HomeMy WebLinkAbout23-214 Resolution No. 23-214
RESOLUTION
AUTHORIZING EXECUTION OF AN AGREEMENT WITH ENGINEERING
ENTERPRISES, INC. FOR PROFESSIONAL SERVICES IN CONNECTION WITH THE
2024 HIGHBURY RESURFACING PROJECT
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS,
that pursuant to Elgin Municipal Code Section 5.02.020B(9)the City Council hereby finds that an
exception to the requirements of the procurement ordinance is necessary and in the best interest of
the city; and
BE IT FURTHER RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN,
ILLINOIS, that Richard G. Kozal, City Manager, and Kimberly A. Dewis, City Clerk, be and are
hereby authorized and directed to execute an Agreement on behalf of the City of Elgin with
Engineering Enterprises, Inc., for professional services in connection with the 2024 Highbury
resurfacing project,a copy of which is attached hereto and made a part hereof by reference.
s/David J. Kaptain
David J. Kaptain, Mayor
Presented: November 15, 2023
Adopted: November 15, 2023
Omnibus Vote: Yeas: 9 Nays: 0
Attest:
s/Kimberly Dewis
Kimberly Dewis, City Clerk
AGREEMENT
THIS AGREEMENT is made and entered into this 15th day of November,20 23 , by
and between the CITY OF ELGIN, an Illinois municipal corporation (hereinafter referred to as
"CITY") and Engineering Enterprises, Inc., an Illinois corporation (hereinafter referred to as
"ENGINEER").
WHEREAS, the CITY desires to engage the ENGINEER to furnish certain professional
services in connection with the 2024 Highbury Resurfacing Project(hereinafter referred to as the
PROJECT);and
WHEREAS, the ENGINEER represents that it is in compliance with Illinois Statutes
relating to professional registration of individuals and has the necessary expertise and experience
to furnish such services upon the terms and conditions set forth herein below.
NOW, THEREFORE, it is hereby agreed by and between the CITY and the ENGINEER
that the CITY does hereby retain the ENGINEER for and in consideration of the mutual promises
and covenants contained herein, the sufficiency of which is hereby acknowledged to act for and
represent it in the engineering matters involved in the PROJECT as described herein, subject to
the following terms and conditions and stipulations,to-wit:
1. SCOPE OF SERVICES
A. All work hereunder shall be performed under the direction of the Director of Public
Services of the CITY,herein after referred to as the"DIRECTOR".
B. The Scope of Services for this PROJECT shall include providing design
engineering services for the roadway improvements associated with the PROJECT
including milling and resurfacing of existing pavement, roadway patching,
sidewalk removal and replacement,curb and gutter removal and replacement,ADA
improvements,miscellaneous improvements as may be required,the completion of
documentation required by IDOT for an MFT construction section project,
coordination with IDOT, including but not limited to the review and approval of
necessary documentation and PROJECT plans and specifications,and coordination
with the City's Purchasing Department to advertise the PROJECT for bidding.
C. A detailed Scope of Services for the PROJECT is attached hereto as Attachment A,
and incorporated into this Agreement by this reference.
D. An exhibit detailing the locations in which the work for the PROJECT will be
completed, Location Map, is attached hereto as Attachment D, and incorporated
into this agreement by this reference.
2. PROGRESS REPORTS
A. An outline project milestone schedule is provided hereinunder.
a. Notice To Proceed:November 16,2023
b. Submit Plans to IDOT for Review: February 9,2024
c. Advertise for Bids: March 14,2024
d. Bid Opening: March 29,2024
e. Award Construction Contract: April 10,2024
f. Start Construction: May 13, 2024
g. End Construction: September 27,2024
B. A detailed project schedule for the PROJECT is included as Attachment B,attached
hereto, and incorporated into this Agreement by this reference. Progress will be
recorded on the project schedule and submitted monthly as a component of the
Status Report described in C below.
C. The ENGINEER will submit to the DIRECTOR monthly a status report keyed to
the project schedule. A brief narrative will be provided identifying progress,
findings and outstanding issues.
