HomeMy WebLinkAbout23-48 Resolution No. 23-48
RESOLUTION
AUTHORIZING EXECUTION OF AMENDMENT AGREEMENT NO. 3 WITH BAXTER&
WOODMAN, INC. FOR SUPPLEMENTAL PROFESSIONAL ENGINEERING SERVICES
RELATING TO CONSTRUCTION SERVICES IN CONNECTION WITH THE DUNDEE
AVENUE AND SUMMIT STREET INTERSECTION IMPROVEMENT PROJECT
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS,
that pursuant to Elgin Municipal Code Section 5.02.020B(9) the City Council hereby finds that
an exception to the requirements of the procurement ordinance is necessary and in the best
interest of the city; and
BE IT FURTHER RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN,
ILLINOIS, that Richard G. Kozal, City Manager, and Kimberly A. Dewis, City Clerk, be and are
hereby authorized and directed to execute an Amendment Agreement No. 3 on behalf of the City
of Elgin with Baxter & Woodman, Inc. for supplemental professional engineering services
relating to construction services in connection with the Dundee Avenue and Summit Street
Intersection Improvement Project, a copy of which is attached hereto and made a part hereof by
reference.
s/David J. Kaptain
David J. Kaptain, Mayor
Presented: March 22, 2023
Adopted: March 22, 2023
Omnibus Vote: Yeas: 9 Nays: 0
Attest:
s/Kimberly Dewis
Kimberly Dewis, City Clerk
AMENDMENT AGREEMENT NO. 3
This Amendment Agreement No. 3 is hereby made and entered in to this 22nd day of
March , 2023, by and between the City of Elgin, Illinois, a municipal corporation
(hereinafter referred to as the "CITY"), and Baxter & Woodman, Inc., an Illinois corporation
(hereinafter referred to as"ENGINEER").
WHEREAS, the CITY and the ENGINEER have previously entered into an agreement
dated March 6,2019(hereinafter referred to as"Original Agreement")wherein the CITY engaged
the ENGINEER to furnish certain professional services in connection with the Dundee Avenue
and Summit Street Intersection Improvements(hereinafter referred to as the"PROJECT"); and
WHEREAS, the CITY and the ENGINEER have also previously entered into an
Amendment Agreement No. 1 dated May 8,2019,wherein the CITY engaged the ENGINEER to
furnish certain additional professional services in conjunction with the PROJECT (hereinafter
referred to as"Amendment Agreement No. I"); and
WHEREAS,the CITY and the ENGINEER have also previously entered into Amendment
Agreement No. 2 dated December 2, 2020, where the CITY engaged the ENGINEER to furnish
certain and additional professional services in connection with PROJECT(hereinafter referred to
as"Amendment Agreement No. 2");
WHEREAS,the CITY has determined that the proposed scope of the PROJECT should be
further modified to include additional supplemental professional engineering services relating
construction services as described herein (hereinafter referred to as "Additional Supplemental
Services"); and
WHEREAS, the parties have determined and agreed that the total maximum payment for
the Additional Supplemental Services described in this Amendment Agreement No. 3 shall be in
the not to exceed amount of$421,403.15; and
WHEREAS,the changes contemplated by this Amendment Agreement No. 3 are germane
to the original agreements as signed, and this Amendment Agreement No. 3 is in the best interest
of the CITY and is authorized by law.
NOW, THEREFORE, for and in consideration of the mutual undertakings provided for
herein, and other good and valuable consideration, the receipt and sufficiency of which is hereby
acknowledged,the parties hereto agree as follows:
1. The above recitals are incorporated into and made a part of this Amendment Agreement
No. 3 as if fully recited herein.
2. Section 1 of the Original Agreement is hereby further amended by adding a new additional
Subparagraph F thereto to read as follows:
1
"F. The ENGINEER shall provide the Additional Supplemental Services for the PROJECT
to include the organization of a preconstruction meeting, review and approval of relevant
shop drawing submittals,creation and maintenance of a website with updates regarding the
PROJECT,construction administration,full-time construction observation,documentation
regarding construction operations and material quantities, review of contractor
construction pay requests, and all services deemed necessary by the DIRECTOR to
properly close out the project following the completion of construction work. Such
Additional Supplemental Services to be performed by the ENGINEER pursuant to this
Amendment Agreement No. 3 are outlined and described in Attachment A-3, attached
hereto and made a part hereof. An exhibit illustrating the general construction limits for
the PROJECT is provided in Attachment D, attached hereto and made a part hereof."
