Loading...
HomeMy WebLinkAbout24-230 Resolution No. 24-230 RESOLUTION AUTHORIZING EXECUTION OF A CHANGE ORDER NO. 1 WITH BEAR CONSTRUCTION COMPANY FOR THE DUPAGE COURT REVITALIZATION (Bid No. 23-039) WHEREAS, the City of Elgin has heretofore entered into a contract Bear Construction Company for the DuPage Court revitalization (Bid No. 23-039); and WHEREAS,it is necessary and desirable to modify the terms of the contract as is described in Change Order No. 1 attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN,ILLINOIS,that Richard G. Kozal,City Manager,be and is hereby authorized and directed to execute Change Order No. 1, a copy of which is attached hereto and made a part hereof by reference. s/David J. Kaptain David J. Kaptain, Mayor Presented: October 9, 2024 Adopted: October 9, 2024 Omnibus Vote: Yeas: 8 Nays: 0 Attest: s/Kimberly Dewis Kimberly Dewis, City Clerk `�0 ., O F E,c�� y° ° City of Elgin Change Order ELGIN,ILLINOIS PROJECT 030203 CHANGE ORDER No. 1 CONTRACT:DuPage Court Revitalization(Bid No. 23-039) SCOPE: This change order is required to cover the overages related to the steel arch redesign and install both the arch and pylons at DuPage Court as well as to cover the additional overages related to the additional eighteen-inch sanitary main replacement to achieve the necessary pitch for correct flow. REASONS FOR CHANGE: During construction an underground vault was discovered that necessitated the redesign of the arch. It was also discovered that an eighteen-inch sanitary main had to be removed and replaced. The circumstances said to necessitate the change in performance were not reasonably foreseeable at the time the contract was signed;the change is germane to the original contract as signed;and the change order is in the best interests of the City of Elgin and is authorized by law. SUMMARY OF CHANGES IN CONTRACT AMOUNT: This will be an increase to the original contract in cost only. ORIGINAL CONTRACT AMOUNT: $2,836,963.00 CHANGE ORDER No. 1 Arch redesign $4,019.40 Arch installation and remobilization $22,062.60 Additional 18"sanitary main replacement $13,586.37 TOTAL FOR CHANGE ORDER NO. 1: ADD $39,668.37 TOTAL REVISED CONTRACT AMOUNT: $2,876,631.37 The original amount of the contract with Bear Construction Company is 2,836,963.Change Order No. 1 totaling $39,668.37 will increase the original contract amount by a total of $39,668.37, that sum representing one point four percent (1.4%) of the original contract amount. The new contract amount, inclusive of all change orders is$2,876,631.37. OTHER CONTRACT PROVISIONS:All other contract provisions remain the same. CHANGE ORDER No.1 Agreed to this 9 day of October ,2024. Recommended by: Department of Cultural Arts&Special Events By:_Amanda Harris Title: DCASE Director Date:_September 17,2024 �� . Signature: Accepted by: Bear Construction Company Party of the Second Part(Contractor) By: Dan Zivilik Title: Project Executive Date: 10/02/24 Signature: .- . Approved by: CITY OF ELGIN Party of the First Part(Owner) By:Richard G.Kozal Title:City Manager Date: Octo 024 Signature: