Loading...
HomeMy WebLinkAbout23-39 Resolution No. 23-39 RESOLUTION AUTHORIZING EXECUTION OF AN AMENDMENT AGREEMENT NO. 1 WITH CORDOGAN CLARK&ASSOCIATES, INC. (A/E) & COROGAN CLARK CONSULTING SERVICES, INC. (CM) FOR ADDITIONAL SUPPLEMENTAL PROFESSIONAL CONSULTING SERVICES IN CONNECTION WITH THE ELGIN HEMMENS CULTURAL CENTER NORTH LOBBY RENOVATION AND ADDITION PROJECT BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that pursuant to Elgin Municipal Code Section 5.02.020B(9)the City Council hereby finds that an exception to the requirements of the procurement ordinance is necessary and in the best interest of the city; and BE IT FURTHER RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS,that Richard G. Kozal, City Manager, and Kimberly A. Dewis, City Clerk, be and are hereby authorized and directed to execute an Agreement on behalf of the City of Elgin with Cordogan Clark & Associates, Inc. (A/E) & Corogan Clark Consulting Services, Inc. (CM), for additional supplemental professional consulting services in connection with the Elgin Hemmens Cultural Center north lobby renovation and addition project, a copy of which is attached hereto and made a part hereof by reference. s/David J. Kaptain David J. Kaptain, Mayor Presented: March 8, 2023 Adopted: March 8, 2023 Omnibus Vote: Yeas: 9 Nays: 0 Attest: s/Kimberly Dewis Kimberly Dewis, City Clerk AMENDMENT AGREEMENT NO. 1 THIS AMENDMENT AGREEMENT No. 1 is hereby made and entered into this _15th day of_February_, 2023, by and between the City of Elgin, Illinois, a municipal corporation(hereinafter referred to as the"City"), and Cordogan Clark & Associates, Inc (A/E)& Corogan Clark Consulting Services, Inc(CM) , an (architecture, engineering and construction management company(hereinafter referred to as"Consultant"). WHEREAS, the City and Consultant hereto have previously entered into an agreement dated August 10, 2022 (hereinafter referred to as "Original Agreement"), wherein the City engaged the Consultant to furnish certain professional services in connection with the Elgin Hemmens Cultural Center north lobby renovation and addition project ereinafter referred to as the"Project"); and WHEREAS, the City has determined that the proposed scope of the Project should be further modified to include the additional Supplemental Professional Consulting Services described herein(hereinafter referred to as"Supplemental Services"); and WHEREAS, the Original Agreement provides for a maximum payment of$471,878.00 and WHEREAS,the parties hereto have determined and agree that the total maximum payment for the Supplemental Services described in this Amendment Agreement No. I shall be in the amount of$1,067,350; and WHEREAS,the changes contemplated by this Amendment Agreement No. I are germane to the Original Agreement as signed;and this Amendment Agreement No.I is in the best interests of City and is authorized by law. NOW,THEREFORE,for and in consideration of the mutual undertakings provided herein, and other good and valuable consideration,the receipt and sufficiency of which is hereby mutually acknowledged,the parties hereto agree as follows: 1. The above recitals are incorporated into and made part of this Agreement as if fully recited herein. 2. Section 1 of the Original Agreement is hereby further amended by adding a new additional subparagraph C thereto to read as follows: "C. The CONSULTANT shall provide the additional Consulting services to include construction management, project management, project administration and QA/QC services for the CITY as part of the Hemmens Cultural Center north lobby renovation and addition project as outlined and described in Attachment C-1, attached hereto and made a part hereof (hereinafter referred to as the"Additional Supplemental Services"). 