HomeMy WebLinkAbout24-0306 FH Paschen Hemmens Equipment Enclosure March 6, 2024 Agenda Bid Item: #1 — Hemmens Equipment Enclosure — Job Order Contract ($88,809) JOB ORDER CONTRACT AGREEMENT THIS AGREEMENT is dated this 6th day of March , 2024, by and between the City of Elgin, an Illinois Municipal Corporation(herein called "City") and F.H. Paschen, S.N. Nielsen & Associates, LLC, an Illinois limited liability company (herein called "Contractor"), a corporation with a principal place of business at 5515 N. East River Road,Chicago, Illinois 60656. WHEREAS, the City has requested and Contractor has provided a proposal for a job order contract to provide for fencing at the Elgin Hemmens Theatre including concrete piers; chiller enclosure assembly and paint chiller enclosure assembly; and WHEREAS, Contractor submitted a proposal for a job order contract for such work dated February 20, 2024, consisting of six(6)pages, attached hereto as Attachment A("Contractor's Job Order Contract Proposal"); and WHEREAS,the City Council has determined that it to be in the best interests of the City to award the contract to the Contractor for such fencing installation at the Elgin Hemmens Theatre (hereinafter referred to as the"Work"). NOW, THEREFORE, in consideration of the mutual promises and covenants herein, the sufficiency of which is hereby acknowledged,the parties hereto hereby agree as follows: Article 1. Work. Contractor shall complete the Work as specified in the Contract Documents. The Work is generally described as follows: This project will generally be comprised of the installation of fencing at the Elgin Hemmens Theatre including concrete piers; chiller enclosure assembly and paint chiller enclosure assembly. The scope of Work is summarized in Contractor's Job Order Contract Proposal and includes the installation of fencing at the Elgin Hemmens Theatre including concrete piers;chiller enclosure assembly and paint chiller enclosure assembly. Article 2. City Representative. There is no Engineer for the Work. The City's Building Maintenance Superintendent shall act as City's representative and shall assume and provide such duties and obligations of the Engineer to the extent provided in the Contract Documents. Article 3. Work Completion, Liquidated Damages, Delays and Damages. 3.1. Work Completion. The Work shall be completed as provided in the Contract Documents. Substantial completion shall be within 90 calendar days of written Notice to Proceed. Final Completion shall be within 120 calendar days of written Notice to Proceed. In the event of any conflict between these dates and dates elsewhere in the Contract Documents, these dates shall prevail. Time is of the essence of this Agreement. 3.2. Liquidated Damages. The City and Contractor agree that as reasonable liquidated damages for delay (but not as a penalty) Contractor shall pay City $300.00 for each day beyond the time specified for Substantial Completion in the Contract Documents. After Substantial Completion, if Contractor shall neglect, refuse, or fail to complete the remaining Work within the times specified in the Contract Documents (hereinafter referred to as "Contract Times") or any proper extension thereof granted by City, Contractor shall pay City $300.00 for each day beyond the time for Final Completion. Contractor agrees and acknowledges that such liquidated damages constitute a reasonable estimate of City's actual damages. Such liquidated damages shall constitute City's sole recourse for and shall constitute full satisfaction of City's actual damages resulting from Contractor's delay. Contractor further acknowledges and agrees that in the event any provisions in any of the Contract Documents conflict with the provisions of this paragraph or otherwise provide for damages resulting from Contractor's delay,the provisions of this paragraph shall control,and such conflicting provisions and any Contract Documents shall not constitute, and shall not be construed as, a basis by which to render the provisions of this paragraph unenforceable. 