred. The provisions of this
section shall survive any expiration,completion and/or termination of this Agreement.
10. INDEMNIFICATION
To the fullest extent permitted by law,ENGINEER agrees to and shall indemnify,defend and hold
harmless the CITY,its officers, employees,agents,boards and commissions from and against any
and all claims, suits,judgments, costs, attorneys fees, damages or other relief, including but not
limited to workers compensation claims, in any way resulting from or arising out of negligent
actions or omissions of the ENGINEER in connection herewith,including negligence or omissions
of employees or agents of the ENGINEER arising out of the performance of this Agreement. In
the event of any action against the CITY, its officers,employees, agents, boards or commissions,
covered by the foregoing duty to indemnify, defend and hold harmless such action shall be
-4-
defended by legal counsel of the CITY's choosing. The provisions of this section shall survive any
expiration and/or termination of this Agreement.
11. NO PERSONAL LIABILITY
No official, director, officer, agent or employee of the CITY shall be charged personally or held
contractually liable under any term or provision of this Agreement or because of their execution,
approval or attempted execution of this Agreement.
12. INSURANCE
The ENGINEER shall provide, maintain and pay for during the term of this Agreement the
following types and amounts of insurance:
A. Comprehensive Liability. A policy of comprehensive general liability insurance
with limits of at least $1,000,000 aggregate for bodily injury and $1,000,000
aggregate for property damage.
The ENGINEER shall deliver to the DIRECTOR a Certification of Insurance
naming the CITY as additional insured. The policy shall not be modified or
terminated without thirty(30)days prior written notice to the DIRECTOR.
The Certificate of Insurance which shall include Contractual obligation assumed by
the ENGINEER under Article 10 entitled "Indemnification" shall be provided.
This insurance shall apply as primary insurance with respect to any other insurance
or self-insurance programs afforded to the CITY. There shall be no endorsement
or modification of this insurance to make it excess over other available insurance,
alternatively,if the insurance states that it is excess or prorated,it shall be endorsed
to be primary with respect to the CITY.
B. Comprehensive Automobile Liability. Comprehensive Automobile Liability
Insurance covering all owned, non-owned and hired motor vehicles with limits of
not less than$500,000 per occurrence for damage to property.
C. Combined Single Limit Policy. The requirements for insurance coverage for the
general liability and auto exposures may be met with a combined single limit of
$1,000,000 per occurrence subject to a$1,000,000 aggregate.
D. Professional Liability. The ENGINEER shall carry Engineers Professional
Liability Insurance Covering claims resulting from error, omissions or negligent
acts with a combined single limit of not less than $1,000,000 per occurrence. A
Certificate of Insurance shall be submitted to the DIRECTOR as evidence of
insurance protection. The policy shall not be modified or terminated without thirty
(30)days prior written notice to the DIRECTOR.
-5 -
13. CONSTRUCTION MEANS. METHODS. TECHNIQUES. SEQUENCESS
PROCEDURES AND SAFETY
The ENGINEER shall not have control over or charge of and shall not be responsible for
construction means, methods, techniques, sequences or procedures, or for safety precautions and
programs in connection with the construction, unless specifically identified in the Scope of
Services.
14. NONDISCRIMINATION/AFFIRMATIVE ACTION
The ENGINEER will not discriminate against any employer or applicant for employment because
of race,color,religion,sex,national origin,age,ancestry,order of protection status,familial status,
marital status, physical or mental disability, military status, sexual orientation, or unfavorable
discharge from military service which would not interfere with the efficient performance of the
job in question. ENGINEER shall take affirmative action to comply with the provisions of Elgin
Municipal Code Section 5.02.040 and will require any subcontractor to submit to the CITY a
written commitment to comply with those provisions. ENGINEER shall distribute copies of this
commitment to all persons who participate in recruitment, screening,referral and selection of job
applicants and prospective subcontractors. ENGINEER agrees that the provisions of Section
5.02.040 of the Elgin Municipal Code, 1976,as amended, is hereby incorporated by reference, as
if set out verbatim.