3. That Section 2 of the Original Agreement is hereby further amended by adding.; the following to the end of Subparagraph B: "B. Consultant shall provide the Supplemental Services provided for in Amendment Agreement No. 1 in accordance with the schedule outlined herein and detailed in Attachment D-1." 4. That Section 4 of the Original Agreement is hereby amended by adding the following paragraph and Payment Schedule to read as follows: "E. For services described in Attachments C- 1 and E-1, Consultant shall be paid at an hourly rate for the classifications of personnel who perform work on this Project;provided, however,that Consultant shall be paid a total maximum fee of$1,067,350 for the services to be provided pursuant to this Amendment Agreement No. 1,regardless of the actual time or actual costs incurred by the Consultant unless substantial modifications and scope of work are authorized in writing by the City and approved pursuant to a further written amendment to this Agreement.For the purposes of clarification,the total fees to be paid to the Consultant pursuant to the Original Agreement and this Amendment Agreement No. 1 now total $1,539,228. The detailed basis of the additional fee associated with Amendment Agreement No. 1 is included in Attachment E-1 and is based on hourly rates of personnel utilized. The Attachment E-1 dated January 31,2023 will be utilized for this Project." Payment Schedule for Supplemental Services ESTIMATED ESTIMATED VALUE ESTIMATED INVOICE DATE %COMPLETE OF WORK COMPLETE VALUE April 26, 2023 34% 362,899 362,899 June 5, 2023 10% 106,735 106,735 August 7, 2023 10% 106,735 106,735 October 23, 2023 10% 106,735 106,735 December 18, 2023 10% 106,735 106,735 February 5, 2024 11% 117,078.50 117,078.50 April 12, 2024 11% 117,078.50 117,078.50 June 3, 2024 4% 42,694 42,694 Total 100% $1,067,350 $ 1,067,350 5. That except as amended in this Amendment Agreement No. 1 the Original Agreement shall remain in full force and effect. 6. That in the event of any conflict between the terms of the Original Agreement and the provisions in this Amendment Agreement No. 1, the provisions of this Amendment Agreement No. 1 shall control. 7. This Amendment Agreement may be executed in counterparts, each of which shall be an original and all of which shall constitute one and the same agreement. For the purposes of executing this Amendment Agreement, any signed copy of this Amendment Agreement transmitted by fax machine or e-mail shall be treated in all manners and respects as an original document. The signature of any party on a copy of this Amendment Agreement transmitted by fax machine or e-mail shall be considered for these purposes as an original signature and shall have the same legal effect as an original signature. Any such faxed or e-mailed copy of this Amendment Agreement shall be considered to have the same binding legal effect as an original document. At the request of either party any fax or e-mail copy of this Amendment Agreement shall be re-executed by the parties in an original form. No party to this Amendment Agreement shall raise the use of fax machine or e-mail as a defense to this Amendment Agreement and shall forever waive such defense. IN WITNESS WHEREOF, the undersigned have entered into and executed this Amendment Agreement No. 1 as of the date and year first written above. CITY ,IN CONSULTANT By: By: az."a. City Manager Its(insert title) Executive Vice President A s Attest: its ��eht �L City Clerk Its Executive Assistant Additional Supplemental Services- Attachment C-1 Elgin Hemmens Cultural Center North Lobby Renovation and Addition Project Project site:45 Symphony Way, Elgin,IL,60120. Construction Management Responsibilities: 1. The construction management services to be provided by the Consultant,Cordogan Clark Consulting Services, Inc,are as enumerated below. 