3.3. Delays and Damages. In the event Contractor is delayed in the prosecution and completion of the Work or achievement of any Contract Times because of any delays caused by City or Engineer, Contractor shall have no claim against City or Engineer for damages or contract adjustment other than an extension of the Contract Times as provided herein and the waiving of liquidated damages during the period occasioned by the delay. Article 4. Contract Price. City shall pay Contractor$88,808.91 as indicated in the Contractor's Job Order Contract Proposal for completion of the Work in accordance with the Contract Documents. Article 5. Payments. 5.1. Payments. City shall make payments on the basis of Contractor's Applications for Payment as recommended by the City's Building Maintenance Superintendent,in conformance with the City of Elgin's accounts payable schedule. All payments shall be based on the progress of the Work measured by the schedules provided in the Contract Documents. Notwithstanding anything to the contrary in any Contract Documents,City shall be entitled to withhold any payments pending the submission of partial or full waivers of lien and/or certifications verifying the receipt of payment for all work performed by all subcontractors up to the date of Contractor's application for partial or final payment in City's sole discretion. City shall further be entitled to make such payments directly to any subcontractors as may be necessary to obtain such lien waivers and/or certifications. In the event City makes any such payments directly to any subcontractors, the amount of such payments shall be deducted from the total amount due to Contractor pursuant to this Agreement; and Contractor shall provide a written release to City in the amount of any such payments upon ten(10) days written demand. Concurrent with all applications for payment, Contractor shall provide City with a sworn certification of all work performed by all subcontractors and amounts paid to all subcontractors as of the date of application. 2 5.2. Retainage. City may withhold, from all payments prior to Substantial Completion, an amount equal to up to ten percent (10%) of work completed, at City's sole discretion. Upon Substantial Completion, City may release a portion of the retainage to Contractor, retaining at all times an amount sufficient to cover the cost of the Work remaining to be completed, at City's sole discretion. The time for payment of any retainage from City to Contractor shall be at City's sole discretion. Such payment shall not be unreasonably withheld. 5.3. Final Payment. The City shall not be required to make final payment prior to completion and acceptance of the Work by the City. Article 6. Contract Documents. There are no Contract Documents other than those listed below. The Contract Documents which comprise the entire agreement between City and Contractor concerning the Work consist of the following: a. This Agreement. b. Contractor's Job Order Contract Proposal, attached hereto as Attachment A. c. General Conditions, based upon EJCDC No. 1910-8 (1996 Edition)as modified by the City of Elgin, Illinois,attached hereto as Attachment B. d. Supplementary Conditions Regarding Insurance, attached hereto as Attachment C. e. Attachment D. Intentionally Omitted. f. City Forms attached hereto as Attachment E. g. Certificates of Insurance. h. Bonds i. Notice to Proceed. j. The terms of a Joint Purchasing Agreement through National Cooperative Purchasing Alliance, under Contract No. 04-27 for a base term September 5, 2023 to August 31, 2026, incorporated herein by reference. In the event of any conflict between the terms of the Joint Purchasing Agreement through National Cooperative Purchasing Alliance, and the other Contract Documents and this Agreement, the other Contract Documents and this Agreement shall supersede and control. k. Any subsequent Written Amendments to any documents listed above and other documents amending,modifying or supplementing the Contract Documents,which may be delivered or issued after the Effective Date of the Agreement and are not attached hereto. This Agreement and the Contract Documents listed above comprise the sole and exclusive Agreement between the parties hereto. There are no other agreements between the parties hereto either oral or written,and neither this Agreement nor any Contract Documents shall be modified or amended without the written consent of the authorized representatives of the