No person shall be denied or subjected to discrimination in receipt of the benefit of any services
or activities made possible by or resulting from this Agreement on the grounds of race, color,
religion,sex,national origin,age,ancestry,order of protection status,familial status,marital status,
physical or mental disability, military status, sexual orientation, or unfavorable discharge from
military service.
Any violation of this paragraph shall be considered a violation of a material provision of this
Agreement and shall be grounds for cancellation, termination or suspension, in whole or in part,
of the Agreement by the CITY.
15. ASSIGNMENT AND SUCCESSORS
This Agreement and each and every portion thereof shall be binding upon the successors and the
assigns of the parties hereto; provided, however, that no assignment shall be made without the
prior written consent of the CITY.
16. DELEGATIONS AND SUBCONTRACTORS
Any assignment,delegation or subcontracting shall be subject to all the terms,conditions and other
provisions of this Agreement and the ENGINEER shall remain liable to the CITY with respect to
each and every item,condition and other provision hereof to the same extent that the ENGINEER
would have been obligated if it had done the work itself and no assignment, delegation or
subcontract had been made. Any proposed subcontractor shall require the CITY's advanced
written approval.
-6-
17. NO CO-PARTNERSHIP OR AGENCY
This Agreement shall not be construed so as to create a partnership,joint venture. employment or
other agency relationship between the parties hereto.
18. SEVERABILITY
The parties intend and agreed that, if any section,sub-section,phrase,clause or other provision of
this Agreement, or any portion thereof, shall be held to be void or otherwise unenforceable, all
other portions of this Agreement shall remain in full force and effect.
19. HEADINGS
The headings of the several sections of this Agreement are inserted only as a matter of convenience
and for reference and in no way are they intended to define,limit or describe the scope of intent of
any provision of this Agreement,nor shall they be construed to affect in any manner the terms and
provisions hereof or the interpretation or construction thereof.
20. MODIFICATION OR AMENDMENT
This Agreement and its attachments constitutes the entire Agreement of the parties on the subject
matter hereof and may not be changed, modified, discharged or extended except by written
amendment duly executed by the parties. Each party agrees that no representations or warranties
shall be binding upon the other party unless expressed in writing herein or in a duly executed
amendment hereof,or change order as herein provided.
21. APPLICABLE LAW
This Agreement shall be deemed to have been made in, and shall be construed in accordance with
the laws of the State of Illinois.Venue for the resolution of any disputes or the enforcement of any
rights pursuant to this Agreement shall be in the Circuit Court of Kane County, Illinois.
22. NEWS RELEASES
The ENGINEER may not issue any news releases without prior approval from the DIRECTOR,
nor will the ENGINEER make public proposals developed under this Agreement without prior
written approval from the DIRECTOR prior to said documentation becoming matters of public
record.
23. COOPERATION WITH OTHER CONSULTANTS
The ENGINEER shall cooperate with any other consultants in the CITY's employ or any work
associated with the PROJECT.
24. INTERFERENCE WITH PUBLIC CONTRACTING
- 7-
The ENGINEER certifies hereby that it is not barred from bidding on this contract as a result of a
violation of 720 ILCS 5/33E et seq. or any similar state or federal statute regarding bid rigging.
25. SEXUAL HARASSMENT
As a condition of this contract,the ENGINEER shall have written sexual harassment policies that
include, at a minimum, the following information:
A. the illegality of sexual harassment;
B. the definition of sexual harassment under state law;
C. a description of sexual harassment,utilizing examples;
D. the vendor's internal complaint process including penalties;
E. the legal recourse, investigative and complaint process available through the
Illinois Department of Human Rights, and the Illinois Human Rights Commission;
F. directions on how to contact the department and commission;
G. protection against retaliation as provided by Section 6-101 of the Human Rights
Act.
A copy of the policies shall be provided by ENGINEER to the Department of Human Rights upon
request(775 ILCS 5/2-105).