2. The Consultant shall provide organization, personnel and management to carry out the requirements of this Amendment in an expeditious and economical manner consistent with the interests of the City. 3. All work will be performed under the direction of Cultural Arts&Special Events Director, Amanda Harris. 4. The Consultant shall submit a list of prospective bidders and a bidding schedule for the City's review and approval. 5. The Consultant shall solicit bidders'interest in the Project.The Consultant shall assist the City in issuing bidding documents to bidders and conduct pre-bid conferences with prospective bidders. The Consultant shall assist the City with the receipt of questions from bidders and the issuance of addenda in a timely manner. 6. The Consultant shall receive bids,prepare bid analyses and make recommendations to the City for the City's award of Contracts in accordance with the project schedule and city council meeting schedule. 7. The Consultant shall conduct pre-award conferences with successful bidders.The Consultant shall advise the City of any reasonable objections to the proposed list of Subcontractors and material suppliers. 8. The Consultant shall make recommendations to the City regarding the assignment of responsibilities for providing temporary Project facilities and services for common use of the Contractors.The Consultant shall verify that the requirements and assignment of responsibilities are included in the proposed Contract Documents. 9. The Consultant shall advise the City on the division of the Project into separate contracts or various categories for work including method be used for selecting Contractors and awarding contracts. 10.The Consultant shall make recommendations to the City regarding the allocation of responsibilities for Project conditions among the Contractors. 11.The Consultant shall assist the City in obtaining applicable building permits and special permits for permanent improvements,excluding permits required to be obtained directly by the various Contractors. Scope of Services during Construction Phase: 1. The Consultant shall prepare a Project construction schedule providing for each scope of Work, including phasing of construction,times for commencement and completion required of each separate Contractor,ordering and delivery of materials requiring long-lead time and the occupancy requirements of the City. 2. The Consultant shall provide the Project construction schedule for each set of Contract Documents. 3. The Consultant shall provide administrative,management and related services to endeavor to coordinate the activities of the Contractors with each other and with those of the City and the Consultant to complete the Project in accordance with the latest approved estimate of Construction Cost,the Project construction schedule and the Contract Documents. 4. The Consultant shall schedule and conduct preconstruction,construction and progress meetings with the City and the Contractors to discuss such matters as procedures,progress and scheduling. The Consultant shall prepare and promptly distribute minutes to the City and Contractors. 5. Utilizing the Construction Schedules provided by the Contractors,the Consultant shall update the Project construction schedule incorporating the activities of the Contractors on the Project, including activity sequences and durations,allocation of labor and materials, processing of Shop Drawings, Product Data and Samples,and delivery of products requiring long-lead time and procurement.The Project construction schedule shall include the City's occupancy requirements showing portions of the Project having occupancy priority.The Consultant shall update and reissue the Project construction schedule as required to show current conditions. If an update indicates the previously approved Project construction schedule may not be met, the Consultant shall recommend corrective action to the City. 6. Consistent with the Bidding Documents,and utilizing information from the Contractors,the Consultant shall endeavor to coordinate the sequence of construction and assignment of space in areas where multiple Contractors are performing Work. 7. The Consultant shall monitor the approved estimate of Construction Cost.The Consultant shall show actual costs for activities in progress and estimates for uncompleted tasks. 