3. That Section 2 of the Original Agreement is hereby further amended by adding the
following to the end of Subparagraphs A and B thereof:
"A. The following outlined project milestone schedule is provided hereunder for
the Additional Supplemental Services be performed pursuant to Amendment
Agreement No. 3:
i. Bid Opening—February 15, 2023
ii. Contract Award Recommendation to City—February 22,2023
iii. Award Construction Contract—March 8, 2023
iv. Construction Engineering Services Agreement first reading at COW
—March 8,2023
V. Construction Engineering Services Agreement anticipated approval
—March 22, 2023
vi. Preconstruction Meeting(date tentative)—April 10,2023
vii. Anticipated Construction Start—April 17,2023
viii. Construction Substantial Completion—October 31, 2023
ix. Completion of Traffic Signal Installation and Punch List Items —
May 17,2024"
"B. ENGINEER shall provide the Additional Supplemental Services provided for
in this Amendment Agreement No. 3 in accordance with the schedule outlined
herein in Attachment B-3."
4. That Section 4 of the Original Agreement is hereby further amended by adding the
following Paragraph F and payment schedule thereto to read as follows:
"F. For the Additional Supplement Services provided pursuant to Amendment
Agreement No.3,the ENGINEER shall be paid at the rate of 1.547 times the direct
hourly rate of personnel employed on this PROJECT, as demonstrated in
Attachment C-3 Cost Estimate of Consultant Services, attached hereto and
incorporated into this agreement by this reference, with the total fee not to exceed
$421,403.15 regardless of the actual costs incurred by the ENGINEER unless
substantial modifications to the scope of the work are authorized in writing by the
2
DIRECTOR, and approved by way of written amendment to this Agreement
executed by the parties. For the purpose of clarification, the Original Agreement
provided a total fee not to exceed$125,875,Amendment Agreement No. 1 provided
for a total fee not to exceed$30,410,Amendment Agreement No. 2 provided for a
total fee not to exceed$18,590,with the total amount to be paid to the ENGINEER
pursuant to the Original Agreement, Amendment Agreement No. 1, Amendment
Agreement No. 2, and this Amendment Agreement No. 3 now totaling
$596,278.15.
For outside services provided by other firms or subconsultants,the CITY shall pay
the ENGINEER the invoiced fee to the ENGINEER, plus 10%. The cost of any
such outside services is included within the total not-to-exceed amount of
$421,403.15 provided for above.
The total fee includes reimbursable components, such as vehicle usage,translation
services, electronic field book subscription, and project web site maintenance. The
cost of any such reimbursable expenses is included within the total not-to-exceed
amount of $421,403.15 provided for above. See Attachment C-3 for labor
breakdown and other reimbursable components.
The CITY shall make periodic payments to the ENGINEER based upon actual
progress within 30 days after receipt and approval of invoice. Said periodic
payments to the ENGINEER shall not exceed the amounts shown in the following
schedule, and full payments for each task shall not be made until the task is
completed and accepted by the DIRECTOR.
Payment
Schedule:
Estimated
Date Estimated% Value of Estimated
Completion Work Invoice Value
Completed
4/30/2023 5.00% $21,070.16 $21,070.16
5/31/2023 20.00% $84 280.63 $63 210.47
6/30/2023 35.00% $147 491.10 $63,210.47
7/31/2023 50.00% $210 701.58 $63,210.47
8/31/2023 65.00% $273,912.05 $63,210.47
9/30/2023 80.00% $337,122.52 $63,210.47
10/31/2023 90.00% $379,262.84 $42,140.32
11/30/2023 94.00% $396,118.96 $16,856.13
12/31/2023 96.00% $404,547.02 $8 428.06
1/31/2024 96.50% $406,654.04 $2107.02
2/28/2024 97.00% $408,761.06 $2,107.02
3
3/31/2024 97.50% $410,868.07 $2,107.02
4/30/2024 98.00% $412,975.09 $2,107.02
5/31/2024 99.00% $417,189.12 $4,214.03
6/30/2024 100.00% $421,403.15 $4,214.03"
5. Except as amended in this Amendment Agreement No. 3, the Original Agreement as
previously amended by Amendment Agreement No. 1 and Amendment Agreement No. 2,
shall remain in full force and effect.
6. In the event of any conflict with the terms of the Original Agreement, Amendment
Agreement No. 1, Amendment Agreement No. 2 and the provisions of this Amendment
Agreement No. 3,the provisions of this Amendment Agreement No. 3 shall control.