26. SUBSTANCE ABUSE PROGRAM.
As a condition of this agreement, ENGINEER shall have in place a written substance abuse
prevention program which meets or exceeds the program requirements in the Substance Abuse
Prevention Public Works Project Act at 820 ILCS 265/1 et seq. A copy of such policy shall be
provided to the DIRECTOR prior to the entry into and execution of this agreement.
27. WRITTEN COMMUNICATIONS
All recommendations and other communications by the ENGINEER to the DIRECTOR and to
other participants which may affect cost or time of completion, shall be made or confirmed in
writing. The DIRECTOR may also require other recommendations and communications by the
ENGINEER be made or confirmed in writing.
28. NOTICES
All notices, reports and documents required under this Agreement shall be in writing and shall be
mailed by First Class Mail,postage prepaid, addressed as follows:
-8 -
A. As to CITY: B. As to ENGINEER:
Mike Pubentz, P.E. Jason Stoll, P.E.
Public Services Director Principal
City of Elgin Fehr Graham and Associates,LLC
150 Dexter Court 515 Lincoln Highway
Elgin, Illinois60120-5555 Rochelle, IL 61086
29. COMPLIANCE WITH LAWS
Notwithstanding any other provision of this Agreement it is expressly agreed and understood that
in connection with the performance of this Agreement that the ENGINEER shall comply with all
applicable Federal, State, City and other requirements of law, including, but not limited to, any
applicable requirements regarding prevailing wages, minimum wage, workplace safety and legal
status of employees. Without limiting the foregoing,ENGINEER hereby certifies, represents and
warrants to the CITY that all ENGINEER'S employees and/or agents who will be providing
products and/or services with respect to this Agreement shall be legally authorized to work in the
United States. ENGINEER shall also at its expense secure all permits and licenses,pay all charges
and fees and give all notices necessary and incident to the due and lawful prosecution of the work,
and/or the products and/or services to be provided for in this Agreement. The CITY shall have the
right to audit any records in the possession or control of the ENGINEER to determine
ENGINEER'S compliance with the provisions of this section. In the event the CITY proceeds
with such an audit the ENGINEER shall make available to the CITY the ENGINEER'S relevant
records at no cost to the CITY. ENGINEER shall pay any and all costs associated with any such
audit.
30. COUNTERPARTS AND EXECUTION
This Agreement may be executed in counterparts, each of which shall be an original and all of
which shall constitute one and the same agreement. This Agreement may be executed
electronically, and any signed copy of this Agreement transmitted by facsimile machine or email
shall be treated in all manners and respects as an original document. The signature of any party
on a copy of this Agreement transmitted by facsimile machine or email shall be considered for
these purposes an original signature and shall have the same legal effect as an original signature.
IN WITNESS WHEREOF, the parties hereto have entered into and executed this
Agreement effective as of the date and year first written above.
FOR THE Y: FOR THE ENGINEER:
B B
y City Manager y
- 9 -
Name/Print: Jason T. Stoll, PE
Title: Principal
Attest.
City Cl rk
- 10-
FE___ H R G RA:AM
ENGINEERING&ENVIRONMENTAL
ATTACHMENT A
November 20,2024
Mike Pubentz,P.E.
Community Services Director
City of Elgin
1900 Holmes Rd.
Elgin, IL 60123-1200
Re: Proposal for Professional Engineering Services
City of Elgin-2025 Various Streets Resurfacing Project
Dear Mike,
Fehr Graham is pleased to provide professional engineering services for the City of Elgin's 2025
Various Streets Resurfacing Project,which will address the following locations in need of repair:
Maroon Drive: From Mariner Drive to Shales Parkway
Inverness Drive: From Thorndale Drive to Thoreau Drive
Thoreau Drive: From Maroon Drive to Concord Drive
Shales Parkway: From Maroon Drive to IL 19/Chicago Street
Anderson Avenue: From Willard Avenue to Slader Avenue
Includes new HMA design for existing aggregate street
Bent Street:from Willard Avenue to Village Street
West termini is approximately 115 feet west of Willard at the structure
Esmeralda Court: Bounded by North Grove Road,Slade Street, Brock Street and Lincoln
Avenue
Bluff City Cemetery Phase III Streets
The scope of work also includes carryover projects previously designed by Fehr Graham (2024):
Highlands Golf Course Parking Lot(West)
Fire Station No.5 Parking Lot
Wing Park Band Shell Parking Lot
Bluff City Cemetery Phase II Streets
See location maps,Attachment D,for project locations.