8. The Consultant shall develop cash flow reports and forecasts for the Project and advise the City as to variances between actual and budgeted or estimated costs. 9. The Consultant shall maintain cost accounting records on authorized Work performed under unit costs, additional Work performed on the basis of actual costs of labor and materials,or other Work requiring accounting records. 10. The Consultant shall record the progress of the Project with written progress reports to the City including information on each Contractor's Work,as well as the entire Project,showing percentages of completion. 11.The Consultant shall keep a daily log containing a record of weather, Contractor's Work on the site, number of workers,identification of equipment,Work accomplished,problems encountered,and other similar relevant data as the City may require. 12.The Consultant shall maintain at the Project site,on a current basis:one record copy of all Contracts, Drawings,Specifications,addenda,Change Orders and other Modifications,in good order and marked to record all changes made during construction;Shop Drawings; Product Data;Samples;submittals;purchases;other related documents and revisions that arise out of the Contracts or Work.The Consultant shall maintain records, in duplicate,of principal building layout lines,elevations of the bottom of footings,floor levels and key site elevations certified by a qualified surveyor or professional engineer.The Consultant shall make all such records available to the City and, upon completion of the Project,shall deliver them to the City. The City reserves the right to perform Work related to the Project with the City's own forces,and to award contracts in connection with the Project that are not part of the Consultant's responsibilities under this Amendment.The Consultant shall notify the City if any such independent action will in any way interfere with the Consultant's ability to perform under this Amendment. City of Elgin a CORDOGAN CLARK �. Hemmens Auditorium Addition Project Schedule EG I N 2/3/23 11 L `•RCNItEC1URE•ENGINEERING•CONSrRUCLION ..a fltl5 ATTACHMENT r}t 'ID Task Name Duration Stan Finish 2 Qtr 1,2023 Otr 2,2023 Qtr 3,2023 DO 4,2023 Qtr 1,2024 Qlr 2,2024 Qtr 3,2024 Qt D J F M A M J J A S O N D J F M A M J J A S O 1 City of Elgin Hemmens Project 205 days 7/27/22 519123 Hemmens Project s/9 2 City Approval of Proposal 15 days 7/27/22 8/16/22 ' Schematic Design Updates 57 days 8/17122 11/3122 s 3 ° Design Development 63 days 11/4122 1131123 Development -------1 1131 70 Design Development 53 days 11/4/22 1/17/23 )evelopment MMMMM 1/17 „ DD Estimate&Construction Schedule 5 days 1/13/23 1/19/23 to&Construction Schedule 1/13 ■ 1119 72 Internal DD Review 5 days 1/18/23 1/24/23 Internal DD Review 1118 ■ 1124 13 Client Review and Approval of DD 5 days 1/25/23 1/31/23 Review and Approval of DD 1125 M 1131 14 Construction Documents 60 days 1118123 4111123 Construction Documents 1/18 w---------V 4/11 76 CD's Bid Group 1-Full Site&Building Scope 50 days 1/18123 3/28/23 d Group 1-Full Site&Building Scope 1118 mmomamm 3/28 75 COE CM Services Approved 1 day 2/23/23 2/23/23 COE CM Services Approved A 2/23 17 Scopes/Constructability,QA/QC-BG 1 5 days 3/29/23 4/4/23 Scopes/Constructability,QA/QC-BG 1 3129 M 4/4 18 Final Modifications-BG 1 5 days 4/5/23 4/11/23 Final