HomeMy WebLinkAbout24-145 Resolution No. 24-145
RESOLUTION
AUTHORIZING EXECUTION OF AN AMENDMENT AGREEMENT NO. 1 WITH HR
GREEN, INC. FOR ADDITIONAL PROFESSIONAL ENGINEERING SERVICES IN
CONNECTION WITH THE EAST CHICAGO STREET SANITARY SEWER SERVICE
LINING PROJECT
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN,ILLINOIS,that
pursuant to Elgin Municipal Code Section 5.02.020B(9) the City Council hereby finds that an
exception to the requirements of the procurement ordinance is necessary and in the best interest of
the city; and
BE IT FURTHER RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN,
ILLINOIS, that Richard G. Kozal, City Manager, and Kimberly A. Dewis, City Clerk, be and are
hereby authorized and directed to execute an Amendment Agreement No. 1 on behalf of the City of
Elgin with HR Green, Inc.,for additional professional engineering services in connection with the
East Chicago Street sanitary sewer service lining project, a copy of which is attached hereto and
made a part hereof by reference.
s/David J. Kaptain
David J. Kaptain, Mayor
Presented: June 12, 2024
Adopted: June 12,2024
Omnibus Vote: Yeas: 9 Nays: 0
Attest:
s/Kimberly Dewis
Kimberly Dewis, City Clerk
AMENDMENT AGREEMENT NO. 1
THIS AMENDMENT AGREEMENT No. 1 is hereby made and entered into this 12th _
day of_June , 2024, by and between the City of Elgin, Illinois,a municipal corporation
(hereinafter referred to as the"CITY"), and HR Green, Inc. an Iowa corporation authorized to do
business in the State of Illinois(hereinafter referred to as"ENGINEER").
WHEREAS, the CITY and ENGINEER hereto have previously entered into an
agreement dated November 3, 2021 and approved by City Council on December 1, 2021 (P.O.
336518) (hereinafter referred to as the "Original Agreement") wherein the CITY engaged the
ENGINEER to furnish certain professional services in connection with the E. CHICAGO ST.
SANITARY SEWER SERVICE LINING PROJECT (hereinafter referred to as the "Project");
and
WHEREAS,the parties hereto have each determined it to be in their interest to amend the
Original Agreement; and
WHEREAS, after entering into the Original Agreement the parties hereto have
determined that the proposed scope of the Project should be modified to include the additional
Professional Engineering Services described herein (hereinafter referred to as "Supplemental
Services"); and
WHEREAS, the contract price for the Original Agreement was in the amount of
$96,450.00, and the cost for additional services to be provided pursuant to this Amendment
Agreement No. 1 is in the amount of$45,500.00;and
WHEREAS, the changes contemplated by this Amendment Agreement No. 1 are
germane to the Original Agreement as signed; and this Amendment Agreement No. 1 is in the
best interests of the CITY and is authorized by law.
NOW, THEREFORE, for and in consideration of the mutual undertakings as provided
herein, and other good and valuable consideration, the sufficiency of which is hereby mutually
acknowledged,the parties hereto agree as follows:
1. The above recitals are incorporated into and made a part of this Agreement as if fully
recited hereby.
2. That Section 1 of the Original Agreement is hereby amended by adding the
following additional subparagraph D thereto to read as follows:
"D. ENGINEER shall also perform the additional engineering services relating
to the PROJECT as outlined and described in Attachment A-3,dated April
15`h, 2024 and entitled, "SCOPE OF SERVICES — CONSTRUCTION
ADMINISTRATION AND OBSERVATION SERVICES FOR THE E.
CHICAGO ST. SANITARY SEWER SERVICE LINING PROJECT'
1
attached hereto and made a part hereof (hereinafter referred to as the
"Supplemental Services")."
3. That Section 2 of the Original Agreement is hereby amended by adding the
following to the end of Subparagraph B:
"ENGINEER shall provide the Supplemental Services provided for in
Amendment Agreement No. 1 in accordance with the schedule and fee
outlined herein and detailed in Attachment B-I."