SCOPE OF SERVICES
Fehr Graham will provide the City of Elgin with the following services:
Phase I Engineering Services
Fehr Graham will complete a review and analysis of all existing streets and parking lots included in
the project scope identified above.The review and analysis will include:
Topographic surveys of intersections targeted for Americans with Disabilities Act (ADA)
ramp improvements(46 ramps estimated).
Pavement cores at regular intervals along streets and within parking lots (52 pavement
515 Lincoln Highway Rochelle,IL 61068 p:815 562.9087 f:815 562.4233 fehrgraham.com
November 20,2024
Mike Pubentz, City of Elgin Community Services Director
Proposal for professional engineering services
Page 2
cores are expected to be taken).
Field surveys to note/mark areas of sidewalk and curb replacements. Isolated areas of base
failure will be noted for design purposes.
Manhole inspections and a report documenting findings (50 structures estimated).
Coordination meetings with the City of Elgin (4 virtual meetings).
Pavement design for Anderson Avenue will be completed in compliance with Bureau of
Local Roads & Streets (BLRS) Manual Chapter 46 Pavement Rehabilitation following Local
Agency Structural Overlay Policy (LASO).
The City will be provided with a summary memo complete with recommendations for the scope of
improvements. The summary memo will document findings for ADA replacements, pavement
design(s), and manhole inspection results with corresponding recommendations for rehabilitation
and/or replacement. Recommendations for improvements will be supported based on inspections,
including field pavement cores and other field observations.
Phase II Engineering Services (PS&E)
Design Engineering will include the development of a single bid package used for bidding and
construction purposes.The design will be for a Motor Fuel Tax (MFT) construction section project
with all deliverables and coordination with the Illinois Department of Transportation (IDOT) District
1 necessary to obtain approvals for work included in our scope of work.The bid package will consist
of the following:
BLR 09110- Resolution for Improvement Under the Illinois Highway Code
BLR 12200- Local Public Agency Formal Contract Proposal
BLR 12201 -Schedule of Prices
BLR 12230- Local Public Agency Proposal Bid Bond
BLR 12320- Local Public Agency Formal Contract
BLR 12310-Contractor's Bulletin Request for Advertisement
BLR 12321 - Contract Bond
BLR 12325 -Apprenticeship and Training Program Certification
BLR 12326-Affidavit of Illinois Business Office
BLR 11300-Check Sheet for Recurring Special Provisions
BLR 11310- Project-specific special provisions
Check Sheet for Supplemental Specifications and Recurring Special Provisions
Bureau of Design and Environment (BDE) Special Provisions
BLRS Special Provisions
Material Specifications
District 1 Special Provisions
City of Elgin Special Provisions
City of Elgin Ordinances or Resolutions
Wage Rates
Permits
Attachments as needed
Engineering plans that meet requirements and standards of IDOT District 1 construction section
requirements and will be based on the topographic surveys collected as part of Phase I efforts.
Engineering plans will include the following:
November 20,2024
Mike Pubentz,City of Elgin Community Services Director
Proposal for professional engineering services
Page 3
Cover Sheet.
General Notes and List IDOT Highway Standards.
Typical Pavement Sections.
Schedules/Summary of Quantities.
Horizontal and Vertical Controls.
Plan and Profile Sheets for Roadway Resurfacing/Reconstruction design.
Wing Park Band Shell Parking Lot Plan including provisions and design for drainage
improvements.
Bluff City Cemetery Improvements plans, Phases II and III as per approved planning
documents.
ADA Ramp Grading and Layout Plans.
Traffic Staging/Detour Plans
Cross Sections(as needed).
District One Details.
Project Details.
Other engineering services as part of Phase II efforts will include:
BLR 11510—Contract Estimate of Cost.
