HomeMy WebLinkAbout23-56 Resolution No. 23-56 RESOLUTION AUTHORIZING EXECUTION OF A CHANGE ORDER NO. 2 AND FINAL WITH ENGINEERING ENTERPRISES, INC. AND JOEL KENNEDY CONSTRUCTION CORP. FOR 2021 LEAD SERVICE LINE REPLACEMENT PROGRAM (Bid No. 21-004A) WHEREAS, the City of Elgin has heretofore entered into a contract with Engineering Enterprises, Inc. and Joel Kennedy Construction Corp. for 2021 Lead Service Line Replacement Program (Bid No. 21-004A); and WHEREAS,it is necessary and desirable to modify the terms of the contract as is described in Change Order No. 2 and Final attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that Richard G. Kozal, City Manager, and Kimberly A. Dewis, be and are hereby authorized and directed to execute Change Order No. 2 and Final, a copy of which is attached hereto and made a part hereof by reference. s/David J. Kaptain David J. Kaptain, Mayor Presented: April 12, 2023 Adopted: April 12, 2023 Omnibus Vote: Yeas: 8 Nays: 0 Attest: s/Kimberly Dewis Kimberly Dewis, City Clerk City of Elgin Change Order ELGIN,ILLINOIS PROJECT 21-004A CHANGE ORDER No. 2 and Final CONTRACT: 2021 Lead Service Line Replacement Program(Bid No. 21-004A) SCOPE: The above referenced project has been completed and final quantities are known. Change Or- der No. 2 and Final is the balancing change order to document the final construction value. REASONS FOR CHANGE: • The changes provided in this change order are germane to the original contract as signed. • The change order is in the best interest of the City of Elgin and authorized by law. SUMMARY OF CHANGES IN CONTRACT AMOUNT: ORIGINAL CONTRACT AMOUNT: $4,221,307.00 CHANGE ORDER No. 2 SEE ATTACHMENT TOTAL FOR CHANGE ORDER NO. 2 AND FINAL: SUBTRACT $685,154.86 PREVIOUS CHANGE ORDER(S): CHANGE ORDER No. 1 ADD $31,000 TOTAL OF PREVIOUS CHANGE ORDERS: ADD $31,000 TOTAL REVISED CONTRACT AMOUNT: $3,567,152.14 The original amount of the contract with Joel Kennedy Construction Corp is $4,221,307.00. Change Or- der No. 1 increased the original contract amount by a total of$31,000.00. Change Order No. 2 will de- crease the contract amount by a total of$685,154.86,that sum representing 16%of the original contract amount. The final contract amount, inclusive of all change orders is$3,567,152.14. OTHER CONTRACT PROVISIONS: All other contract provisions remain the same. CHANGE ORDER No.2 AND FINAL Agreed to this 12 day of April 92023 . Recommended by: Water Department By: Mike Pubentz Title: Interim Water Director Date: 02/27/23 Signature: Engineering Enterprises,Inc. Party of the Second Part(Engineer) By: Julie A. Morrison P.E. Title: Sr. PM/Principal Date: 2/27/23 ,I Signature: Y Joel Kennedy Construction Corp Party of the Second Part(Contractor) By: Michael Patti, P.E. Title: Project Manager Date: 2/27/23 Signature: Approved by: CITY OF ELGIN Party of the First Part(Owner) By: Richard G.Kozal Title: Cily Manager Date: A ri Signature. Att st: ll,lwaot� lty Clerk Legal Dept\Agreement\Change Order 2&Final-Lead Service Line Replace-Bid 21-004A-Clean 2-10-23.doc