Modifications-BG 1 4/5 ■4111 19 Permitting 30 days 3129123 519/23 Permitting 3129 W----W 5/9 20 Full Building Permit Review&Responses 30 days 3/29123 5/9/23 Full Building Permit Review&Responses 3/29 519 21 Site/Fdns Work Permit Review&Responses 20 days 3/29/23 4125/23 Site/Fdns Work Permit Review&Responses 3129 4/25 22 Fast Track Bidding 25 days 3/29123 512/23 Fast Track Bidding 3129 r1 5/2 23 BG1-Full Site&Building-Bidding 15 days 3/29/23 4/18/23 BG1-Full Site&Building-Bidding 3129 M 4118 24 BG1-Scope Review-Full Site&Building 4 days 4/19/23 4/24/23 BG1-Scope Review-Full Site&Building 4119 ®4/24 25 BG1-COE Bid Recommendation Review 5 days 4/25/23 5/1/23 BG1-COE Bid Recommendation Review 4/25 M 5/1 Page 1 City of Elgin a CORDOGAN CLARK 1Hemmens Auditorium Addition Project Schedule ELG I N 2/3/23 `AI1MUCIM•Eli.I.HRING•1:.1JMuCU.. ID Task Name Duration Start Finish ?2 Qtr 1.2023 Otr 2,2023 Qtr 3,2023 Qtr 4,2023 Qtr 1,2024 Qtr 2,2024 Qtr 3,2024 ot D J F M A M J J A S O N D J F M__.A M .__J. _._J.. A S O 26 BG1-City Council Approval Full Building 1 day 5/2/23 5/2/23 BG1-City Council Approval Full Building ♦ 5/2 2' Shop Drawings&Procurement 172 days 5/3123 12128123 Shop Drawings S Procurement 5/3 12/28 28 Structural Steel 87 days 513/23 8131/23 Structural steel s13 e/31 29 Prepare Shop Drawings 4 wks 5/3/23 5/30/23 Prepare Shop Drawings 5/3 5/30 30 Submit Shop Drawings 1 day 5/31/23 5/31/23 Submh Shop Drawings 5/31 1 5/31 31 Shop Drawing Review 15 days 6/1123 6/21/23 Shop Drawing Review 6/1 tilillillit 6/21 32 Return Shop Drawings 1 day 6/22/23 6/22/23 Return Shop Drawings 6/22 1 6122 33 Detail Fabricate and Delivery 10 wks 6/23/23 8/31/23 Detail Fabricate and Delivery 6123 8/31 34 Curtain WallNindows 172 days 513123 12/28123 Curtain Wall/Windows 5/3 12/28 36 Prepare Shop Drawings 15 days 5/3/23 5/23/23 Prepare Shop Drawings 6/3 MM 6123 x Submit Shop Drawings 1 day 5/24/23 5/24/23 Submit:Shop Drawings 5/24 1 5/24 37 Shop Drawing Review 15 days 5/25/23 6/14/23 Shop Drawing Review 5/25 6/14 38 Return Shop Drawings 1 day 6/15/23 6/15/23 Return Shop Drawings 6116 1 6115 39 Fabrication,Order and Delivery 28 wks 6/16/23 12/28/23 Fabrication,Order and Delivery 6/16 12/28 40 Rebar/Concrete Mix Design Etc. 77 days 513123 8117/23 Rebar/Concrete Mix Design Etc. 513 $117 41 Prepare Shop Drawings 4 wks 5/3/23 5/30/23 Prepare Shop Drawings 5/3 5130 42 Submit Shop Drawings 1 day 5131/23 5/31/23 Submit Shop Drawings 6131 1 5131 43 Shop Drawing Review 15 days 6/1/23 6/21/23 Shop Drawing Review 611 6/21 Return Shop Drawings 1 day 6/22/23 6/22/23 Return Shop Drawings 6/22 1 6122 46 Order and Delivery 8 wks 6/23/23 8/17/23 Order and Delivery 6/23 8/17 Page 2 City of Elgin CORDOGAN CLARK �. Hemmens Auditorium Addition Project Schedule ELGIN213/23 11•RCNIIECIURE•ENGINEERING CONS1RUCilON ID Task Name Duration Start Finish ?2 Ott 1,2023 Qtr 2.2023 Olt 3,2023 Ott 4,2023 Ott 1,2024 Ott 2.2024 Ott 3.2024 at D J F M A M J J A S O N D J F M A M J J A S O 46 Mechanical Equipment 162 days 513123 12/14/23 Mechanical Equipment 5/3 12/14 47 Prepare Shop Drawings 20 days 5/3123 5/30123 Prepare Shop Drawings 513 5130 48 Submit Shop Drawings 1 day 5/31/23 5/31/23 Submit Shop Drawings 5/31 1 5/31 49 Shop Drawing Review 15 days 6/1/23 6/21/23 Shop Drawing Review 611 6/21 so Return Shop Drawings 1 day 6/22/23 6/22/23 Return Shop Drawings 6122 1 6122 51 Order and Delivery 25 wks 6/23/23 12/14/23 6123 Order and Delivery 12114 u I Electric(Switch gear) 162 days 5/3123 12114123 Electric(Switch gear) 5/3 12/14 Prepare Shop Drawings 10 days 5/3/23 5/16/23 Prepare Shop Drawings 5/3= 5116 54 Submit Shop Drawings 1 day 5/31/23 5/31/23 Submit Shop Drawings 5/31 1 5/31 55 Shop Drawing Review 15 days 6/1/23 6/21/23 Shop Drawing Review 6/1 ti,6/21 56 Return Shop Drawings 1 day 6/22/23 6/22/23 Return Shop Drawings 6122 1 6/22 Order