BDE 220a—Estimate of Time.
BLR 12315-Tabulation of bids and recommendation for award to the City of Elgin.
Coordination with IDOT District 1 for approval of the scope of work in accordance with MFT
construction section requirements.
Coordination of bidders/City, publishing addenda, and bid procurement.This includes
advertising costs and implementing Requests for Interpretation(RFI).
EXCLUSIONS
The following items are not included in the scope of services proposed here:
Boundary/Right-of-Way(ROW)for all project locations. ROW will be shown for reference
based on Geographic Information System(GIS).
Traffic Studies.
Intersection Design Studies.
Traffic Signal Improvements.
Environmental Site Review(ESR), Preliminary Environmental Site Assessment(PESA),
Preliminary Site Investigation(PSI),and other environmental studies/services
Archeologic Surveys.
National Pollutant Discharge Elimination System (NPDES) permitting and erosion control
inspections.
Utility improvements, including water/wastewater/stormwater improvements not
specifically identified above.
Phase III Construction engineering services.
FEES
Based upon the information available,we will complete the scope of services,as outlined in this
proposal,on a time and materials basis for the not-to-exceed (NTE)fee of$174,000 as per the
breakdown below and as provided in Attachment C.
November 20,2024
Mike Pubentz,City of Elgin Community Services Director
Proposal for professional engineering services
Page 4
2025 Various Streets $157,167
Bluff City Cemetery Phase III $16,833
SCHEDULE
Fehr Graham can initiate this project immediately upon receipt of formal authorization to proceed.
The expectation is that work will be completed in 2025 for a spring/early summer bid letting date.
AUTHORIZATION
I trust that the information we have provided is in line with your expectations. If you would like us
to proceed with this project, please execute the attached Agreement for Professional Services and
return a copy to my attention.
Sincerely,
Jaso toll,PE
Principal
JTS:sjm
25-134
N\Proposals\2024\lason Stoll\Elgin,City of\2025 Streets\Attachment A-Elgin-2025 Various Streets Resurfacing.docx
F EHRGR/JAM
ENGINEERING&ENVIRONMENTAL
ATTACHMENT B
PROJECT SCHEDULE
ELGIN 2025 VARIOUS STREETS PROJECT
11/18/2024
a LE E>v w > > ., > a+c > E
v Q 2 2 a,Task o „ Q p o i
z 0
,
Design Services Notice to Proceed(December 2,2024) Y3
Begin Field Data Collection(December 2024)
Design Engineering(Begin January 2025)
Submit Phase I Engineering Report to City(February 2025)
Submit 75%Design to IDOT/City Staff for Review(March 2025) _ __
Address City/IDOT Comments and Finalize Bid Documents(April 2025) _
Advertise Project for Bidding(May 2025)
Open Bids(June 2025)
Award -
Construction Contract and Begin Construction(July 2025) #allar
Construction Completion(October 2025)
11/2012024 ATTACHMENT C
Project Name:City of Elgin-2025 Streets GM Program-Elgin,IL
Project a:2s-13a MANHOUR ESTIMATE
Fee Type:T8M not to exceed
Client Project Estimate
Prepared by:J.Stoll
QA'ed by:J.Dove
RUMMY CAD CAD CAD
Engineering Senor Project Project Survey Engineering
ROW ID PHASES.TASKS AND MILESTONES Principal 1 Engineer 4 Technician 4 Engineering Administrator Manager 3 Technician 1 Technician 4 HOURS