IN WITNESS WHEREOF, the undersigned have entered into and executed this Amendment
Agreement No. 3 as of the date and year first written above.
FORT FOR THE ENGINEER
r
By By C/'f
City Manager Name/Print: Cr is g D. Mitchell, PE
Title: Vice President
Attest: Attest:
Its: Deputy Secretary
City Clerk
Legal DeptWgreement\Baxter&Woodmand Amend Agr 3-Summit&Dundee Intersection Imp Project 2-16-23.docx
4
CITY OF ELGIN,ILLINOIS
SUMMIT STREET&DUNDEE AVE IMPROVEMENTS
Attachment A-3 -Scope of Services
1.Act as the Owner's representative with duties,responsibilities and limitations of authority as
assigned in the construction contract documents.
2. PROJECT INITIATION
A.Coordinate with City Purchasing Department to ensure that all documents,including the Award
Letter,Agreement,Contract Documents,Performance/Payment Bonds,and Notice to Proceed are
received by the Contractor and City.Confirm that the City has received Contractor insurance
documents.
B.Attend and prepare minutes for the preconstruction conference,and review the Contractor's
proposed construction schedule and list of subcontractors.
3.CONSTRUCTION ADMINISTRATION
A.Organize and attend weekly on-site construction progress meetings.
B.Shop drawing and submittal review by Engineer shall apply only to the items in the submissions
and only for the purpose of assessing,if upon installation or incorporation in the Project,they are
generally consistent with the construction documents.Owner agrees that the contractor is solely
responsible for the submissions (regardless of the format in which provided,i.e.hard copy or
electronic transmission)and for compliance with the contract documents.Owner further agrees
that the Engineer's review and action in relation to these submissions shall not constitute the
provision of means,methods,techniques,sequencing or procedures of construction or extend to
safety programs of precautions.Engineer's consideration of a component does not constitute
acceptance of the assembled item.
C.Review construction record drawings for completeness prior to submission to CADD.
D. Prepare construction contract change orders and work directives when authorized by the
Owner.
E.Review the Contractor's requests for payments as construction work progresses,and advise the
Owner of amounts due and payable to the Contractor in accordance with the terms of the
construction contract documents.
F.Research and prepare written response by Engineer to request for information from the Owner
and Contractor.
G.Project manager or other office staff visit site as needed.
H.Prepare videos utilizing a"Google Street View" type camera mounted to a car for pre-
construction and post construction documentation.The post construction video will be submitted
to Google for review and update of Street View.
4.CREATE AND MAINTAIN WEBSITE
A.Obtain video and photographs of existing conditions.
B.Prepare,host,and maintain a Project website throughout Phase 111 Construction.The site will
contain useful information about the Project including schedule,roadway detours due to
construction activities,photographs,and FAQs.We will also include a sign-up option so that
interested parties can receive regular Project updates via email.
C. Prepare and distribute bilingual project notification letters which will include information
regarding the upcoming construction activities and resident engineer contact information.We will
also strongly encourage the businesses and residents to visit the Project website and sign up for
regular email notifications regarding construction activities.
D.Promote the website address in all Project communication tools (meetings,pamphlets,door to
door canvassing,press releases,and Village websites,etc.).
S.DRONE CAPTURED PROGRESS VIDEO RECORDING
A.Provide drone flights over the Project Site on a periodic basis of not more than two (2) hours per
month from Project Initiation through Project Completion,to record the various stages and
associated progress of the construction activities.Drone flights will provide high resolution video
and imagery.
B.Drone will be flown by a licensed Drone Pilot.
C.All Federal Aviation Administration (FAA) requirements will be reviewed and met before each
flight.
6.FIELD OBSERVATION-Full Time
A.Engineer's site observation shall be at the times agreed upon with the Owner.Engineer will
provide Resident Project Representatives at the construction site on a full-time basis of forty (40)
hours per week from Monday through Friday,not including legal holidays,as deemed necessary by
the Engineer,to assist the Contractor with interpretation of the Drawings and Specifications,to
observe in general if the Contractor's work is in conformity with the Final Design Documents,and
to monitor the Contractor's progress as related to the Construction Contract date of completion.
Through standard,reasonable means,Engineer will become generally familiar with observable
completed work.If Engineer observes completed work that is inconsistent with the construction
documents,that information shall be communicated to the contractor and Owner to address.
