HomeMy WebLinkAbout24-182 Resolution No. 24-182 RESOLUTION AUTHORIZING EXECUTION OF A CHANGE ORDER NO. 1 AND FINAL WITH ALLIANCE CONTRACTORS, INC. FOR THE 2024 BRIDGE REHABILITATION PROJECT (BID NO. 23-036A) WHEREAS, the City of Elgin has heretofore entered into a contract with Alliance Contractors, Inc. for the 2024 bridge rehabilitation project(Bid No. 23-036A); and WHEREAS,it is necessary and desirable to modify the terms of the contract as is described in Change Order No. 1 and Final attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN,ILLINOIS,that Richard G. Kozal,City Manager,be and is hereby authorized and directed to execute Change Order No. 1 and Final, a copy of which is attached hereto and made a part hereof by reference. s/ David J. Kaptain David J. Kaptain, Mayor Presented: August 14, 2024 Adopted: August 14, 2024 Omnibus Vote: Yeas: 8 Nays: 0 Attest: s/ Kimberly Dewis Kimberly Dewis, City Clerk OF fCi_ City of Elgin Change Order ELGIN, ILLINOIS PROJECT: Elgin Project No. 339996 CHANGE ORDER No. 1 AND FINAL CONTRACT: 2024 Bridge Rehabilitation Project Rebid (Bid No. 23-036A) SCOPE: This change order adds charges for additional work performed at the request of the City and for cost additions and deletions due to variations in actual quantities supplied versus planned quantities. The additional work performed at the request of the City included the following: • Additional Deck slab repair work completed on the Highland Avenue Bridge, the Chicago Street Bridge, and the Big Timber Road Bridge over Tyler Creek to account for additional areas of the deck slab that had further deteriorated from the time that the project plans and quantities had been formed. • The additional quantities related to site restoration at the Damisch Road Cattle Crossing Aban- donment project location, which included increases to pavement patching, roadside embankment, and landscape restoration quantities, due to the site conditions following the structure abandon- ment work. • Additional quantities related to the culvert removal and replacement at the Oakdale Drive and Quail Lane project location, which included increases to stone riprap and trench backfill quanti- ties. In order to provide improved drainage conditions at the subject project area, during con- struction it was determined that variances from the project plan would be made, resulting in quantity increases. • The repair of an additional traffic barrier terminal end section due to its previously existing state of disrepair and proximity to other project improvements. • The painting of the entirety of the interior of the bridge at the Bowes Creek Boulevard over ICRR project location to ensure continuity in color throughout. • The creation and installation of traffic control signage to notify the motoring public of roadway closures at the Damisch Road Cattle Crossing and Oakdale Drive and Quail Lane Culvert project locations before and during construction operations. This work item was not included in the orig- inal contract pay items and was submitted to the City by the contractor in the form of an Agreed Unit Price (AUP) quotation. REASONS FOR CHANGE: This was a unit price Contract; therefore, the Contractor was paid based on the actual completed and measured quantity for each item installed; an additional pay item was added which was not part of the original contract. As this is the Final change order for this contract, unused pay item quantities are shown as deductions to the contract amount. In addition: • The circumstances said to necessitate the change in performance were not reasonably foreseeable at the time the contract was signed • Quantity balancing authorizations are typical for construction projects to pay only for those items actually constructed • The change is germane to the original contract as signed • The change order is in the best interests of the City of Elgin and authorized by law SUMMARY OF CHANGES IN CONTRACT AMOUNT: Contract is being amended as to cost for reasons stated above. ORIGINAL CONTRACT AMOUNT: $519,827.08 CHANGE ORDER No. 1 Pay Item# Pay Item Description 1 Bridge Deck Concrete Sealer ($1,046.60) 2 Bridge Deck Washing ($228.90) 4 Concrete Removal ($225.00) 5 Deck Slab Repair(Partial) $76,685.00 6 Erosion Control Blanket $723.00 8 Furnished Excavation ($2,547.00) 9 Paint Concrete $7,132.00 10 Pavement Patching, Type III, 12" ($14,805.00) 11 Pavement Patching, Type IV, 12" $27,777.00 13 Pipe Culverts,Class A,Type 1 36" ($760.00) 14 Pipe Culverts To Be Cleaned, 84" $170.00 15 Porous Granular Embankment $313.50 18 Remove Drift (S 196.00) 20 Repair Traffic Barrier Terminal End Section $3,090.00 22 Seeding, Special $723.00 23 Stone Riprap Class A4 $6,352.50 24 Structural Repair of Concrete (Depth=/< 5 Inches) ($6,000.60) 26 Topsoil, Furnish and Place, 4" $1,909.50 29 Traffic Control and Protection, Standard 701501 (S 1,500.00) 34 Trench Backfill $682.50 38 AUP#1 —Temporary Information Signing $2,284.80 TOTAL FOR CHANGE ORDER NO. 1: ADD $100,533.70 PREVIOUS CHANGE ORDER(S): NONE $0.00 TOTAL OF PREVIOUS CHANGE ORDERS: ADD $0.00 TOTAL REVISED CONTRACT AMOUNT: $620,360.78 The original amount of the contract with Alliance Contractors, Inc. is $519,827.08. Change Order No. 1 will increase the original contract amount by a total of$100,533.70, that sum representing nineteen point three percent (19.3%) of the original contract amount. The new contract amount, inclusive of all change orders is $620,360.78. OTHER CONTRACT PROVISIONS: All other contract provisions remain the same. CHANGE ORDER No. 1 AND FINAL Agreed to this 14 day of August , 2024. Recommended by: Engineering Department By: Mike Pubentz, P.E. Title: Public Services Director Date: It/411445 Signature: 8/1/2024 Accepted by: Alliance Contractors, Inc. Party of the Second Part (Contractor) By: Dawn Thibadeau Title: Vice President Date: 8/1/2024 Signature: _s„ id.".4,._4' L Approved by: CITY OF ELGIN Party of the First Part (Owner) By: Richard G. Kozal Title: City Manager Date: August , 24 Signature: Legal Dept\Agreement`Change Order No 1-2024 Bridge Rehab Pr ect-Clean-7-25-24.doc.docx