Technician 4 3
1 00 2026 Venous Streets
1 01 !DOT Permitting 8 0 4 0 12 0
102 Field MeasuremeMs'Surveys/Pavement Cores 2 0 80 0 2 C 92 0 176 0
103 Manhole Inspections/Report(50 Structures Estimated) 8 C 40 0 9 C 40 0 96.0
_ 1 04 Tope Surveys for ADA Designs 32 0 32 0
1 06 Engineering Plans 40^_ 80 0 120 0
1 06 OuarMltlas/EOPC 40 3 40 0
1 07 BLR Forms.Special Prolnsans 12 C 32 0 _C 50.0
1 08 ADA Designs 46 0 92 0 138 0
109 Pavement Design-Anderson Avenue 2 0 8 0 2 0 12 0
1 10 QAOC 14 0 14 0
SUM SUMMARY 16.0 124.0 2.0 192.0 20.0 0.0 0.0 0.0 0.0 0.0 164.0 172.0 0.0 0.0 690.0
2 00 Bluff City Cemetery Phase Ill
2.01 Field Measurements/Surveys/Pavement Cores 2.0 8 0 2 0 12.0
2 02 Engmeenng Plans 8 0 16 0 24 0
2.03 Ouant4les/EOPC 4 0 24 0 28 0
2.04 BLR Forms.Special Provisions 2 C 4 0 8 0
2.05 OAOC 2 0 2 0
206 00
2.07 0 0
2.08 0.0
209 00
2 10 00
SUM SUMMARY 2.0 16.0 0.0 12.0 2.0 0.0 0.0 00 0.0 0.0 0.0 40.0 0.0 0.0 72.0
300 Bidding
3.01 Coordination with Purchasing 4 0 4 0
3.02 RFrs 8 0 8.0
3.03 Bid Openmg 0 0
3.04 Bid Tab/Recommendation Letter 8 0 8 0
3.06 Contracts Fecrldatan 2 0 2 0
3.06 OAIQC 2 0 2 0
_ 3.07 0 0
3.06 0 0
3.09 0 0
310 00
SUM SUMMARY 2.0 8.0 0.0 0.0 14.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 24.0
4.00 Project Management and Administration
4 01 Coordination Meetings(4) 4 0 4.0 8 0
4 02 PM.Coordination and Scheduling 190 0 100 0
403 00
4.04 0 0
405 00
4.06 0 0
_4.07 00
408 00
409 00
4 10 0.0
SUM SUMMARY 4 0 0.0 0.0 0.0 0,0 104.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 104.0
5.00 Insert Phase Name
5.01 0 0
5.02 0 0
503 00
604 00
505 00
506 00
5.07 00
5.06 0.0
5.09 0 0
5IC 00
7-SUM SUMMARY 0.0 0.0 0.0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8.00 Insert Phase Name
Sl/*0024 4.34 PM 0 0
ATTACHMENT C
MANHOUR ESTIMATE
Project#: 25-134 Project Name: City of Elgin-2025 Streets GM Program-Elgin,IL
Summary
5400 5050
Revenue Labor Hours Direct Labor$ Other DE$ Equip$ Ralmb Eap RNmb Cons Total Comp
1.00 2025 Various Streets HI BEFORE CONTINGENCY 690.0 $ 77,596 $ - 5 7,254 $ 7,254 5 28.750 $ 113,600
.CONTINGENCY 138.0 $ 15.856 5 5 • 5 • $ $ 15,856
FEE WITH CONTINGENCY 828.0 5 93,452 5 $ 7,254 5 7,254 S 28,750 $ 129,456
2.00 Bluff COY Cemetery Phase III FEE BEFORE CONTINGENCY 72.0 $ 8,736 5 5 600 $ 600 $ 5,750 $ 15,086
.CONTINGENCY 14.4 $ 1,747 5 • $ - $ - $ $ 1,747
FEE WITH CONTINGENCY 86.4 5 10,483 5 • 5 600 5 600 5 5.750 $ 16,833
3.00 Blddmg FEE BEFORE CONTINGENCY 24.0 5 2,916 5 • $ • S S - 5 2.916
•CONTINGENCY 4.8 5 583 5 - 5 - $ - 5 • 5 583
FEE WITH CONTINGENCY 28.8 $ 3,499 5 S - $ - $ - $ 3.499
4,00 Project Management and Admmrstr45on FEE BEFORE CONTINGENCY 108.0 $ 20,176 $ - 5 - $ $ 5 20,176
.CONTINGENCY 21.6 $ 4,035 5 - 5 • $ $ - 5 4,035
FEE WITN CONTINGENCY 1296 $ 24,211 5 - 5 - 5 - $ 5 24,21E
TOTAL FEE BEFORE CONTINGENCY 894.0 $ 109,424 $ - $ 7,854 $ 7,854 $ 34,500 $ 151,778
4.CONTINGENCY 178.8 $ 22,222 5 - S - 5 - $ - $ 22,222
FEE WITH CONTINGENCY 1072.8 $ 131,646 $ - $ 7,854 5 7,854 5 34,500 $ 174,000
/ N
WING PARK BAND SHELL
PARKING LOT
SEE SHEET 10
ESMERELDA CT
SEE SHEET 7
4e/-
14,
SUMMIT ST
2
9
HIGH D AVE11
BODE RD
TA
_ SHALES PKWY
ANDERSON AVE E cH� SEE SHEET 4
SEE SHEET 5
wilu.
