Loading...
HomeMy WebLinkAbout24-246 Resolution No. 24-246 RESOLUTION AUTHORIZING EXECUTION OF A CHANGE ORDER NO. 1 AND FINAL WITH F.H. PASCHEN FOR PUBLIC WORKS FLEET DIVISION EPDXY FLOOR REPLACEMENT JOB ORDER CONTRACT WHEREAS,the City of Elgin has heretofore entered into a contract F.H. Paschen for public works fleet division epoxy floor replacement job order contract; and WHEREAS, it is necessary and desirable to modify the terms of the contract as is described in Change Order No. 1 and Final attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS,that Richard G.Kozal,City Manager,be and is hereby authorized and directed to execute Change Order No. 1 and Final, a copy of which is attached hereto and made a part hereof by reference. s/David J. Kaptain David J. Kaptain, Mayor Presented: November 6, 2024 Adopted: November 6, 2024 Omnibus Vote: Yeas: 9 Nays: 0 Attest: s/ Kimberly Dewis Kimberly Dewis, City Clerk `-. OL f•C,guyak � `� Change Order City of Elgin ELGIN,ILLINOIS PROJECT M00214 CHANGE ORDER No. 1 AND FINAL CONTRACT: Public Works Fleet Division Epoxy Floor Replacement—Job Order Contract SCOPE: Apply necessary additional epoxy priming to mitigate moisture found in the concrete. REASONS FOR CHANGE: When the fleet floor was prepped for the new epoxy flooring per the original contract,high moisture levels were discovered in the concrete. This change order allows for the addition of a necessary moisture control epoxy primer. This additional step is necessary to maintain the warranty of the new coating. The circumstances said to necessitate the change in performance were not reasonably foreseeable at the time the contract was signed. The change is germane to the original con- tract as signed. The change order is in the best interests of the City of Elgin and authorized by law. SUMMARY OF CHANGES IN CONTRACT AMOUNT: ORIGINAL CONTRACT AMOUNT: $271,000.25 CHANGE ORDER NO. 1 and Final: Furnish and apply(1)coat of Sika 1620—a moisture vapor control epoxy primer to floor prior to epoxy flooring as detailed in the attached JOC proposal ADD $62,200.00 TOTAL FOR CHANGE ORDER NO. 1 and Final ADD $62,200.00 TOTAL REVISED CONTRACT AMOUNT: $333,200.25 The original amount of the contract with F.H. Paschen is$271,000.25. Change Order No. 1 and Final will increase the original contract amount by a total of$62,200.00,that sum represents 22.95%of the original contract amount. The new contract amount,inclusive of all change orders,is$333,200.25 OTHER CONTRACT PROVISIONS: All other contract provisions remain the same. CHANGE ORDER No. 1 AND FINAL Agreed to this 6 day of November, 2024 Recommended by: Building Maintenance Department By: Glen Dettman Title: Interim Building Maintenance Superintendent Date: /opAv Signature: Accepted by: F.H.Paschen Party of the Second Part(Contractor) By: Josh Curran Title: Vice President Date: 10/10/24 Ott eroJc4toue CArr4n.(PM a.w Signature: Ds.:2024.10.10123 A47-0700 Approved by: CITY OF ELGIN Party of the First Part(Owner) By: Richard Kozal Title: Ci Date: Signature: November 6,2024 Legal Dept\AgreemcnttChange Order No I and Final-I-FH Paschen-Epoxy Floor-PW Fleet Div-Clean-10.9-24.doc ri ? September 25, 2024 City of Elgin 151 Douglas Avenue Elgin, IL 60120 Attn: Glen Dettman RE: Elgin Public Works Epoxy—Change Order Request#001 Moisture Prime Coat Dear Mr. Dettman, F.H. Paschen has visited the project site with City of Elgin and agreed to the following scope of work. We are pleased to present the following scope of work for your review. Scope of Work • Furnish and apply(1)coat of Sika 1620-a moisture vapor control epoxy primer to floor prior to epoxy flooring. The budgeted cost to furnish and install the above referenced work is Sixty-Two Thousand Two Hundred Dollars,$62,200.00 Clarifications • This proposal includes using the National Cooperative Purchasing Alliance(NCPA)Agreement,Contract #04-27 and includes the associated fees. • This proposal excludes permit fees. • This proposal excludes the removal and disposal of any hazardous material. • This proposal excludes any unforeseen conditions that may arise. • This proposal excludes any overtime or premium time,proposal is based on normal work hours. • This proposal excludes any payment and performance bonds. • This proposal excludes any winter conditions. • This proposal excludes sales tax. • This proposal excludes any site restoration. • This proposal excludes any repair,replacement,or re-location of piping underground. • This proposal excludes any furniture movement. • This proposal includes only the following items described in the above scope. F.H.PASCHEN,S.N.NIELSEN&ASSOCIATES LLC F.H. PASCHEN 5515 N.East River Road,Chicago, IL 60656 p.773.444 3474 f.773.693.0064 I www.thpaschen.com rim? Please review this information at your earliest possible convenience and advise us as to how you wish to proceed. All required documents will be submitted at your request. If you have any questions or concerns,please do not hesitate to call. City of Elgin Date Dawtel Dual 09/25/2024 F.H.Paschen,S.N.Nielsen&Associates,LLC Date