HomeMy WebLinkAbout23-26 Resolution No. 23-26
RESOLUTION
AUTHORIZING EXECUTION OF AN AGREEMENT WITH UPLAND DESIGN, LTD FOR
PROFESSIONAL SERVICES IN CONNECTION WITH MILLENNIUM PARK
RENOVATION
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS,
that pursuant to Elgin Municipal Code Section 5.02.020B(9)the City Council hereby finds that an
exception to the requirements of the procurement ordinance is necessary and in the best interest of
the city; and
BE IT FURTHER RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN,
ILLINOIS,that Richard G. Kozal, City Manager, and Kimberly A. Dewis, City Clerk, be and are
hereby authorized and directed to execute an Agreement on behalf of the City of Elgin with Upland
Design, Ltd., for professional services in connection with Millennium Park renovation, a copy of
which is attached hereto and made a part hereof by reference.
s/David J. Kapta_in
David J. Kaptain, Mayor
Presented: February 22, 2023
Adopted: February 22, 2023
Omnibus Vote: Yeas: 8 Nays: 0
Attest:
s/Kimberly Dewis
Kimberly Dewis, City Clerk
AGREEMENT
THIS AGREEMENT("Agreement")is made and entered into this 22ud day of February ,
2023,by and between the CITY OF ELGIN,an Illinois municipal corporation(hereinafter referred
to as "CITY") and Upland Design, Ltd., an Illinois corporation (hereinafter referred to as
"LANDSCAPE ARCHITECT"').
WHEREAS, the CITY desires to engage the LANDSCAPE ARCHITECT to furnish
certain professional services in connection with Millennium Park Renovation(hereinafter referred
to as the"PROJECT"); and
WHEREAS, the LANDSCAPE ARCHITECT represents that it is in compliance with
Illinois Statutes relating to professional registration of individuals and has the necessary expertise
and experience to furnish such services upon the terms and conditions set forth herein below.
NOW,THEREFORE,it is hereby agreed by and between the CITY and the LANDSCAPE
ARCHITECT that the CITY does hereby retain the LANDSCAPE ARCHITECT for and in
consideration of the mutual promises and covenants contained herein, the sufficiency of which is
hereby acknowledged to perform the services relating to the PROJECT as described herein,subject
to the following terms and conditions and stipulations,to-wit:
1. SCOPE OF SERVICES
A. All work hereunder shall be performed under the direction of the Parks and
Facilities Superintendent of the CITY, herein after referred to as the
"SUPERINTENDENT".
B. The scope of work shall include design development to prepare fmal design and
construction documents for the City's preferred design alternative. LANDSCAPE
ARCHITECT's services to be performed will include architectural design,
permitting, and construction bidding coordination.
C. A detailed Scope of Services is attached hereto as Attachment A.
2. PROGRESS REPORTS
A. An outline project milestone schedule and project schedule for the PROJECT is
included as Attachment B,attached hereto. Progress will be recorded on the project
schedule and submitted monthly as a component of the Status Report described in
2.0 below.
B. The LANDSCAPE ARCHITECT will submit to the SUPERINTENDENT monthly
a status report keyed to the project schedule. A brief narrative will be provided
identifying progress, fmdings and outstanding issues.
3. WORK PRODUCT
All work product prepared by the LANDSCAPE ARCHITECT pursuant hereto including,
but not limited to, reports, plans, designs, calculations, work drawings, studies,
photographs,models and recommendations shall be the property of the CITY and shall be
delivered to the CITY upon request of the SUPERINTENDENT; provided, however, that
the LANDSCAPE ARCHITECT may retain copies of such work product for its records.
LANDSCAPE ARCHITECT's execution of this Agreement shall constitute LANDSCAPE
ARCHITECT's conveyance and assignment of all right,title and interest,including but not
limited to any copyright interest, by the LANDSCAPE ARCHITECT to the CITY of all
such work product prepared by the LANDSCAPE ARCHITECT pursuant to this
Agreement. The CITY shall have the right either on its own or through such other
consultants as determined by the CITY to utilize and/or amend such work product. Any
such amendment to such work product shall be at the sole risk of the CITY. Such work
product is not intended or represented to be suitable for reuse by the CITY on any extension
to the PROJECT or on any other project, and such reuse shall be at the sole risk of the
CITY without liability or legal exposure to the LANDSCAPE ARCHITECT.