and Delivery 25 wks 6/23/23 12/14/23 Order and Delivery 6/23 12/14 sfi Construction 341 days 5110/23 8/28124 Construction 5/10 8/28 59 Mobilization 20 days 5110/23 616123 Mobilization 5/10 W--W 6/6 60 Survey/Staking 3 days 5/10/23 5/12/23 Survey/Staldng 5/10 1 5/12 81 Set Up Site Office 3 days 5/10/23 5/12/23 Set up site Office 5110 1 5/12 62 Temp Partitions 5 days 5/10/23 5/16/23 Temp Partitions 5110 0 5116 63 Demo 10 days 5/17/23 5/30/23 Demo 5117 = 5/30 64 Site Clearing 5 days 5/31/23 6/6/23 Site Clearing 5131 ■ 6/6 65 Earth Excavation/Foundations 72 days 60123 9114123 Earth Excavation/Foundations 617 W------------v 9r14 Page 3 City of Elgin a CORDOGAN CLARK 1Hemmens Auditorium Addition Project Schedule ELG I N 2/3/23 `�RCNIiEC1URE EN6INEERIN6 CONliRUCTION ID Task Name Duration Start Finish 2 Otr 1,2023 Otr 2,2023 Olr 3,2023 Otr 1,2023 Otr 1,2024 Qtr 2,202I 4 D J F M A M J J A S O I N I D J F___M :_A M 66 Basement/Foundation Excavation 25 days 6/7/23 7/11/23 Bassment/Foundation Excavation 617 7111 67 Site Excavation 10 days 7/12/23 7/25123 Site Excavation 7112 = 7125 68 Underground Utilities 15 days 7/26/23 8/15/23 Underground Utilities j 7/26 tillillit 8/15 69 Caisson Foundations 30 days 8/4/23 9/14/23 Caisson Foundations 8/4 9114 70 Building Shell 105 days 918123 2/1124 Building shell 9/8 211 71 Rough-in Underground Plumbing/Electric 20 days 9/8/23 10/5123 Rough-in Underground Plumbing/Electric 9/8 iiiiiiiiiiia 1015 72 Prep Basement Floor 5 days 10/6123 10/12/23 Prep Basement Floor 10/6■ 10/12 73 Pour Basement Floor Slab 4 days 10/13/23 10/18/23 Pour Basement Floor Slab 10/13 N 10/18 74 Structural Steel 35 days 10/19/23 12/6/23 Structural steel 10/19 12/6 76 Roof Deck 5 days 12/7/23 12/13/23 Roof Deck 1217 0 12/13 77 Roofing 6 days 12/12/23 12/19/23 12/1Roofing �n 2/19 75 Curtain Wall 35 days 12/15/23 2/1/24 Curtain wall 12/15 2/1 78 Interior MEP,Carpentry and Finishes 139 days 1119124 7131124 Interior MEP,Carpentry and Finishes 1/19 7131 79 Rough Framing 25 days 1/19/24 2/22/24 Rough Framing 1/19 ® 2/22 81 Fire Protection Piping 15 days 2/9/24 2/29/24 Fire Protection Piping 2/9 8i• 2129 80 Install Door Frames 5 days 2/23/24 2/29/24 Install Door Frames 2/23 ■ 2/29 82 Rough in Mechanical Piping&Ductwork 25 days 2/23/24 3/28/24 Rough in Mechanical Piping&Ductwork 2123 [i! 3/28 83 Rough in Electric&Plumbing 25 days 3/22/24 4/25/24 Rough in Electric&Plumbing 3/22 ttta®4/25 84 HVAC Equipment Install&Hookups 25 days 3/29/24 512/24 HVAC Equipment Install&Hookups 3/29 ti 6/2 85 Drywall 22 days 4/19/24 5/20/24 Drywall 4/19 Billilligi s/20 Page 4 City of Elgin a CORDOGAN CLARK �. Hemmens Auditorium Addition Project Schedule ELG I N 2/3/23 `.RCNIIECI.H•rNG,.EMNG CON91RUCiiON ID Task Name Duration Start Finish 22 Qtr 1.2023 Qtr 2.2023 Qtr 3.2023 Qtr 4,2023 Otr 1,2024 Qtr 2.2024 Otr 3,2024 Qt D J F M A M J J A S O N D J F M A M J J A S _ O _ B7 Painting 22 days 5/14/24 6/12/24 Painting 5/14 6112 88 Electric Switchgear 10 days 5/21/24 6/3/24 Electric Switchgear 5/21 = 6/3 88 Ceilings 20 days 616/24 7/3/24 Ceilings 6/6 � 7/3 92 MEP Trim Work 25 days 6/13/24 7/17/24 MEP Trim Work 6/13 7/17 89 Flooring 10 days 6/27/24 7/10/24 Flooring 6127 =7/10 so Casework 15 days 7/4/24 7/24/24 Casework 7/4 tillillill 7124 e1 Doors/Finished Carpentry 15 days 7/4/24 7/24/24 Doors/Finished Carpentry 7/4 7/24 Paint Touch-ups&Final Finishes 15 days 7/11/24 7/31/24 Paint Touch-ups&Final Finishes 7/11 tillillit 7/31 IN Operations Start Up 23 days 7118/24 8119124 Operations Start Up 7118 W---W 8/19 100 Technology Implementation 10 days 7/18/24 7/31/24 Technology Implementation 7/13 = 7/31 101 FF&E Installation 4 days 8/1/24 8/6/24 FF&81nM 8116tion 1e2 Move-In 8 days 817/24 8/16/24 9 Move-In 916 103 First Day of Operations 1 day 8/19/24 8/19/24 First Day of Operations ♦ 8/19 e4 Project Close-Out 20 days 