Loading...
HomeMy WebLinkAbout23-223 Resolution No. 23-223 RESOLUTION AUTHORIZING EXECUTION OF A CHANGE ORDER NO. 1 AND FINAL WITH E. P. DOYLE & SON, LLC FOR CENTRE BOILER REPLACEMENT (Bid No. 23-016) WHEREAS, the City of Elgin has heretofore entered into a contract with E. P. Doyle & Son, LLC for Centre Boiler Replacement(Bid No. 23-016); and WHEREAS, it is necessary and desirable to modify the terms of the contract as is described in Change Order No. 1 and Final attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS,that Richard G. Kozal,City Manager,be and is hereby authorized and directed to execute Change Order No. 1 and Final, a copy of which is attached hereto and made a part hereof by reference. s/David J. Kaptain David J. Kaptain, Mayor Presented: December 6, 2023 Adopted: December 6, 2023 Omnibus Vote: Yeas: 9 Nays: 0 Attest: s/Kimberly Dewis Kimberly Dewis, City Clerk CfECs City of Elgin Change Order ifl ELGIN,ILLINOIS PROJECT: M00178 CHANGE ORDER No. 1 AND FINAL CONTRACT: Centre Boiler Replacement(Bid No.23-016) SCOPE: Make additional repairs as needed in various areas that were not known at the time of the bid. The conditions requiring repairs developed as a result of unknown conditions that could not be reasona- bly foreseen at the time of the bid.These conditions were verified by City staff and charged on a time and material basis. REASONS FOR CHANGE: Since the repairs necessitating these changes in the scope of work were not planned, the circumstances said to necessitate the change in performance were not reasonably fore- seeable at the time the contract was signed. The change is germane to the original contract as signed and the change order is in the best interests of the City of Elgin and authorized by law. SUMMARY OF CHANGES IN CONTRACT AMOUNT: ORIGINAL CONTRACT AMOUNT: $1,490,953.00 IFC drawing for structural steel Add $5,565.28 Third party testing as agreed by both parties Add $6,230.00 Additional demolition due to unknown condition of precast concrete Add $4,566.42 Fire sprinkler changes to avoid future conflicts Add $1,672.16 Replacement of existing failed valves Add $2,179.52 TOTAL FOR CHANGE ORDER NO. 1 and Final: ADD $20,213.38 TOTAL REVISED CONTRACT AMOUNT: $1,511,166.38 The original amount of the contract with E. P. Doyle& Son,LLC is$1,490,953.00. Change Order No. 1 and Final will increase the original contract amount by a total of$20,213.38,that sum represents one and four tenths percent(1.4%)of the original contract amount.The new contract amount, inclusive of all change orders is$1,511,166.38. OTHER CONTRACT PROVISIONS: All other contract provisions remain the same. CHANGE ORDER NUMBER IAND FINAL Agreed to this 6th day of December. 2023. Recommended by: Building Maintenance Department fig: Rich f lcmkr Title: Building Maintenance Superintendent Date: November 2023 Signature: Accepted by: E. P.Doyle& Son, LLC Party of the Second Part (Contractor) By: Kevin Kozlowski Title: Senior Project Manager Date:November 15, 2023 Signature: 7 . ) . Approved by: CITY OF ELGIN Party of the First Part(Owner) By: Rick Kozal Title: City Manager Date: Dec ,2023 Signature: \Legal Dept\formAAChunge Order Form doe