4. PAYMENTS TO THE CONSULTANT(Lump Sum Method)
A. The City shall reimburse the LANDSCAPE ARCHITECT for services under this
Agreement a lump sum of Sixty Thousand Two Hundred Dollars ($60,200),
regardless of the actual costs incurred by the LANDSCAPE ARCHITECT unless
substantial modifications to the scope of the work are authorized in writing by the
SUPERINTENDENT, and approved by way of written amendment to this
Agreement executed by the parties.
B. For outside services provided by other firms or subcontractors,the CITY shall pay
the LANDSCAPE ARCHITECT the invoiced fee to the LANDSCAPE
ARCHITECT. The costs for any such outside services are included within the total
lump sum amount provided for in paragraph 4.A above.
C. Reimbursable expenses shall include postage, printing of drawings, and mileage
reimbursement. The costs of any such reimbursable expenses are not included
within the total lump sum amount provided for in paragraph 4.A above and shall be
invoiced separately by the LANDSCAPE ARCHITECT at LANDSCAPE
ARCHITECT's direct cost. Mileage reimbursement will be at current IRS rates.
The total costs of any such reimbursable expenses shall not exceed the total amount
of $1,000.00, regardless of the actual costs incurred by the LANDSCAPE
ARCHITECT.
D. The CITY shall make periodic payments to the LANDSCAPE ARCHITECT based
upon actual progress within thirty (30) days after receipt and approval of invoice.
Said periodic payments to the LANDSCAPE ARCHITECT shall not exceed the
amounts shown in the following schedule,and full payments for each task shall not
be made until the task is completed and accepted by the SUPERINTENDENT.
-2 -
DATE PROJECT COMPONENT FEE
03/01/23 Design Development $12,040
Construction Plans, Specifications,
04/01/23 and Bid Proposal $24,080
05/01/23 Permitting $5,020
05/22/23 Bidding $3,010
10/02/23 Construction Observation $16,050
5. INVOICES
A. The LANDSCAPE ARCHITECT shall submit invoices in a format approved by
the CITY. Progress reports(2.0 above)will be included with all payment requests.
B. The LANDSCAPE ARCHITECT shall maintain records showing actual time
devoted and cost incurred. The LANDSCAPE ARCHITECT shall permit the
authorized representative of the CITY to inspect and audit all data and records of
the LANDSCAPE ARCHITECT for work done under this Agreement. The
LANDSCAPE ARCHITECT shall make these records available at reasonable
times during the Agreement period and for one (1) year after termination of this
Agreement.
6. TERMINATION OF AGREEMENT
Notwithstanding any other provision hereof, the CITY may terminate this Agreement at
any time upon fifteen (15) days prior written notice to the LANDSCAPE ARCHITECT.
In the event that this Agreement is so terminated, the LANDSCAPE ARCHITECT shall
be paid for services actually performed and reimbursable expenses actually incurred prior
to termination,except that reimbursement shall not exceed the task amounts set forth under
paragraph 4 above.
7. TERM
This Agreement shall become effective as of the date the LANDSCAPE ARCHITECT is
given a notice to proceed and,unless terminated for cause or pursuant to Paragraph 6,shall
be deemed concluded on the date the CITY determines that all of the LANDSCAPE
ARCHITECT's work under this Agreement is completed. A determination of completion
shall not constitute a waiver of any rights or claims which the CITY may have or thereafter
acquire with respect to any term or provision of this Agreement.
-3 -
8. NOTICE OF CLAIM
If the LANDSCAPE ARCHITECT wishes to make a claim for additional compensation as
a result of action taken by the CITY, the LANDSCAPE ARCHITECT shall give written
notice of his claim within fifteen(15) days after occurrence of such action. No claim for
additional compensation shall be valid unless so made. Any changes in the LANDSCAPE
ARCHITECT's fee shall be valid only to the extent that such changes are included in
writing signed by the CITY and the LANDSCAPE ARCHITECT. Regardless of the
decision of the SUPERINTENDENT relative to a claim submitted by the LANDSCAPE
ARCHITECT, all work required under this Agreement as determined by the
SUPERINTENDENT shall proceed without interruption.
