Loading...
HomeMy WebLinkAbout24-23 Resolution No. 24-23 RESOLUTION AUTHORIZING EXECUTION OF A CHANGE ORDER NO. 1 WITH LANDWORKS, LTD. FOR MILLENNIUM PARK RENOVATIONS (Bid No. 23-048) WHEREAS,the City of Elgin has heretofore entered into a contract with Landworks, Ltd. for Millennium Park renovations(Bid No. 23-048); and WHEREAS,it is necessary and desirable to modify the terms of the contract as is described in Change Order No. 1 attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN,ILLINOIS,that Richard G.Kozal,City Manager,be and is hereby authorized and directed to execute Change Order No. 1, a copy of which is attached hereto and made a part hereof by reference. s/David J. Kaptain David J. Kaptain, Mayor Presented: January 24, 2024 Adopted: January 24, 2024 Vote: Yeas: 8 Nays: 1 Attest: s/Kimberly Dewis Kimberly Dewis, City Clerk OF f(Ci ti geltir!' City of Elgin Change Chan Order L. ELGIN, ILLINOIS PROJECT CHANGE ORDER No. I CONTRACT: City of Elgin and Landworks lid. Contract for Millennium Park Renovations (Bid No. 23-048) SCOPE: The change order adds $120,286 to the Millennium Park Renovations contract to allow for the installation of an artificial turf play surface instead of the originally contracted mulch play surface. The specifications for the artificial turf play surface are provided in Attachment A attached hereto and made a part hereof. REASONS FOR CHANGE: • At the initial signing of the contract the scope of work was for a mulch play surface. This has been changed to requiring an artificial turf play surface after initial construction meetings. • The change is germane to the original contract as signed. • The change order is in the best interest of the City of Elgin and authorized by law. SUMMARY OF CHANGES IN CONTRACT AMOUNT: The contract is being increased by $120,286. This will allow the contractor to schedule and install an artificial turf play surface as part of the Millennium Park renovation. ORIGINAL CONTRACT AMOUNT: $379,438 CHANGE ORDER No. 1 Funding for artificial turf play surface installation at Millennium Park S120,286 TOTAL FOR CHANGE ORDER NO. 1 ADI) $120,286 TOTAL REVISED CONTRACT AMOUNT: $499,724 The original amount of the contract with Landworks Ltd. is $379,438. Change Order No. 1 will increase the original contract amount by a total of$120,286 that sum representing 31.7 percent of the original contract amount. The new contract amount, inclusive of all change orders is$499,724. OTHER CONTRACT PROVISIONS: All other contract provisions remain the same. Recommended by: Parks and Recreation By: Greg Hulke Title: Parks and Facilities Superintendent Date: /////Zo Signature: 1/ 4 Accepted by: LANDWORKS, LTD. Party of the Second Part (Contractor) By: Gabriel Pizzuto Title: Director of Operations Date: January 16, 2024 Signature: ,a.- 4-1-4.21/),(17 Approved by: CITY OF ELGIN Party of the First Part(Owner) By: Richard G. Kozal Title: City Manager Date: Januar , 2024 ••d Signature: Legal Dept\Agreemcnt\Change Order I-Landworks-Bid 23-048-Millennium Park-Clean-10-31-23.doc