FIRE STATION NO.5
MAROON DR
°P SEE SHEET 9 SEE SHEET
• 2
y44
BENT ST
SEE SHEET 6 INVERNESS DR
SEE SHEET 2
HIGHLANDS GOLF
COURSE WEST LOT U.S.GRANT MEMORIAL HIGHWAY/US 20
SEE SHEET 8 THOREAU DR
C CITY SEE SHEET 3
CEMETERY
"'la-
SEE SHEET 11
ATTACHMENT D N 1 1/20/24,
PROJECT LOCATION MAPS w E 1 FEHR GRAHAtI
ILDNOIS
IOWA
SHEET 1 N.T.S. ENGINEERING&ENVIRONMENTAL WISCONSIN
`G:Cao 25 s-12\o0 Streets\Exhaa 14p,GWERMI u3105 DEMON f118.1 P . 184-0135 J
" 4 2024 FEHR GRAHAM
i 1
do
I2
O MAROON DR
F
O13
I
ce c i
INVERNESS DR 0 a
r N
w I
Z
O In
I
H
N tW E
0
S 11/2O/24
ATTACHMENT D 200 0 200 FEET" 1
F
��� aRmutta I OWA
PROJECT LOCATION MAPS 1--I E
wNOIS
SHEET 2 GRAPHIC SCALE IN FEET lows
ENGINEERING&ENVIRONMENTAL WISCONSIN
`C: ID 2r 5-12\Elgin so-/Oa\Exhb& Ldp.WROON&INVE V uia Mal
al nr NO. 104-ooxin 1
' 2024 FEHR GRAHAM
/ 1
O�
�O
O
GOO O�
O� Off' I
O�
THOREAU DR �Q-
SHALES PKWY
NAe
cnez
rn
ATTACH M ENT D 200 0 200 FEET. 11/12/24
GRAHAM
IwNOIs 1
PROJECT LOCATION MAPS EFEHR
SHEET 3 GRAPHIC SCALE IN FEET IOWA
asks ENGINEERING&ENVIRONMENTAL wiSCONSIN
c:C3D +fir Elsie Street E h& t.e q.ngEiv.� ` LUMPS DENON Mar No. ,e.-ooa.2s
,' 2024 FEHR GRAHAM
/
O2
�O
r
C)
0
0
SHALES PKWy N+
A
ATTACHMENT D
200 0 200 FEET/ 11/20/24,
PROJECT LOCATION MAPS I-1 FEHR aRAHAr4 ILLJNOIS
SHEET 4 GRAPHIC SCALE IN FEET IOWA
ENGINEERING&ENVIRONMENTAL WISCONSIN
G:C3D\2S s-12\DO Strsels\E it t.ap.SHALES ` LIMOS DESIGN FM NO. ,e.-0on»
" 2024 FEHR GRAHAM
I
w ANDERSON AVE Q
Q
o ct
vi
N
W E
S
ATTACHMENT D
100 0 100 FEET 11/20/24,
PROJECT LOCATION MAPS I-i I 1 FEHR IwNOIs
SHEET 5 GRAPHIC SCALE IN FEET IOWA
ENGINEERING& ENVIRONMENTAL wISCONSIN
C: 94De5, S a\o¢n Sseea\EAM 1A.y.ANDERSON a ioo DEMON MI w. ,e.-owets
J
2024 FEHR GRAHAM
i
W
sr
BENT ST
N
W A E
S ATTACHMENT D 100 0 11/20/24
100 FEET
PROJECT LOCATION MAPS �-� I ► , FEHR GRAHAtI ILLJNOIs
SHEET 6 GRAPHIC SCALE IN FEET Iowa
ENGINEERING&ENVIRONMENTAL WISCONSIN
\4103 25\S-1 Y\Ogin Sreeb\Edit I.d.g.BENT WOOS OMNI mu M0.164-003525
")10/i 2024 FEHR GRAHAM
r 1
SLADE AVE
1
Mb
WI •
KJ P
o C o
o
o X
m
N
W E
A
S
100 0 100 FEET
I—+ r--i I I
GRAPHIC SCALE IN FEET
ATTACHMENT D 11/20/24
PROJECT LOCATION MAPS_ FEHR GRAHAM 'w"o's
SHEET 7 UNCOLN AVE ' OA
ENGINEERING&ENVIRONMENTAL wisCoNsiw
.C t0\25�"S1-12\EIpn Streele\Erhibtl 1.61,ES ERELDA ullas oesni FM NO.134-033525
2024 FEHR GRAHAM
p l
SPORTS WAY
N
W E
S 11/20/24
ATTACHMENT D 100 0 10o FEET
PROJECT LOCATION MAPS I--I FEHR GRAHAM
iwNois
SHEET 8 GRAPHIC SCALE IN FEET sown
ENGINEERING&ENVIRONMENTAL WISCONSIN
` ACJD\25\S-t2\El¢+Streets\EAait IA%mots*rEsr Isa canoe CCM'Mad w. 1s4-0035¢5
W.T " '9/2' 2024 FEHR GRAHAM
i
OLIVE ST
C---(j
a
FIRE STATION
NO. 5
11444
S`T
N
W ���A E
S ATTACH M ENT D 100 0 100 FEET
PROJECT LOCATION MAPS I-I I--1 ► FEHR GRAHAM
�W 1/20/24
W 1A
SHEET 9 GRAPHIC SCALE IN FEET sown
ENGINEERING&ENVIRONMENTAL WISCONSIN
N...ib
c:� D\ s-t2\oQa N n strb\Eithbt 1.e.9.FRESO /s woe o FL .,2024 FEHR NO.
GRAHAM
i
WING PARK
BAND SHELL
PARKING LOT
N
W � E
S 11/20/24
ATTAC H M ENT D 100 0 100 FEETr
PROJECT LOCATION MAPS 1---1 E---a t I FEHR GRARAt4
IwNOIS
SHEET 10 GRAPHIC SCALE IN FEET IOWA
ENGINEERING&ENVIRONMENTAL WISCONSIN
`G:\C3O\25\5-12\Elgin Struts\Exh t 1.ft%INK PARK PARIOG LOT ` L OIS usCw FM NO. te4-a4tlYJ
aa:++ +a✓x` 2024 FEHR GRAHAM
/ 1
•f. w .
r - , ,'
t
R -• it r .
BLUFF CITY BLVD . -
' PEARL AVE w
I b11.1
FAIRLAWN AVE j
BLUFF CITY
CEMETERY
lit
DELL AVE
evR
R
-10,\ 49/:: ::i
kip
te
'lit i Y
C 0
7NIII
HILL AVE-
J
SPRING GROVE AVE
N
W- E
S 11/20/24
ATTAC H M ENT D 300 0 300 FEET 1
PROJECT LOCATION MAPS 1--I F--i 1 1 FEHRGRMIAMILuNOIs
SHEET 11 GRAPHIC SCALE IN FEET IOWA
ENGINEERING&ENVIRONMENTAL WISCONSIN
c:C3D S—T2\E]Qn Str.W\E 14.9.BWFF CITY CEIETEAY tII D nem No.
. 1e.-oo
` J 2024 FEHR GRAHAM