parties hereto. Article 7. Prevailing Wage. 3 This Agreement calls for the construction of a "public work" within the meaning of the Illinois Prevailing Wage Act, 820 ILCS 130/.01, et seq., as amended. The Prevailing Wage Act requires contractors and subcontractors to pay laborers, workers, and mechanics performing services on public works projects no less than the current "prevailing rate of wages" (hourly cash wages plus amount for fringe benefits)in the county where the work is performed. The Illinois Department of Labor publishes the prevailing wage rates on its website at http://labor.illinois.gov/. The Illinois Department of Labor revises the prevailing wage rates and the contractor/subcontractor has an obligation to check the Illinois Department of Labor's website for revisions to prevailing wage rates. For information regarding current prevailing wage rates, please refer to the Illinois Department of Labor's website. All contractors and subcontractors rendering services under this Agreement must comply with all requirements of the Prevailing Wage Act, including but not limited to, all wage requirements and notice and record keeping duties. Article 8. Nondiscrimination/Affirmative Action. The Contractor will not discriminate against any employee or applicant for employment because of race, color, religion, sex, national origin, age, ancestry, order of protection status, familial status, marital status, physical or mental disability, military status, sexual orientation, or unfavorable discharge from military service which would not interfere with the efficient performance of the job in question. Contractor shall take affirmative action to comply with the provisions of Elgin Municipal Code Section 5.02.040 and will require any subcontractor to submit to the City a written commitment to comply with those provisions. Contractor shall distribute copies of this commitment to all persons who participate in recruitment, screening,referral and selection of job applicants and prospective subcontractors. Contractor agrees that the provisions of Section 5.02.040 of the Elgin Municipal Code, 1976,as amended, is hereby incorporated by reference, as if set out verbatim. Article 9. Miscellaneous. a. Terms used in this Agreement shall have the meanings indicated in the General Conditions. b. No assignment or delegation by a party hereto of any rights under,obligations or interests in the Contract Documents shall be binding on another party hereto without the written consent of the party sought to be bound; and specifically but without limitation moneys that may become due and moneys that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law); and unless specifically stated to the contrary in any written consent to an assignment,no assignment shall release or discharge the assignor from any duty or responsibility under the Contract Documents. c. City and Contractor each binds itself, its partners, successors, employees, assigns, and agents to the other party hereto, its partners, successors,employees, assigns, and agents in respect of all covenants, agreements, and obligations contained in the Contract Documents. 4 d. The business address of Contractor is hereby designated as the place to which all notices, letters,and other communication to Contractor shall be mailed or delivered. The address of City is hereby designated as the place to which all notices, letters, and other communication to the City shall be mailed or delivered. Such notices, letters and other communications shall be directed to the City's General Services Manager. Either party may change its address at any time by an instrument in writing delivered to Engineer and to the other party. e. The terms and provisions of this Agreement shall be severable. In the event any of the terms or provisions of this Agreement shall be deemed to be void or otherwise unenforceable for any reason,the remainder of this Agreement shall remain in full force and effect. f. This Agreement shall be subject to and governed by the laws of the State of Illinois. Venue for the resolution of any disputes and the enforcement of any rights arising out of or in connection with the Agreement shall be in the Circuit Court of Kane County, Illinois. g. This Agreement shall not be