Engineer shall not supervise,direct,control,or have charge or authority over any contractor's
work,nor shall the Engineer have authority over or be responsible for the means,methods,
techniques,sequences,or procedures of construction selected or used by any contractor,or the
safety precautions and programs incident thereto,for security or safety at the site,nor for any
failure of any contractor to comply with laws and regulations applicable to such contractor's
furnishing and performing of its work.Engineer neither
guarantees the performance of any contractor nor assumes responsibility for any contractor's
failure to furnish and perform the work in accordance with the contract documents,which
contractor is solely responsible for its errors,omissions,and failure to carry out the work.Engineer
shall not be responsible for the acts or omissions of any contractor,subcontractor,or supplier,or of
any of their agents or employees or any other person, (except Engineer's own agents,employees,
and consultants)at the site or otherwise furnishing or performing any work;or for any decision
made regarding the contract documents,or any application,interpretation,or clarification,of the
contract documents,other than those made by the Engineer.
B.Provide the necessary base lines,benchmarks,and reference points to enable the Contractor to
proceed with the work.
C.Keep a daily record of the Contractor's work on those days that the Engineers are at the
construction site including notations on the nature and cost of any extra work,and provide weekly
reports to the Owner of the construction progress and working days charged against the
Contractor's time for completion.Provide daily updates to City staff via email regarding project
progress and post daily updates to the Construction Command page on the City's Salesforce
platform regarding construction progress and traffic control status.
D. Provide the services of a materials testing company,as a subconsultant,to perform
proportioning and testing of the Portland cement concrete and bituminous mixtures in accordance
with the IDOT's Bureau of Materials manuals of instructions for proportioning. Review laboratory,
shop and mill test reports of materials and equipment furnished by the Contractor.
7.COMPLETION OF PROJECT
A.Provide construction inspection services when notified by the Contractor that the Project is
complete.Prepare written punch lists during final completion inspections.
B.Review the Contractor's written guarantees and issue a Notice of Acceptability for the Project by
the Owner.
C.Review the Contractor's requests for final payment,and advise the Owner of the amounts due
and payable to the Contractor in accordance with the terms of the construction contract documents.
D.Prepare construction record drawings which show field measured dimensions of the completed
work which the Engineers consider significant and provide the Owner with an electronic copy
within ninety(90) days of the Project completion.
8.PROJECT CLOSEOUT—Provide construction-related engineering services including,but not
limited to,General Construction Administration and Resident Project Representative Services.
CITY OF ELGIN,ILLINOIS
SUMMIT STREET&DUNDEE AVE IMPROVEMENTS
ATTACHMENT B-3: ANTICIPATED PROJECT SCHEDULE
Bid opening February 15, 2023
Contract Award Recommendation to City February 22,2023
Award Construction Contract March 8, 2023
Construction Engineering Services Agreement first reading at COW March 8, 2023
Construction Engineering Services Agreement anticipated approval March 22, 2023
Preconstruction Meeting(date tentative) April 10,2023
Anticipated Construction Start April 17, 2023
Construction Substantial Completion (plus 10 WD's) October 31, 2023
Completion of Traffic Signal Installation and Punch List May 17, 2024
ATTACHMENT C-3-COST ESTIMATE OF CONSULTANT SERVICES
Illinois Department (CECS)WORKSHEET
of Transportation
FIXED RAISE
Local Public Agency County Section Number
Elgin I lKane Corporate
Prime Consultant(Firm) Name Prepared By Date
Baxter&Woodman, Inc I 113raig Mitchell 1 11/16/2023
Consultant/Subconsultant Name Job Number
Baxter&Woodman, Inc Summit/Dundee
Note: This is name of the consultant the CECS is being completed
for. This name appears at the top of each tab.