4. That Section 4 of the Original Agreement is hereby amended by adding the
following additional subparagraph to the end thereof:
"E. For the Supplemental Services to be provided pursuant to Amendment Agreement
No. 1, the CITY shall reimburse the ENGINEER for such services in the total
amount not-to-exceed the sum of $45,500.00, regardless of the actual time or
actual costs incurred by the ENGINEER unless substantial modifications to the
PROJECT are authorized in writing by the CITY and approved by way of written
amendment to this Agreement. For the purposes of clarification, the total fees to
be paid to the ENGINEER pursuant to the Original Agreement and Amendment
Agreement No. I shall total $141,950.00. The detailed basis of the additional fee
associated with Amendment Agreement No. 1 is included in Attachment A-3 and
is based on hourly rates of personnel utilized. The Standard Schedule of Charges
included in the Original Agreement will be utilized for this PROJECT."
5. That except as amended in this Amendment Agreement No. 1, the Original Agreement
shall remain in full force and effect.
6. In the event of any conflict between the terms of the Original Agreement and the
provisions in this Amendment Agreement No. 1, the provisions of this Amendment
Agreement No. 1 shall control.
7. This Amendment Agreement may be executed in counterparts, each of which shall be an
original and all of which shall constitute one and the same agreement. For the purposes
of executing this Amendment Agreement, any signed copy of this Amendment
Agreement transmitted by fax machine or e-mail shall be treated in all manners and
respects as an original document. The signature of any party on a copy of this
Amendment Agreement transmitted by fax machine or e-mail shall be considered for
these purposes as an original signature and shall have the same legal effect as an original
signature. Any such faxed or e-mailed copy of this Amendment Agreement shall be
considered to have the same binding legal effect as an original document. At the request
of either party any fax or e-mail copy of this Amendment Agreement shall be re-executed
by the parties in an original form. No party to this Amendment Agreement shall raise the
use of fax machine or e-mail as a defense to this Amendment Agreement and shall
forever waive such defense.
2
IN WITNESS WHEREOF, the undersigned have entered into and executed this
Amendment Agreement as of the date and year first written above.
CITY a " ' IN NGINICCR
•
By: / /:y:
City Manager Pr' ci
Att t: Attest:
ity Clerk Its Secretary
r3I1'611-Li
Legal Dept\Agreement\HR Green Amend Agr#l-E Chicago St Sanitary Sewer-Clean-5-I 0-24.docx
_
1 CHRISTINE BORGERDING
1 Official Seal
1 Notary Public •State of Illinois 1
1 My Commission Expires Sep 17, 2025
3
ATTACHMENT A-3
SCOPE OF SERVICES
CONSTRUCTION ADMINISTRATION AND OBSERVATION SERVICES FOR THE
E. CHICAGO ST. SANITARY SEWER SERVICE LINING PROJECT
(ADDENDUM No. 1)
City of Elgin, IL
April 15, 2024
PROJECT BACKGROUND/PROJECT UNDERSTANDING
HR Green, Inc. (ENGINEER) has been requested by the City of Elgin, Illinois (CITY)to provide
professional engineering services agreement in relation to the E. Chicago Sanitary Sewer
Service Lining Project. Chicago Street is an FAU Route 1321 and was reconstructed from
Center Street (Villa Street)to Liberty Street in late 2020. The purpose of this request is for the
CITY to proactively upgrade the existing private sanitary sewer services within the
reconstruction project limits by proposing Cured In Place Pipe (CIPP) lining of the sanitary
sewer services. Since the start of the project and based on the construction timeline from
Phase I (Ending December 2023)to Phase II starting in January 2024 there have been
approximately thirteen (13) additional services identified and needing CIPP lining. The lining of
the services is expected to extend from the main line and stop at a new cleanout to be installed
within the Right-of-Way(ROW). The lining of the services will avoid future reactionary and
expensive repairs within the newly reconstructed roadway section.
The CITY has also requested that construction administration and observation services be
provided for the continuation of Phase II starting in January 2024 when available by the
Contractor. The ENGINEER is to complete the following scope of services (continuation into
Phase II)for the E. Chicago St. Sanitary Sewer Service Lining Project as identified below:
CONSTRUCTION ADMINISTRATION AND OBSERVATION SERVICES
For the purposes of the contract scope and fee,the following estimates for construction duration
have been assumed.
• An additional six(6)week construction schedule is anticipated from start of construction
to final completion (approximately 30 working days). See Attachment B-1 for assumed
schedule and for Man-Hour estimates.