9. BREACH OF CONTRACT
If either party violates or breaches any term of this Agreement, such violation or breach
shall be deemed to constitute a default, and the other party has the right to seek such
administrative,contractual or legal remedies as may be suitable to the violation or breach;
and,in addition, if either party,by reason of any default, fails within fifteen(15)days after
notice thereof by the other party to comply with the conditions of the Agreement,the other
party may terminate this Agreement. Notwithstanding the foregoing, or anything else to
the contrary in this Agreement, with the sole exception of an action to recover the monies
the CITY has agreed to pay to the LANDSCAPE ARCHITECT pursuant to Paragraph 4
hereof, no action shall be commenced by the LANDSCAPE ARCHITECT against the
CITY for monetary damages. LANDSCAPE ARCHITECT hereby further waives any and
all claims or rights to interest on money claimed to be due pursuant to this Agreement and
waives any and all such rights to interest which it claims it may otherwise be entitled
pursuant to law, including,but not limited to,the Local Government Prompt Payment Act
(50 ILCS 501/1,et seq.),as amended,or the Illinois Interest Act(815 ILCS 205/1,et seq.),
as amended. The parties hereto further agree that any action by the LANDSCAPE
ARCHITECT arising out of this Agreement must be filed within one year of the date the
alleged cause of action arose or the same will be time-barred. The provisions of this
paragraph shall survive any expiration,completion and/or termination of this Agreement.
10. INDEMNIFICATION
The LANDSCAPE ARCHITECT agrees, to the fullest extent permitted by law, to
indemnify and hold harmless The City, its past, present and future
Commissioners, officials, department heads, and employees, (hereinafter collectively
referred to as "Indemnitees") from and against all liability, judgments, or other
liabilities including costs, reasonable fees and expenses of defense recoverable under
applicable law incurred by Indemnitees to a third party arising from any loss, damage,
injury, death, or loss or damage to property, of whatsoever kind or nature to such third
party, to the extent caused by LANDSCAPE ARCHITECT's negligent acts, errors or
omissions in the performance of the services under this Contract and those of its agents,
employees or consultants. In the event of joint or concurrent negligence, LANDSCAPE
ARCHITECT shall bear only that portion of the loss or expense that its share of the
joint or concurrent negligence bears to the total negligence (including that of the third
parties and Indemnitees) which caused the personal injury or damage. Nothing stated
herein shall be deemed to require the LANDSCAPE ARCHITECT to indemnify or
hold harmless any Indemnitee for its own negligence or fault.
-4-
Indemnitees do not waive their defenses or immunities under the Local Government and
Governmental Employees Tort Immunity Act(745 ILCS 10/1 et seq.)by reason of this
indemnification provision. Indemnification shall survive the termination of this Contract.
11. NO PERSONAL LIABILITY
No official, director, officer, agent or employee of the CITY shall be charged personally
or held contractually liable under any term or provision of this Agreement or because of
their execution, approval or attempted execution of this Agreement.
12. INSURANCE
LANDSCAPE ARCHITECT shall provide, maintain and pay for during the term of this
Agreement the following types and amounts of insurance:
A. Comprehensive Liability. A policy of comprehensive general liability insurance
with limits of at least $1,000,000 aggregate for bodily injury and $1,000,000
aggregate for property damage.
The LANDSCAPE ARCHITECT shall deliver to the SUPERINTENDENT a
Certificate of Insurance naming the CITY as additional insured. The policy shall
not be modified or terminated without thirty (30) days prior written notice to the
SUPERINTENDENT.
The Certificate of Insurance shall include the contractual obligation assumed by the
LANDSCAPE ARCHITECT under Paragraph 10 entitled"Indemnification".
This insurance shall be primary and non-contributory to any other insurance or self-
insurance programs afforded to the CITY. There shall be no endorsement or
modification of this insurance to make it excess over other available insurance.
B. Comprehensive Automobile Liability. Comprehensive Automobile Liability
Insurance covering all owned, non-owned and hired motor vehicles with limits of
not less than$500,000 per occurrence for bodily injury and/or property damage.
C. Combined Single Limit Policy. The requirements for insurance coverage for the
general liability and auto exposures may be met with a combined single limit of
$1,000,000 per occurrence subject to a$1,000,000 aggregate.
D. Professional Liability. The LANDSCAPE ARCHITECT shall carry
LANDSCAPE ARCHITECT's Professional Liability Insurance covering claims
resulting from error, omissions or negligent acts with a combined single limit of
not less than$1,000,000 per claim.A Certificate of Insurance shall be submitted to
the SUPERINTENDENT as evidence of insurance protection. The policy shall not
be modified or terminated without thirty (30) days prior written notice to the
SUPERINTENDENT.