construed so as to create a partnership, joint venture, employment or agency relationship between the parties hereto except as may be specifically provided for herein. h. In the event of any conflict between any of the terms or provisions of this Agreement and any other Contract Documents, the terms and provisions of this Agreement shall control. i. Indemnification. To the fullest extent permitted by law,Contractor agrees to and shall indemnify, defend and hold harmless the City,the Engineer,Engineer's consultants and the officers, employees, boards and commissions of each and any of them from and against any and all claims, suits,judgments, costs, attorneys' fees, damages or any and all other relief or liability arising out of or resulting from or through, or alleged to arise out of, any acts or negligent acts or omissions of Contractor or Contractor's officers, employees,agents or subcontractors in the performance of this Agreement,or arising out of or in connection with litigation based on any mechanic's lien or other claims, suits, judgments and/or demands for damages by subcontractors. In the event of any action against the City, its officers, employees, agents, boards or commissions covered by the foregoing duty to indemnify, defend and hold harmless, such action shall be defended by legal counsel of City's choosing. In the event and to the extent that any legal work is performed by City's in-house legal counsel pursuant to the provisions of this section, City shall be reimbursed by Contractor for such legal work at the rate of$200 per hour, which rate Contractor hereby agrees and acknowledges to be a reasonable rate for such in-house attorneys' fees. The provisions of this paragraph shall survive any expiration and/or termination of this Agreement. j. Compliance with Laws. Notwithstanding any other provision of this Contract it is expressly agreed and understood that in connection with the performance of this Contract 5 that the Contractor shall comply with all applicable Federal, State, City and other requirements of law, including, but not limited to, any application requirements regarding prevailing wages, minimum wage, workplace safety and legal status of employees. Contractor shall also at its expense secure all permits and licenses, pay all charges and fees and give all notices necessary and incident to the due and lawful prosecution of the work, and/or the products and/or services to be provided for in this Contract. The City shall have the right to audit any records in the possession or control of the Contractor to determine Contractor's compliance with the provisions of this section. In the event the City proceeds with such an audit the Contractor shall make available to the City the Contractor's relevant records at no cost to the City. Contractor shall pay any and all costs associated with any such audit. Without limiting the foregoing, Contractor hereby certifies, represents and warrants to the City that all Contractor's employees and/or agents who will be providing products and/or services with respect to this Contract shall be legally authorized to work in the United States. k. No Interest. Contractor hereby waives any and all claims to interest on money claimed to be due pursuant to this Agreement, and all such rights to interest to which it may otherwise be entitled pursuant to law,including,but not limited to,pursuant to the Local Government Prompt Payment Act (50 ILCS 505/1, et seq.), as amended, or the Illinois Interest Act(815 ILCS 205/1, et seq.),as amended. 1. Limitation of Actions. Contractor agrees that any cause of action, lawsuit or other legal claim by the Contractor arising out of this Agreement must be filed within one year of the date the alleged cause of action,lawsuit or other legal claim arose or the same will be time barred and waived and released by the Contractor. m. Registration. Contractor hereby warrants and represents that it is registered with the Illinois Secretary of State's Office or has been incorporated in the State of Illinois; and such entity further hereby warrants and represents that it is in good standing in the state of its incorporation or organization. n. Counterparts and Execution. This Agreement may be executed in counterparts, each of which shall be an original and all of which shall constitute one and the same agreement. This Agreement may be executed electronically,and any signed copy of this Agreement transmitted by facsimile machine,email,or other electronic means shall be treated in all manners and respects as an original document. The signature of any party on a copy of this Agreement transmitted by facsimile machine, email,or other electronic means shall be considered for these purposes an original signature and shall have the same legal effect as an original signature. 