• The man-hours required for construction administration and observation services are
based upon the time required for startup, construction observation, progress meetings,
administration/coordination and project close out. It is anticipated that the contractor will
complete the project by the contract completion date and within the assumed six (6)
week construction schedule. Any additional work due to an extended schedule dictated
by the contractor's performance or unanticipated work due to site conditions shall
warrant a contract addendum.
Attachment A-3
Scope of Services-Construction Administration—Amendment No. 1
E.Chicago St.Sanitary Sewer Service Lining Project
Page 2 of 2
The following is a breakdown of the various tasks associated with the construction administration
and inspection services, which will be completed by HR Green, Inc.:
A. Construction Observation
ENGINEER will provide full-time Construction Observation Services on a time and
material, not-to-exceed contract amount basis. ENGINEER will be on-site to observe
and verify that items being constructed, and materials being utilized are in general
conformance with the approved plans and specifications.
ENGINEER will complete a daily diary, measure and document contract quantities,
complete payment estimates, change orders, and weekly reports. Weekly reports will
be submitted to the contractor, and the CITY. ENGINEER will verify that all materials
incorporated into this project are materials that are in general conformance with the
approved plans and specifications. ENGINEER shall keep the CITY informed as to the
progress of construction.
ENGINEER anticipates a construction technician will be on site observing construction
and completing necessary documentation for eight (8) hours per day. During the
construction, ENGINEER will also coordinate and provide notification of temporary
service outage to all affected stakeholders within the project area and will also
coordinate such notifications with the City's Project Manager and 311 Contact Center.
B. Administration/Coordination
This task will involve the oversight of the project by the ENGINEER's Project Manager
and will include the on-going review of the project execution, documentation, schedule
and budget, contract file management, and general correspondence between
ENGINEER, CITY, the contractor, and subcontractors.
\\hrgreen.com\H RG\Data12021\211414Wdmin\Contract\Client\Amend ment_No-1-HRG-City103-Attachment_A-3_Construction-Scope
of Services-REV041524-Final.docx
ATTACHMENT B-1 - PROJECT SCHEDULE FOR AMENDMENT AGREEMENT NO.1 ;
E-iRC;t-r-or E. CHICAGO ST. SANITARY SEWER SERVICE LINING PROJECT ELGiN
CONSTRUCTION ENGINEERING SERVICES
Estimate for Week of January 2nd, 2024
Task Descriptions START DATE END DATE
Task 1 A. Construction Observation-Utilities (8hrs/day) 2-Jan-24 31-May-24
Task 2 B. Administration/Coordination 2-Jan-24 31-May-24
OVERALL SCHEDULE FOR CONSTRUCTION ENGINEERING SERVICES 2-Jan-24 31-May-24
'This schedule was prepared to include reasonable allowances for review and approval times required by the CITY and public authorities having jurisdiction
over the project. This schedule shall be equitably adjusted as the project progresses, allowing for changes in the scope of the project requested by the CITY
or for delays or other causes beyond the control of ENGINEER.
OteV ATTACHMENT B-1-MAN-HOUR AND FEE ESTIMATE FOR AMENDMENT AGREEMENT NO.1 1.
E.CHICAGO ST.SANITARY SEWER SERVICE LINING PROJECT-CONSTRUCTION ENGINEERING SERVICES ELGIN
Task Descriptions Hours Labor Fee Sub-Consultant) Direct Costs Total FEE
CONSTRUCTION ENGINEERING SERVICES(SEE ATTACHMENT A.3)
A. Construction observation-Utilities(8hrs/day) 244 $42,920 $1,180 $44,100
B. Administration/Coordination 6 $1,150 $250 $1,400
Sub-Total for Construction Engineering Services 250 $44,070 $0 $1,430 $45,500
GRAND TOTAL FOR CONSTRUCTION ENGINEERING SERVCIES 250 $44,070 $0 $1,430 $45,500
Construction Engineering Assumptions:
1. Contract E.Chicago St,=Ongoing and Early Spring for Continuation of Phase II Services
2. Construction E.Chicago St.-30 Field Days and includes manhours starting Jan. 1st,2024
3.Constuction Weekly Mtgs are included within the full day for RE
4. Construction Project Manager estimated at 1 hrs per week(6 weeks=6 hrs)