3. WORK PRODUCTS
All work product prepared by the ENGINEER pursuant hereto including, but not limited to,
reports, plans, designs, calculations, work drawings, studies, photographs, models and
recommendations shall be the property of the CITY and shall be delivered to the CITY upon
request of the DIRECTOR; provided, however, that the ENGINEER may retain copies of such
work product for its records. ENGINEER'S execution of this Agreement shall constitute
ENGINEER'S conveyance and assignment of all right,title and interest, including but not limited
to any copyright interest, by the ENGINEER to the CITY of all such work product prepared by
the ENGINEER pursuant to this Agreement. The CITY shall have the right either on its own or
through such other engineers as determined by the CITY to utilize and/or amend such work
product. Any such amendment to such work product shall be at the sole risk of the CITY. Such
work product is not intended or represented to be suitable for reuse by the CITY on any extension
to the PROJECT or on any other project, and such reuse shall be at the sole risk of the CITY
without liability or legal exposure to the ENGINEER.
4. PAYMENTS TO THE ENGINEER(Not To Exceed Method)
A. For services provided the ENGINEER shall be paid at the hourly rate of personnel
employed on the PROJECT in accordance with the ENGINEER'S standard
schedule of charges dated January 1, 2023, attached hereto as Attachment E and
incorporated into this agreement by reference with total fees and expenses to be
paid to the ENGINEER not to exceed $135,470 regardless of the actual costs
incurred by the ENGINEER unless substantial modifications to the scope of the
work are authorized in writing by the DIRECTOR,and approved by way of written
amendment to this Agreement executed by the parties. A detailed cost breakdown
for the PROJECT is included as Attachment C and incorporated into this
Agreement by this reference.
- 2-
B. For outside services provided by other firms or subconsultants,the CITY shall pay
the ENGINEER the invoiced fee to the ENGINEER, plus 10%. The cost of any
such outside services is included within the total not-to-exceed amount of$135,470
provided for in Section 4A above.
B. The cost of any such reimbursable expenses,such as printing fees and geotechnical
investigations, is included within the total not-to-exceed amount of $135,470
provided for in Section 4A above.
D. The CITY shall make periodic payments to the ENGINEER based upon actual
progress within 30 days after receipt and approval of invoice. Said periodic
payments to the ENGINEER shall not exceed the amounts shown in the following
schedule, and full payments for each task shall not be made until the task is
completed and accepted by the DIRECTOR.
Payment Schedule
ESTIMATED VALUE
ESTIMATED % OF WORK ESTIMATED
INVOICE DATE COMPLETE COMPLETE INVOICE VALUE
11/30/2023 5% $ 6,773.50 $ 6,773.50
12/21/2023 25% $ 33,867.50 $ 27,094.00
1/21/2024 45% $ 60,961.50 $ 27,094.00
2/21/2024 70% $ 94,829.00 $ 33.867.50
3/21/2024 90% $ 121,923.00 $ 27,094.00
4/21/2024 98% $ 132,760.6q $ 10,837.60,
5/21/2024 100% $ 135,470.00 $ 2,709.40
Total $ 135,470.00
5. INVOICES
A. The ENGINEER shall submit invoices in a format approved by the CITY. Progress
reports(2C above) will be included with all payment requests.
B. The ENGINEER shall maintain records showing actual time devoted and cost
incurred. The ENGINEER shall permit the authorized representative of the CITY
to inspect and audit all data and records of the ENGINEER for work done under
this Agreement. The ENGINEER shall make these records available at reasonable
times during the Agreement period, and for a year after termination of this
Agreement.
6. TERMINATION OF AGREEMENT
Notwithstanding any other provision hereof, the CITY may terminate this Agreement at any time
upon fifteen (15)days prior written notice to the ENGINEER. In the event that this Agreement is
so terminated, the ENGINEER shall be paid for services actually performed and reimbursable
- 3 -
expenses actually incurred prior to termination, except that reimbursement shall not exceed the
task amounts set forth under section 4 above.