6 IN WITNESS WHEREOF, City and Contractor have signed this Agreement. This Agreement shall be effective on March 6 , 2024. CONTRACTOR: C . ' of Elgin Ze/(' 1344aly synod by Joshua Curran ....4c, , DN:on•Josnua Curran,c•V5. o•FH.Oaacnen, Dale:2021.02.21 14:22:35-05'00' By: Joshua Curran By: Richard G. Kozal Title: Vice President Title: City Manager Address for giving notices: Address for giving notices: F.H.Paschen, S.N.Nielsen&Associates,LLC City of Elgin 5515 N. East River Road 150 Dexter Court Chicago, Illinois 60656 Elgin, Illinois 60120 Attn: Project Manager Attn: Richard Hoke FEIN # Legal Dept\Agreement\Paschen Agr-Hemmens Theatre Fencing-2-2I-24.docx 7 Attachment A r imp February 20,2024 City of Elgin 1900 Holmes Road Elgin IL, 60123 Attn: Rich Hoke RE: Elgin Hemmens Theatre Fencing Dear Mr. Hoke, F.H. Paschen has visited the project site with City of Elgin and agreed to the following scope of work. We are pleased to present the following scope of work for your review. Scope of Work—Concrete Piers • Layout and auger(13) 12"x 4"holes. • Remove and dispose of spoils. • Provide labor and materials for 2' wide mow strip with fabric and 2-4"washed stone. • Furnish and set(13) 12"x 6"Sono-Tubes. • Furnish,tie,and set(13)8"round cages with(4)#4 verticals and(4)#3 hoops. • Pour(13)piers with 4000 psi concrete. o Set(13)anchors furnished by others. • Strip Sono-Tube facing when concrete is set. Scope of Work—Chiller Enclosure Assembly • Furnish and install(13)4"nominal sch 40 carbon steel pipe ASTM A513 HR type 1. • Furnish and weld(1) ''/4"x 4 'A"round plate to top of each post. • Furnish and weld(1) 12"x 12"x 3/4"ASTM A36 slotted base plate to bottom of each post. • Furnish and weld(26)drilled and tapped panel mount plates to posts. • Furnish(13) 12"x 12"x'A"J hook template plates. • Furnish(52)3/4"-10 threaded 24"long J hooks set in template and suspended over concrete column prior to pouring. • Furnish,rip,and cut deck panels to size. • Furnish and install a 3/4"nominal sch 40 carbon steel pipe ASTM A513 HR type 1 8'Iong vertical support. • Provide 2x6 stich weld to vertical side of each deck panel. • Furnish and install horizontal edge support on each horizontal side. • Support will be a C-channel C6x8.2 x 8' long welded to top/bottom of deck panel. • Furnish and install hex cap screws,flat/lock washers,and nuts to attach(12)sections to posts. • All posts and sections to be shop primed prior to installation. F.H.PASCHEN,S.N.NIELSEN&ASSOCIATES LLC F.H. PASCHEN 5515 N. East River Road,Chicago, IL 60656 p.773.444.3474 f. 773.693.0064 I www.fhpaschen.com rim? Scope of Work—Paint Chiller Enclosure Assembly • Provide labor and materials to paint structural enclosure with DTM Acrylic in color TBD. The cost to furnish and install the above referenced work is Eighty-Eight Thousand Eight Hundred Eight Dollars and Ninety-One Cents,$88,808.91. Clarifications • This proposal includes using the NCPA Cooperative Agreement and includes the associated fees. • This proposal excludes panel enclosure finish painting. • This proposal excludes mechanical or structural engineering. • This proposal excludes permit fees. • This proposal excludes the removal and disposal of any hazardous material. • This proposal excludes any unforeseen conditions that may arise. • This proposal excludes any overtime or premium time,proposal is based on normal work hours. • This proposal excludes any payment and performance bonds. • This proposal excludes any winter conditions. • This proposal excludes sales tax. • This proposal excludes any site restoration. • This proposal excludes any location of underground utilities. • This proposal excludes any repair,replacement,or re-location of piping