-5 -
13. CONSTRUCTION MEANS,METHODS,TECHNIQUES. SEQUENCES,
PROCEDURES AND SAFETY
The LANDSCAPE ARCHITECT shall not have control over or charge of and shall not be
responsible for construction means, methods, techniques, sequences or procedures, or for
safety precautions and programs in connection with the construction, unless specifically
identified in the Scope of Services.
14. NONDISCRIMINATION/AFFIRMATIVE ACTION
The LANDSCAPE ARCHITECT will not discriminate against any employee or applicant
for employment because of race, color, religion, sex, national origin, age, ancestry, order
of protection status, familial status, marital status, physical or mental disability, military
status, sexual orientation,or unfavorable discharge from military service which would not
interfere with the efficient performance of the job in question. LANDSCAPE
ARCHITECT shall take affirmative action to comply with the provisions of Elgin
Municipal Code Section 5.02.040 and will require any subcontractor to submit to the City
a written commitment to comply with those provisions. LANDSCAPE ARCHITECT shall
distribute copies of this commitment to all persons who participate in recruitment,
screening, referral and selection of job applicants and prospective subcontractors.
LANDSCAPE ARCHITECT agrees that the provisions of Section 5.02.040 of the Elgin
Municipal Code, 1976, as amended, is hereby incorporated by reference, as if set out
verbatim.
No person shall be denied or subjected to discrimination in receipt of the benefit of any
services or activities made possible by or resulting from this Agreement on the grounds of
race,color,religion, sex,national origin, age, ancestry, order of protection status, familial
status, marital status, physical or mental disability, military status, sexual orientation, or
unfavorable discharge from military service.
Any violation of this paragraph shall be considered a violation of a material provision of
this Agreement and shall be grounds for cancellation, termination or suspension, in whole
or in part, of the Agreement by the CITY.
15. ASSIGNMENT AND SUCCESSORS
This Agreement and each and every portion thereof shall be binding upon the successors
and the assigns of the parties hereto; provided,however, that no assignment shall be made
without the prior written consent of the CITY.
16. DELEGATIONS AND SUBCONTRACTORS
Any assignment, delegation or subcontracting shall be subject to all the terms, conditions
and other provisions of this Agreement and the LANDSCAPE ARCHITECT shall remain
-6-
liable to the CITY with respect to each and every item,condition and other provision hereof
to the same extent that the LANDSCAPE ARCHITECT would have been obligated if it
had done the work itself and no assignment,delegation or subcontract had been made. Any
proposed subcontractor shall require the CITY's advanced written approval.
17. NO CO-PARTNERSHIP OR AGENCY
This Agreement shall not be construed so as to create a partnership, joint venture,
employment or other agency relationship between the parties hereto.
18. SEVERABILITY
The parties intend and agree that, if any paragraph, sub-paragraph,phrase, clause or other
provision of this Agreement, or any portion thereof, shall be held to be void or otherwise
unenforceable, all other portions of this Agreement shall remain in full force and effect.
19. HEADINGS
The headings of the several paragraphs of this Agreement are inserted only as a matter of
convenience and for reference and in no way are they intended to define, limit or describe
the scope of intent of any provision of this Agreement,nor shall they be construed to affect
in any manner the terms and provisions hereof or the interpretation or construction thereof.
20. MODIFICATION OR AMENDMENT
This Agreement and its attachments constitute the entire Agreement of the parties on the
subject matter hereof and may not be changed,modified,discharged or extended except by
written amendment duly executed by the parties. Each party agrees that no representations
or warranties shall be binding upon the other party unless expressed in writing herein or in
a duly executed amendment hereof,or change order as herein provided.
21. APPLICABLE LAW
This Agreement shall be deemed to have been made in and shall be construed in accordance
with the laws of the State of Illinois. Venue for the resolution of any disputes or the
enforcement of any rights pursuant to this Agreement shall be in the Circuit Court of Kane
County, Illinois.
22. NEWS RELEASES
The LANDSCAPE ARCHITECT may not issue any news releases without prior approval
from the SUPERINTENDENT, nor will the LANDSCAPE ARCHITECT make public
proposals developed under this Agreement without prior written approval from the
SUPERINTENDENT prior to said documentation becoming matters of public record.
-7 -
23. COOPERATION WITH OTHER CONSULTANTS
The LANDSCAPE ARCHITECT shall cooperate with any other consultants in the CITY's
employ or any work associated with the PROJECT.
