Loading...
HomeMy WebLinkAbout23-6 Resolution No. 23-6 RESOLUTION AUTHORIZING EXECUTION OF A CHANGE ORDER NO. I WITH BOLDER CONTRACTORS, INC. FOR THE BLUFF CITY BOULEVARD COMBINED SEWER SEPARATION PROJECT—PHASE III (BID NO. 22-026) WHEREAS, the City of Elgin has heretofore entered into a contract with the Bolder Contractors, Inc. for the Bluff City Boulevard combined sewer separation project—Phase III (Bid No. 22-026); and WHEREAS,it is necessary and desirable to modify the terms of the contract as is described in Change Order No. 1 attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN,ILLINOIS,that Richard G.Kozal,City Manager,be and is hereby authorized and directed to execute Change Order No. 1, a copy of which is attached hereto and made a part hereof by reference. s/David J. Kaptain David J. Kaptain, Mayor Presented: January 25, 2023 Adopted: January 25, 2023 Omnibus Vote: Yeas: 8 Nays: 0 Attest: s/Kimberly Dewis Kimberly Dewis, City Clerk City of Elgin change Order ELGIN,ILLINOIS PROJECT#Bid No.22-026 CHANGE ORDER No. I CONTRACT: Bid No.22-026- Bluff City Boulevard Combined Sewer Separation Project—Phase III SCOPE: The Bluff City Boulevard Combined Sewer Separation Project Phase III project objective was to separate the existing combined sewer into two separate systems for storm water collection and sanitary sewer col- lection. The scope of work called for installation of storm Reinforced Concrete Pipe (RCP) of various sizes between 12-inch to 42-inch diameter. Structures such as catch basins, storm manholes, sanitary sewer work and water main work were included in the scope of work. The entire scope of work occurred within a residential neighborhood. A significant amount of the underground utilities are located within permanent pavement areas therefore requiring the disposal of the existing excavated material and replace- ment with aggregate trench backfill. This change order addresses the additional time for the procurement of aggregate trench backfi11. REASONS FOR CHANGE: The Notice to Proceed (NTP) for this project was issued to Bolder Contractors, Inc. on June 11, 2022. From June 71h, 2022 to July 26`h, 2022 the International Union of Operating Engineers Local 150 were striking against Lehigh Hanson, Vulcan Materials, and Lafarge Holcim. Lehigh Hanson, Vulcan Materi- als,and Lafarge Holcim are all aggregate material suppliers for the Chicagoland area.Bolder Contractors, Inc. source of aggregate material for the project was from Lafarge Holcim. This strike significantly re- duced the availability of aggregate material needed for trench backfill therefore delaying the start of con- struction for the project. This delayed start of construction pushed the completion date into the winter months when weather dependent restoration activities cannot be completed, such as Hot-Mix Asphalt (HMA) resurfacing and landscaping. Due to this Bolder Contractors, Inc. is requesting an extension of time to the original contract completion date of November 22"d,2022 to May 15d',2023. Bolder Contrac- tors, Inc.will not receive additional compensation for any compensable delays associated to the aggregate strike. The circumstances said to necessitate the change in performance time were not reasonably foreseeable at the time the contract was signed;the change is germane to the original contract as signed; and the change order is in the best interests of the City of Elgin and is authorized by law SUMMARY OF CHANGES IN CONTRACT TIME: The additional time is for the delayed construction start due to International Union of Operating Engineers Local 150 strike. ORIGINAL CONTRACT COMPLETION DATE: November 22"d, 2022 ORIGINAL CONTRACT AMOUNT: $5,932,827.50 CHANGE ORDER NO. 1 ADD 174 Calendar Days and $0.00 TOTAL FOR CHANGE ORDER NO. 1: ADD 174 Calendar Days and$0.00 PREVIOUS CHANGE ORDER(S): Change Order No.N/A N/A TOTAL OF PREVIOUS CHANGE ORDERS: N/A TOTAL REVISED CONTRACT COMPLETION DATE: May 15",2023 TOTAL REVISED CONTRACT AMOUNT: $5,932,827.50 The original completion date of the contract with Bolder Contractors is November 22nd, 2022. Change Order No. 1 totaling an additional 174 Calendar Days will increase the original contract completion date to May 15a',2023. OTHER CONTRACT PROVISIONS: All other contract provisions remain the same. CHANGE ORDER No. 1 Agreed to this 25 day of Ianuary 2023 Recommended by: WATER DEPARTMENT By: Eric Weiss Title: Water Director Date: }a/ aq/.Qo iq a- Signature: Accepted by: BOLDER CONTRACTORS,INC. Party of the Second Part(Contractor) By: Robert Gwiasda Title: President Date: /4 it7 0?2 Signature: . ''� Approved by: CITY OF ELGIN Party of the First Part(Owner) By: Richard G.Kozal Title: Cite Manager Date: Januar 023 Signature: 1:;;;4 Legal Dept\AgreemenAChange Order-I-Bolder Contractors Bid 22-026-Bluff City Sewer-10.26-22.doc.docx