Remarks
The NTE for the project = $421,403.15
PAYROLL ESCALATION TABLE
CONTRACT TERM �1/1/2024
MONTHS OVERHEAD RATE 154.70%
START DATE COMPLEXITY FACTOR 0
RAISE DATE %OF RAISE 2.00%
END DATE 6/16/2024
ESCALATION PER YEAR
%of
Year First Date Last Date Months Contract
0 4/17/2023 1/1/2024 9 64.29%
1 1/2/2024 6/1/2024 5 36.43%
BLR 05514(Rev. 11/04/22)
Printed 1/19/2023 2:59 PM The total escalation = 0.71% ESCALATION
Page 1 of 6
Local Public Agency County Section Number
EI in lKane Corporate
Consultant / Subconsultant Name Job Number
Baxter&Woodman, Inc Summit/Dundee
PAYROLL RATES
ATTACHMENT C-3 - COST ESTIMATE OF CONSULTANT SERVICES (CECS) WORKSHEET FIXED RAISE
MAXIMUM PAYROLL RATE 78.00
ESCALATION FACTOR 0.71%
IDOT
CLASSIFICATION PAYROLL RATES CALCULATED RATE
ON FILE
Vice President $76.25 $76.79
En ineer V $61.11 $61.55
Engineer IV $51.45 $51.82
Engineer 1 $32.25 $32.48
Spatial Tech III $45.38 $45.70
CADD Tech III $44.75 $45.07
Marketing Prof. IV $43.50 $43.81
Marketing Prof. Ill $36.50 $36.76
BLR 05514(Rev. 11/04/22)
Printed 1/19/2023 2:59 PM RATES
Page 2 of 6
Local Public Agency County Section Number
Elgin Kane Corporate
Consultant/Subconsultant Name Job Number
Baxter& Woodman, Inc Summit/Dundee
SUBCONSULTANTS
ATTACHMENT C-3- COST ESTIMATE OF CONSULTANT SERVICES (CECS)WORKSHEET
Contribution to Prime
NAME Direct Labor Total Consultant
Soil and Material Consultants 7,739.00 773.90
Total 7,739.00 773.90
NOTE: Only subconsultants who fill out a cost estimate that splits out direct labor may be listed on
this sheet.
BLR 05514(Rev. 11/04/22)
Printed 1/19/2023 2:59 PM SUBS
Page 3 of 6
Local Public Agency County Section Number
Elgin JKane Corporate
Consultant/Subconsultant Name Job Number
Baxter&Woodman,Inc Summit/Dundee
DIRECT COSTS WORKSHEET
List ALL direct costs required for this project. Those not listed on the form will not be eligible for reimbursement by the LPA on this project.
ATTACHMENT C-3-COST ESTIMATE OF CONSULTANT SERVICES(CECS)WORKSHEET
CONTRACT
ITEM ALLOWABLE QUANTITY RATE TOTAL
Lodging TctuMal 7ost $0.00
(per GOVERNOR'S TRAVEL CONTROL BOARD) (Up to state rate maximum
Lodging Taxes and Fees Actual Cost $0.00
(per GOVERNOR'S TRAVEL CONTROL BOARD
Air Fare Coach rate,actual cost,requires minimum two weeks' $0.00
notice,with prior IDOT approval
Vehicle Mileage
er GOVERNOR'S TRAVEL CONTROL BOARD Up to state rate maximum 5550 $0.66 $3,635.25
Vehicle Owned or Leased $32.50/half day(4 hours or less)or$65/full day 237 $65.00 $15,405.00
Vehicle Rental Actual Cost(Up to$55/day) $0.00
Tolls Actual Cost $0.00
Parking Actual Cost $0.00
Overtime Premium portion(Submit supporting documentation) $0.00
Shift Differential Actual Cost(Based on firm's policy) $0.00
Overnight Delivery/Postage/Courier Service Actual Cost(Submit supporting documentation) $0.00
Copies of Deliverables/Mylars(In-house) Actual Cost(Submit supporting documentation) $0.00
Copies of Deliverables/Mylars(Outside) Actual Cost(Submit supporting documentation) $0.00
Project Specific Insurance Actual Cost $0.00
Monuments(Permanent) Actual Cost $0.00
Photo Processing Actual Cost $0.00
2-Way Radio(Survey or Phase III Only) Actual Cost $0.00
Telephone Usage(Traffic System Monitoring Only) Actual Cost $0.00
CADD Actual Cost(Max$15/hour) $0.00
Web Site Actual Cost(Submit supporting documentation) 1 $500.00 $500.00
Advertisements Actual Cost(Submit supporting documentation) $0.00
Public Meeting Facility Rental Actual Cost(Submit supporting documentation) $0.00