24. INTERFERENCE WITH PUBLIC CONTRACTING
The LANDSCAPE ARCHITECT certifies hereby that it is not barred from bidding on this
contract as a result of a violation of 720 ILCS 5/33E et seq. or any similar state or federal
statute regarding bid rigging.
25. SEXUAL HARASSMENT
As a condition of this contract,the LANDSCAPE ARCHITECT shall have written sexual
harassment policies that include, at a minimum,the following information:
A. the illegality of sexual harassment;
B. the definition of sexual harassment under state law;
C. a description of sexual harassment,utilizing examples;
D. the vendor's internal complaint process including penalties;
E. the legal recourse, investigative and complaint process available through the
Illinois Department of Human Rights,and the Illinois Human Rights Commission;
F. directions on how to contact the department and commission;
G. protection against retaliation as provided by Section 6-101 of the Human Rights
Act.
A copy of the policies shall be provided by LANDSCAPE ARCHITECT to the Department
of Human Rights upon request(775 ILCS 5/2-105).
26. SUBSTANCE ABUSE PROGRAM.
As a condition of this agreement,LANDSCAPE ARCHITECT shall have in place a written
substance abuse prevention program which meets or exceeds the program requirements in
the Substance Abuse Prevention Public Works Project Act at 820 ILCS 265/1 et seq. A
copy of such policy shall be provided to the City's Assistant City Manager prior to the
entry into and execution of this agreement.
-8 -
27. WRITTEN COMMUNICATIONS
All recommendations and other communications by the LANDSCAPE ARCHITECT to
the SUPERINTENDENT and to other participants which may affect cost or time of
completion, shall be made or confirmed in writing. The SUPERINTENDENT may also
require other recommendations and communications by the LANDSCAPE ARCHITECT
be made or confirmed in writing.
28. NOTICES
All notices, reports and documents required under this Agreement shall be in writing and
shall be mailed by First Class Mail,postage prepaid, addressed as follows:
A. As to the CITY:
Greg Hulke
Parks and Facilities Superintendent
City of Elgin
150 Dexter Court
Elgin,Illinois 60120-5555
B. As to the LANDSCAPE ARCHITECT:
Upland Design Ltd.
24042 Lockport St., Suite 200
Plainfield, IL 60544
29. COMPLIANCE WITH LAWS
Notwithstanding any other provision of this Agreement, it is expressly agreed and
understood that in connection with the performance of this Agreement that the
LANDSCAPE ARCHITECT shall comply with all applicable federal, state, city and other
requirements of law, including, but not limited to, any applicable requirements regarding
prevailing wages, minimum wage, workplace safety and legal status of employees.
Without limiting the foregoing, LANDSCAPE ARCHITECT hereby certifies, represents
and warrants to the CITY that all LANDSCAPE ARCHITECT's employees and/or agents
who will be providing products and/or services with respect to this Agreement shall be
legally authorized to work in the United States. LANDSCAPE ARCHITECT shall also at
its expense secure all permits and licenses, pay all charges and fees and give all notices
necessary and incident to the due and lawful prosecution of the work, and/or the products
and/or services to be provided for in this Agreement. The CITY shall have the right to
audit any records in the possession or control of the LANDSCAPE ARCHITECT to
determine LANDSCAPE ARCHITECT's compliance with the provisions of this
paragraph. In the event the CITY proceeds with such an audit the LANDSCAPE
ARCHITECT shall make available to the CITY the LANDSCAPE ARCHITECT's
-9-
relevant records at no cost to the CITY. LANDSCAPE ARCHITECT shall pay any and
all costs associated with any such audit.
30. COUNTERPARTS AND EXECUTION
This Agreement may be executed in counterparts, each of which shall be an original and
all of which shall constitute one and the same agreement. This Agreement may be executed
electronically, and any signed copy of this Agreement transmitted by facsimile machine or
email shall be treated in all manners and respects as an original document. The signature
of any party on a copy of this Agreement transmitted by facsimile machine or email shall
be considered for these purposes an original signature and shall have the same legal effect
as an original signature.
IN WITNESS WHEREOF, the parties hereto have entered into and executed this
Agreement effective as of the date and year first written above.