underground. • This proposal includes only the following items described in the above scope. Please review this information at your earliest possible convenience and advise us as to how you wish to proceed. All required documents will be submitted at your request. If you have any questions or concerns,please do not hesitate to call. OWNER Date Dag&nout 02/20/2024 F.H. Paschen, S.N.Nielsen& Associates, LLC Date File FOR OFFICIAL USE ONLY rim? Estimate Details Labor- Material - Equipment Jared Witt F.H. Paschen 0000 - NCPA- Base Term - 12/03/2018 to 11/30/2022 F.H. PASCHEN Elgin Hemmens Theatre Fencing -4642 NCPA 04-27 2023-0020 Estimator: Jared Witt Summary of tagged estimates... Division Summary(MF04) 01 -General Requirements $5,976.26 26-Electrical 02-Existing Conditions $625.00 27-Communications $1,300.00 03-Concrete $8,784.32 28-Electronic Safety and Security 04-Masonry 31-Earthwork 05-Metals $35,724.83 32-Exterior Improvements 06-Wood,Plastics,and Composites 33-Utilities 07-Thermal and Moisture Protection $13,248.00 34-Transportation 08-Openings 35-Waterway and Marine Transportation 09-Finishes $17,498.00 41-Material Processing and Handling Equipment 10-Specialties 44-Pollution Control Equipment 11-Equipment 48-Water and Wastewater Equipment 12-Furnishings 48-Electric Power Generation 13-Special Construction Alternate 14-Conveying Equipment Trades 21-Fire Suppression Assemblies 22-Plumbing FMR 23-Heating,Ventilating,and Air-Conditioning(HVAC) MF04 Total(Without totalling components) $83,154.41 25-Integrated Automation Totalling Components Priced Line Items $83,154.41 NCPA-Regular Hours (-6.0000%) $(4,989.26) RSMeans NORTH SUBURBAN,It. CCI 202303,112.80% $10,643.76 Material, Labor, and Equipment Totals(No Totalling Components) Material 539,980.93 Labor: 538.979.66 Equipment $4.193.82 Other: $0.00 Laborhours: 341.09 Green Line Items:5 $15,637.55 Grand Total $88,808.91 FOR OFFICIAL USE ONLY Printed 20 FEB 2024 11143AM v2.645 Page 1 of 4 Elgin Hemmens Theatre Fencing-4642 NCPA 04-27 2023-0020 FOR OFFICIAL USE ONLY Estimate Details Estimator: Jared Witt Combined estimates... Item Description UM Crew Quantity Material Labor Equipment Unit Cost Total 01 -General Requirements 1 01-21-53-50-1750-L Cost adjustment factors,protection of existing Costs 63.000.0000 0.00 7.00 0.00 7.0000% $4.410.00 work,add to construction costs for particular job requirements,maximum Protection of existing work. 2 01-54-33-20-0070-2 Rent per day for rent earth auger,portable,trailer Ea. 1.0000 0.00 0.00 132.26 $132.26 $132.26 mounted Earth auger for one day to remove concrete. 3 01-54-36-50-1200 Mobilization or demobilization,delivery charge for Ea. A-03A 6.0000 0.00 186.20 52.80 $239.00 $1,434.00 small equipment,placed in rear of,or towed by pickup truck Mobilization and demobilization of crews to site. 01 -General Requirements Total 0.00 5,527.20 449.06 $5,976.26 02 - Existing Conditions 4 02-41-19-19-0725 Selective demolition,rubbish handling,dumpster. Week 1.0000 625.00 0.00 0.00 $625.00 $625.00 20 C.Y.,5 ton capacity,weekly rental.includes one dump per week,cost to be added to demolition cost Dumpster for concrete spoils. 02-Existing Conditions Total 625.00 0.00 0.00 $625.00 03-Concrete 5 03-30-53-40-0700 Structural concrete,in place,column(4000 psi). C.Y. C-14A 3.0000 704.00 1,588.50 82.50 $2,375.00 $7,125.00 square,up to 1%reinforcing by area,12'x 12', includes forms(4 uses),Grade 60 rebar,concrete (Portland cement Type I),placing and finishing Furnish and install concrete for new enclosure. 6 03-82-13-10-0500 Concrete core drilling,core,reinforced concrete Ea. B-89A 13.0000 0.72 94.84 11.44 $107.00 $1,391.00 slab,4'diameter,up to 6'thick slab,includes bit cost,layout and set up time Core(13)holes through 6'thick concrete. Holes to be 1'deep. 7 03-82-13-10-0500-0550 Concrete core drilling,core,reinforced concrete Ea. B-89A 78.0000 0.11 3.00 0.33 $3.44 $268.32 slab,4'diameter,up to 6'thick slab,includes bit cost,layout and set up time,for each additional inch of slab thickness in same hole.add(Modified using 03-82-13-10-0550) Core(13)holes through 6'thick concrete. Holes to be 1'deep.Line item only includes up to 6.'Each additional each is an add on.13 holes x 6"=78 additional Inches. FOR OFFICIAL USE ONLY Printed 20 FEB 2024 10:43AM v2.645 Page 2 of 4 Elgin Hemmens Theatre Fencing-4642 NCPA 04-27 2023-0020 FOR OFFICIAL USE ONLY Estimate Details Estimator: Jared Witt Combined estimates... 