Public Meeting Exhibits/Renderings&Equipment Actual Cost(Submit supporting documentation) $0.00
Recording Fees Actual Cost $0.00
Transcriptions(specific to project) Actual Cost 14 $60.00 $840.00
Courthouse Fees Actual Cost $0.00
Storm Sewer Cleaning and Televising Actual Cost(Requires 2-3 quotes with IDOT approval) $0.00
Traffic Control and Protection Actual Cost(Requires 2-3 quotes with IDOT approval) $0.00
Aerial Photography and Mapping Actual Cost(Requires 2-3 quotes with IDOT approval) $0.00
Utliity Exploratory Trenching Actual Cost(Requires 2-3 quotes with IDOT approval) $0.00
Testing of Soil Samples Actual Cost $0.00
Lab Services Actual Cost(Provide breakdown of each cost) $0.00
Equipment and/or Specialized Equipment Rental Actual Cost(Requires 2-3 quotes with IDOT approval) $0.00
Electronic Field Book subscription Monthly rental 7 $500.00 $3,500.00
$0.00
$0.00
$0.00
TOTAL DIRECT COSTS: $23,880.25
(Rev. /22)
Printed 1/19/2023 2:59 PM DIRECT COSTS
Page 4 of 6
Local Public Agency County Section Number
[Elgin Kane Corporate
Consultant / Subconsultant Name Job Number
Baxter&Woodman. Inc Summit/Dundee
COST ESTIMATE WORKSHEET
ATTACHMENT C-3 - COST ESTIMATE OF CONSULTANT SERVICES (CECS)WORKSHEET
OVERHEAD RATEI 154.70%1 COMPLEXITY FACTOR
DIRECT COSTS
(not included in OVERHEAD& SERVICES BY % GRAND
TASK row totals) STAFF HOURS PAYROLL FRINGE BENEFITS FIXED FEE OTHERS TOTAL TOTAL
Project Initiation 65 16 1,098 1,699 362 3,159 0.75%
General Construction Administration 3,814 455 29,007 44,874 9,572 83,453 19.80%
Observe Construction 19,351 2170 98,526 152,420 32,514 7,739 291,199 69.10%
Project Closeout 650 120 6,583 10,183 2,172 18,938 4.49%
Subconsultant DL $773.90
Direct Costs Total=__> $23,880.25 $23,880.25 5.67%
TOTALS 2761 135,214 1 209,176 44,620 7,739 421,403 94.33%
344,390 BLR 05514(Rev. 11/04/22)
Printed 1/19/2023 2:59 PM COST EST
Page 5 of 6
Local Public Agency County Section Number
Elgin I lKane lCorporate
Consultant / Subconsultant Name Job Number
Baxter &Woodman, Inc Summit/Dundee
AVERAGE HOURLY PROJECT RATES
ATTACHEMENT C-3 - COST ESTIMATE OF CONSULTANT SERVICES (CECS) WORKSHEET
SHEET 1 OF 1
General Construction
PAYROLL AVG TOTAL PROJ.RATES Project Initiation Administration Observe Construction Project Closeout
HOURLY Hours % Wgtd Hours % Wgtd Hours % Wgtd Hours % Wgtd Hours % Wgtd Hours % Wgtd
CLASSIFICATION RATES Part. Avg Part. Avg Part. Avg Part. Avg Part. Avg Part. Avg
Vice President 76.79 294.0 10.65% 8.18 10 62.50% 48.00 264 58.02% 44.56 20 16.67% 12.80
Engineer V 61.55 92.0 3.33% 2.05 2 12.50% 7.69 10 2.20% 1.35 80 3.69% 2.27
Engineer IV 51.82 1,454.0 52.66% 27.29 4 25.00% 12.95 40 8.79% 4.56 1330 61.29% 31.76 80 66.67% 34.55
Engineer 1 32.48 760.0 27.53% 8.94 760 35.02% 1 11.38
Spatial Tech III 45.70 66.0 2.39% 1.09 1 66 1 14.51% 6.63
CADD Tech III 45.07 40.0 1.45% 0.65 20 1 4.40% 1.98 20 16.67110 7.51
Marketing Prof. IV 43.81 15.0 0.54% 0.24 15 3.30% 1.44
Marketing Prof. III 36.76 40.0 1.45% 0.53 40 8.79% 3.23
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
TOTALS 2761.0 100% $48.97 16.0 100.00% 1$68.641 455.0 1 100% $63.75 2170.0 100% 1 $45.40 120.0 100% $54.86 0.0 04'0 $0.00
Printed 1/19/2023 2:59 PM BLR 05514(Rev. 11/04/22)
Page 6 of 6 AVG 1
City 9 of Elgin - Summit Street and Dundee Avenue Intersection Improvements Enterprise St.
Attachment D - Project Location Map
Plum Ct,
Project Limits
�uiE��iiit 5l.
-� Summic St.
c
a
O
Seneca St.
F ernont St.