811124 8128124 Project Close-out 8/1 r1 8/28 95 Punchlist 20 days 8/1/24 8/28/24 Punchlist 811 8/28 96 Inspection and Testing 5 days 8l1/24 8/7/24 Inspection and Testing $n ■ $n 97 Systems Training Systems Training 5 days 8/8/24 8/14/24 8/8 ■ 8/14 98 Substantial Completion 1 day 8/15/24 8/15/24 Substantial Completion ♦ 8115 Page 5 Elgin Hemmens Auditorium Addition Construction Management General a CORDOGAN CLARK Conditions Labor Costs&CM Fees ARCH17ECTUPE.ENGINEEPING•CONSTRUCTION ATTACHMENT E-1 January31,2023 Elgin Hemmens Auditorium Addition #of Weeks To Shedule Position Hrly Rate Hrs/Week Weekly Cost Complete TOTALS of Payments Approx. $2,400 Project Executive/Director $150.00 4 $600.00 56 $33,600 Month per Month during Construction Approx. Project Manager/Supt. $135.00 40 $5,400.00 56 $302,400 $21,600 per Month during Construction Approx. Project Engineer $65.00 24 $1,560.00 50 $78,000 $5,200per Month during Construction Approx. Project Administration $60.00 12 $720.00 56 $40,320 12,10 per Month during Construction Total General Conditions Labor: $454,320 Approx. General Condition's Reimbursables: $14,100 per $197,253 Month during Construction Total General Condition's: $651,573 Approx. CM Fee: 4.00% $415,777 129,700 per Month during Construction ADDITIONAL CM SERVICES ESTIMATED COSTS: $1,067,350 ESCALATION: $550,000 TOTAL CONSTRUCTION COST: $12,011,777 SOFT COST:1 $884,083 TOTAL PROJECT COST:1$12,895,860 Project Phase Durations PHASE Duration in Months Duration in Weeks Preconstruction 4 16 Bidding/Bid Analyis 1.5 6 Procurement/Shop Drawings 2 8 Construction 14 56 Post Construction 1 4 1 Elgin Hemmens Auditorium Addition �CORDOGAN CLARK Construction Management Cost of the Work General �RCNlif C1URF•ENGINEERING CONSfPUt iION Conditions Reimbursables I, January 31,2023 Elgin Hemmens Auditorium Addition Description Monthly #of Months TOTALS Cost To Complete Jobsite Set up and Take Down $3,200.00 2 $6,400.00 Jobsite Temporary Office $1,100.00 14 $15,400.00 Vehicles, Milage,Tolls $125.00 14 $1,750.00 Site Telephone, Cell Phones $150.00 14 $2,100.00 Postage/Deliveries $75.00 14 $1,050.00 Installation of Temporary Power(Utilize Existing) N/A Job Site Utility Bills (Utilize Existing) N/A Job Equipment $100.00 14 $1,400.00 Field Office Supplies $100.00 14 $1,400.00 Meals/Lodging N/A Web Camera N/A Final Bldg. Clean-up $9,000.00 1 $9,000.00 Dumpsters $650.00 14 $9,100.00 Temporary Toilets $400.00 14 $5,600.00 Temporary Board-up/protection $20,000.00 1 $20,000.00 Barricades/Traffic/Flagman $750.00 10 $7,500.00 Site Security/Watchman N/A Dust Control $350.00 8 $2,800.00 Site Cleaning Labor In Labor Layout/Survey $5,000.00 1 $5,000.00 OSHA Barricades $5,000.00 1 $5,000.00 Site &OSHA Signage $1,250.00 1 $1,250.00 Site Building Restoration or Repair N/A Safety& Supplies $300.00 4 $1,200.00 Temporary Fencing $7,200.00 1 $7,200.00 Small Tools & Incidentals $100.00 14 $1,400.00 Equipment & Hoisting N/A Field Office Equipment $100.00 14 $1,400.00 Project Sign $1,493.00 1 $1,493.00 Temporary Storage Trailers $0.00 Printing& Reproductions $100.00 14 $1,400.00 Photography N/A Temporary Roads N/A Legal & Consulting Fees N/A Weather Protection N/A Testing& Inspections $840.00 9 $7,560.00 Permits By Owner Temporary Heat I N/A 2 Elgin Hemmens Auditorium Addition �CORDOGAN CLARK Construction Management Cost of the Work General Conditions Reimbursables `ARCHITECTURE•ENGINEERING.CONSTRUCTION January 31,2023 Elgin Hemmens Auditorium Addition Description Monthly #of Months TOTALS Cost To Complete Site Furnishings N/A LEED Documentation N/A Street Sweeping $750.00 5 $3,750.00 Insurance $80,000.00 1 $80,000.00 Miscellaneous $250.00 14 $3,500.00 TOTAL: $197,253.00 Schedule: PHASE Duration in Months Preconstruction 4 Bidding/Bid Analyis 1.5 Procurement/Shop Drawings 2 Construction 14 Post Construction 1 3