03-Concrete Item Description UM Crew Quantity Material Labor Equipment Unit Cost Total 03-Concrete Total 2,129.94 6,232.42 421.96 $8,784.32 05 - Metals 8 05-05-21-90-1300 Welding structural steel in field,single pass,0.1 L.F. E-14 1,632.0000 0.46 5.89 1.20 $7.55 $12,321.60 lb/LF, 1/8"thick,continuous fillet,down welding, type 6011 Welding deck panels to each other to create enclosure.Deck panels will be 8'in length.There are 12 total sections comprised of(5)24"pieces of steel deck panels and(2)12'pieces. (8k2+2'x2)+(8k2+1'x2)=136 LF x 12 sections=1632 LF of welding. 9 05-05-21-90-1800 Welding structural steel in field.3 passes,0.5 L.F. E-14 84.3600 2.32 29.68 6.00 $38.00 $3,205.68 lb/LF,3/8"thick,continuous fillet,down welding, type 6011 Welding plates for panel mounts to post brackets. 8"x2+13"x2=42 linear inches/12=3.5 LF per plate x 18 plates=63 LF 8'x2+8"x2=32 linear inches/12=2.67 LF per plate x 8 plates=21.36 LF Total=84.36 LF 10 05-05-21-90-2200 Welding structural steel in field,5-6 passes, 1.3 L.F. E-14 48.0000 6.05 73.93 15.02 $95.00 $4,560.00 lb/LF,3/4"thick,continuous fillet,down welding, type 6011 Welding baseplates to post for adjustable baseplate posts. Baseplates are 12"x12'=4 LF per plate x 12 plates=48 LF 11 05-12-23-65-0100 Steel plate,structural,for connections&stiffeners, S.F. 4.8750 18.95 0.00 0.00 $18.95 $92.38 1/4"T,shop fabricated,incl shop primer Each one of the(13)posts to have 1/4"x 4.5"round plate welded to the top. 4.5/12=.375 x 13=4.875 SF 12 05-12-23-65-0100 Steel plate,structural,for connections&stiffeners, S.F. 13.0000 18.95 0.00 0.00 $18.95 $246.35 1/4"T.shop fabricated.ind shop primer Furnish and intall(13)plates as template for J hooks. Plates are 12"x12"x1/4"=13 SF 13 05-12-23-65-0300 Steel plate,structural,for connections&stiffeners, S.F. 16.5200 28.50 0.00 0.00 $28.50 $470.82 3/8"T,shop fabricated,incl shop primer Furnish and install panel mount to post brackets 18 plates will be 8"x13"x3/8"=.72 sf per plate=12.96 SF 8 plates will be 8-x8'k3/8"=.44 sf per plate=3.56 SF Total=16.52 SF 14 05-12-23-65-0450 Steel plate,structural,for connections&stiffeners, S.F. 12.0000 57.00 0.00 0.00 $57.00 $684.00 FOR OFFICIAL USE ONLY Printed 20 FEB 2024 10:43AM v2.645 Page 3 of 4 Elgin Hemmens Theatre Fencing-4642 NCPA 04-27 2023-0020 FOR OFFICIAL USE ONLY Estimate Details Estimator: Jared Witt Combined estimates... 05-Metros Item Description UM Crew Quantity Material Labor Equipment Unit Cost Total 3/4"T.shop fabricated,ind shop primer Furnish and install adjustable baseplates for posts. (12)total plates that are 12Sc12"x3/4"=12 SF 15 05-52-13-50-0640 Railing,pipe,steel,galvanized.3 rails,3'-6"high, L.F. E-04 104.0000 108.35 26.33 1.32 $136.00 $14,144.00 posts @ 5'OC,1-1/2"diameter,shop fabricated Furnish and install(13)posts.Each post will be 8'long. 13x8'=104' 05 - Metals Total 13,998.79 18,403.24 3,322.80 $35,724.83 07 -Thermal and Moisture Protection 16 07-41-13-20-0740 Steel roofing panels,on steel frame,flat profile, S.F. G-03 1,152.0000 8.47 3.03 0.00 $11.50 $13,248.00 standard finish,1-3/4"standing seams, 12"wide, 26 gauge Fumish and install steel deck panels to create enclosure.Deck panels will be 8'in length.There are 12 total sections comprised of(5)24"pieces of steel deck panels and(2)12"pieces. 5x(85c2')+2x(8'x1)=96 SF x 12 total sections=1152 SF 07-Thermal and Moisture Protection Total 9,757.44 3,490.56 0.00 $13,248.00 09 - Finishes 17 09-97-13-23-6540 Paints and protective coatings,gloss topcoat, S.F. 2 PSST 10,800.0000 1.19 0.43 0.00 $1.62 $17,496.00 sprayed Painting enclosure with DTM Acrylic finish. Enclosure is 9'x 400'on each side=3,600 x 3 sides=10,800 SF. 09-Finishes Total 12,852.00 4,644 00 0.00 $17,496.00 27 - Communications 18 27-05-29-10-0140 Cable support.J-hook,single tier,single sided,4" Ea. 1 ELEC 52.0000 11.88 13.12 0.00 $25.00 $1,300 00 diameter Furnish and install(52)J hooks. 27 - Communications Total 617.76 682.24 0.00 51.300.00 Estimate Grand Total 88,808.91 FOR OFFICIAL USE ONLY Printed 20 FEB 2024 10:43AM v2.645 Page 4 of 4 Elgin Hemmens Theatre Fencing-4642 NCPA 04-27 2023-0020