HomeMy WebLinkAbout24-124 Resolution No. 24-124 RESOLUTION AUTHORIZING EXECUTION OF A CHANGE ORDER NO. 1 WITH DN TANKS, LLC FOR THE BAFFLE WALL REPLACEMENT PROJECT (BID NO. 23-046) WHEREAS, the City of Elgin has heretofore entered into a contract with DN Tanks, LLC for the baffle wall replacement project(Bid No. 23-046); and WHEREAS, it is necessary and desirable to modify the terms of the contract as is described in Change Order No. 1 attached hereto; and WHEREAS,that pursuant to Elgin Municipal Code Section 5.02.020B(9)the City Council hereby finds that an exception to the requirements of the procurement ordinance is necessary and in the best interest of the city. NOW,THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN,ILLINOIS,that Richard G.Kozal,City Manager,be and is hereby authorized and directed to execute Change Order No. 1, a copy of which is attached hereto and made a part hereof by reference. s/ David J. Kaptain David J. Kaptain, Mayor Presented: May 8, 2024 Adopted: May 8, 2024 Omnibus Vote: Yeas: 8 Nays: 0 Attest: s/Kimberly Dewis Kimberly Dewis, City Clerk 'l OF E� V..N+'tib; Crti City of Elgin Change Order ul it . ELGIN,ILLINOIS PROJECT 3491-23;4754-23 CHANGE ORDER No. 1 CONTRACT: Elgin, IL Baffle Wall Replacement Bid No.23-046 SCOPE: The original Project Scope for the 1MG Riverside Steel GSR was to blast and paint the entire roof structure and panels in preparation for replacement of all the baffle walls and associated support and fastening components. This Change Order is for all activities associated with the additional work of replacing the entire deteriorated rafter support structure. This Change Order also provides for the blasting and painting of the remainder of the reservoir interior (shell and floor) to provide complete replacement of the interior wet coating system. REASONS FOR CHANGE: Upon starting the Project on the scheduled date of October 16, 2023, the Contractor expressed concern regarding some observed roof rafters that were corroded to the extent they had partially broken free from their attachment points. After scaffolding had been erected, KLM performed a closer inspection of the roof structure and concluded many rafters were either corroded beyond repair or of questionable integrity. The conditions of the rafter structure were not foreseeable at the time the Project Specifications were developed due to the emergency nature of the baffle wall replacement and the inability to take the reservoir out of service. Given the extent of the degradation, the recommendation by KLM is to replace the entire roof rafter system with new steel of matching size and quantity. With removal and replacement of the entire roof support structure, it is anticipated that significant damage will be done to the existing coatings within the reservoir. Replacement of the entire interior roof and roof structure coatings is already part of the original Project Scope; however, replacement of the shell and floor coatings is not. By replacing the shell and floor coatings, the reservoir interior will have a uniform coating system that will ideally provide 15 to 20 years of service without needing significant repairs or disturbance to the new baffle walls. The result would be complete replacement of all interior wet coatings. The circumstances said to necessitate the change in performance were not reasonably foreseeable at the time the contract was signed; the change is germane to the original contract as signed; and the change order is in the best interests of the City of Elgin and is authorized by law. SUMMARY OF CHANGES IN CONTRACT AMOUNT: ORIGINAL CONTRACT AMOUNT: $1,497,800.00 CHANGE ORDER NO. 1 Replacement of Rafter Support Structure Removal and Replacement of all Roof Structure $177,000.00 5%Sub Mark-Up(DN mark up on Welding) $ 8,850.00 Three(3) Weeks of Site Supervision $ 8,000.00 CO-1 Remobilizing and Re-rigging $ 19,418.48 5%Sub Mark-Up(DN mark up on ERA) $ 970.92 Disinfect and Clean Tank $ 4,351.00 Total for Replacement of Rafter Support Structure: $218,590.40 Replacement of Shell and Floor Coatings Blasting and Painting Entire Shell and Floor for Complete Interior Coating Replacement $238,000.00 GC Site Supervision during Blast and Paint $ 7,200.00 5%Sub Mark-Up(DN mark up on ERA) $ 12,260.00 Total for Replacement of Shell and Floor Coatings: $257,460.00 TOTAL FOR CHANGE ORDER NO. 1 $476,050.40 TOTAL REVISED CONTRACT AMOUNT: $1,973,850.40 The original amount of the contract with DN Tanks of Illinois, Inc. is$1,497,800.00. Change Order No. 1 will increase the original contract amount by a total of $476,050.40, that sum representing approximately thirty-one and eight-tenths percent (31.8%) of the original contract amount. The new contract amount, inclusive of all change orders is$1,973,850.40. OTHER CONTRACT PROVISIONS: The original contract included a substantial completion date of December 7, 2023. Due to the unforeseen circumstances encountered during construction and the necessity to perform the work in specified seasons the new substantial completion date is December 15, 2024. CHANGE ORDER No. 1 APRIL 24,2024 Agreed to this 8th day of May ,2024. Recommended by: KLM Engineering, Inc. By: Scott Kriese Title: Project Supervisor Date: 3-29-24 Signature: CO-2 Accepted by: DN Tanks of Illinois,LLC Party of the Second Part(Contractor) By: Jesse Adegbe Title: Project Manager Date: 4/22/2024 Signature: Ped4e 7141 Approved by: CITY OF ELGIN Party of the First Part (Owner) By: Richard G. Kozal Title: City Manager Date: Ma Signature: Legal Dept\Agreement\Change Order No. 1-DN Tanks-Baffle Wall Replacement-Clean-4-19-24.docx CO-3