CITY
By: f.4 ooe�_z_e: 4��ILO
Richard G. Kozal, City Manager
Atte t:
City Clerk
LANDSCAPE ARCHITECT:
By: Aland Design Ltd
Name/Print: Michelle A. Kelly
Title: President
Legal Dept\Agreement\Agr-Upland Design-Millennium Park-2-2-23-Clean.docx
- 10-
ATTACHMENT A
SCOPE OF SERVICES
Project Scope: Upland Design Ltd proposes to
accomplish the following work items to assist the
City with development of construction documents,
permitting,bidding and construction administration. An approximate timeline is indicated at the end of the
scope, and actual dates will be set to accommodate City of Elgin needs. The project is to be implemented
through public bidding and construction by a contractor.
Base Information: A topographic survey has been provided by the City to Upland Design. This will be
the baseplan for the design development and construction documents. A FIRM map and a National
Wetland Map have been reviewed during the concept design and no wetland nor floodplain/floodway are
shown on the site.No further investigation will be completed.
Design Development Plans
The design team will prepare design development plans based on the approved Concept Plan developed in
2021. The plans will include detailed layout of amenities-detailing the shelter renovation,play/fitness
choices, game table area,basketball/gaga pit/baggo options. Also included will be choices for seating and
signage for the pollinator garden. An updated cost estimate will be prepared based on 2022 pricing.
Review Meeting: A meeting will be held with the City's team to review plans, color options and the updated
costs. Discussion of inflation on proposed park elements pricing will be done and any adjustments will be
reviewed with the City. (1 meeting)
Construction Plans, Specifications and Bid Proposal
Based on the approved design development plans and costs,the Upland Design team will prepare a set of
construction plans, specifications and bid proposal for public bidding. Construction documents will
address the following:
• Existing Conditions and Removal
• Layout
• Grading,and Drainage
• Shelter Renovation Plans
• Soil Erosion Control
• Landscape Plantings&Restoration
• Construction Details
• General and Technical Specifications
• Bid Proposal Form
11
The specifications will cover each area of construction.A review meeting at 50%and 90%complete
construction documents will take place with City of Elgin staff and comments from the meetings will be
incorporated into the documents. An updated estimate of construction costs will be updated for each
review meeting. OSLAD requirements will be incorporated into the bidding and construction documents
per the IDNR agreement. (2 meetings)
Permits: Permits submittals will be prepared and submitted for the following:
o City of Elgin Building Permit
o IEPA NOI SWPP Permit: Submitted Online
o Given that the area of disturbance is less than one acre, an IL EPA NOI will not be prepared
or submitted.
If the project scope expands or it is later found that additional permits are required, additional
professional scope and associated fees will be discussed with the City.No work is proposed in floodplain
nor wetland areas for this project.
Bidding
The bid documents will be distributed through the City of Elgin purchasing department. Accurate Repro
who will provide both digital and paper copies as requested by bidders. Upland Design will contact
contractors with an invitation to bid. The City will place the legal ad in a local paper and perform any
other procedure as required by local purchasing policies and IDNR OSLAD agreement requirements.
Upland Design will be available to answer questions during bidding,will be present at the bid opening,
check bids for math accuracy, and review the bids with staff. If necessary,references will be contacted
and a letter summarizing bidding and references will be written. (1 meeting)
Construction Observation
Upon award of a contract,Upland Design will make twelve sites visits during construction. City staff will
make additional site visits during construction.
• Review submittals
• Upland Design Ltd to assist with field orders,change orders,requests for information and
clarifications as necessary
• Review Contractor submittals and pay applications will be reviewed prior to forwarding to the
City. Certified Payroll will not be reviewed or retained by Upland Design Ltd.
We will be available by phone to answer questions
• Upland Design Ltd to provide twelve(12)field observation visits, along with written field
reports during the construction phase. This will include a punch list inspection at the conclusion
of construction.
The Firm shall have the authority to act on behalf of the Owner only to the extent provided in this
Agreement. The Firm shall not have control over, charge of, or responsibility for construction means,
methods,techniques,sequences or procedures,or for safety precautions and programs in connection with the
construction work,nor shall the Firm be responsible for the Contractor's failure to perform the construction
work in accordance with the requirements of the Contract Documents
12
ATTACHMENT B
PROJECT SCHEDULE
Description Start Date Estimated Completion Date
Design Development February 1, 2023 March 1, 2023
Construction Documents March 1, 2023 April 1, 2023
Permitting April 1, 2023 May 1, 2023
Bidding May 1, 2023 May 22, 2023
Construction June 1, 2023 October 2, 2023