7. TERM
This Agreement shall become effective as of the date the ENGINEER is given a notice to proceed
and, unless terminated for cause or pursuant to section 6, shall be deemed concluded on the date
the CITY determines that all of the ENGINEER's work under this Agreement is completed. A
determination of completion shall not constitute a waiver of any rights or claims which the CITY
may have or thereafter acquire with respect to any term or provision of the Agreement.
8. NOTICE OF CLAIM
If the ENGINEER wishes to make a claim for additional compensation as a result of action taken
by the CITY,the ENGINEER shall give written notice of his claim within 15 days after occurrence
of such action. No claim for additional compensation shall be valid unless so made. Any changes
in the ENGINEER's fee shall be valid only to the extent that such changes are included in writing
signed by the CITY and the ENGINEER. Regardless of the decision of the DIRECTOR relative
to a claim submitted by the ENGINEER, all work required under this Agreement as determined
by the DIRECTOR shall proceed without interruption.
9. BREACH OF CONTRACT
If either party violates or breaches any term of this Agreement, such violation or breach shall be
deemed to constitute a default, and the other party has the right to seek such administrative,
contractual or legal remedies as may be suitable to the violation or breach; and, in addition, if
either party,by reason of any default,fails within fifteen(15)days after notice thereof by the other
party to comply with the conditions of the Agreement, the other party may terminate this
Agreement. Notwithstanding the foregoing, or anything else to the contrary in this Agreement,
with the sole exception of an action to recover the monies the CITY has agreed to pay to the
ENGINEER pursuant to section 4 hereof, no action shall be commenced by the ENGINEER
against the CITY for monetary damages. ENGINEER hereby further waives any and all claims or
rights to interest on money claimed to be due pursuant to this Agreement, and waives any and all
such rights to interest which it claims it may otherwise be entitled pursuant to law, including, but
not limited to,the Local Government Prompt Payment Act(50 ILCS 501/1, et seq.), as amended,
or the Illinois Interest Act(815 ILCS 205/1,et seq.),as amended. The parties hereto further agree
that any action by the ENGINEER arising out of this Agreement must be filed within one year of
the date the alleged cause of action arose or the same will be time-barred. The provisions of this
section shall survive any expiration,completion and/or termination of this Agreement.
10. INDEMNIFICATION
To the fullest extent permitted by law,ENGINEER agrees to and shall indemnify,defend and hold
harmless the CITY, its officers,employees,agents,boards and commissions from and against any
and all claims, suits,judgments, costs, attorneys fees, damages or other relief, including but not
limited to workers compensation claims, in any way resulting from or arising out of negligent
-4 -
actions or omissions of the ENGINEER in connection herewith,including negligence or omissions
of employees or agents of the ENGINEER arising out of the performance of this Agreement. In
the event of any action against the CITY, its officers, employees,agents,boards or commissions,
covered by the foregoing duty to indemnify, defend and hold harmless such action shall be
defended by legal counsel of the CITY's choosing. The provisions of this section shall survive any
expiration and/or termination of this Agreement.
11. NO PERSONAL LIABILITY
No official, director, officer, agent or employee of the CITY shall be charged personally or held
contractually liable under any term or provision of this Agreement or because of their execution,
approval or attempted execution of this Agreement.
12. INSURANCE
The ENGINEER shall provide, maintain and pay for during the term of this Agreement the
following types and amounts of insurance:
A. Comprehensive Liability. A policy of comprehensive general liability insurance
with limits of at least $1,000,000 aggregate for bodily injury and $1,000,000
aggregate for property damage.
The ENGINEER shall deliver to the DIRECTOR a Certification of Insurance
naming the CITY as additional insured. The policy shall not be modified or
terminated without thirty(30)days prior written notice to the DIRECTOR
The Certificate of Insurance which shall include Contractual obligation assumed by
the ENGINEER under Article 10 entitled"Indemnification"shall be provided.
This insurance shall apply as primary insurance with respect to any other insurance
or self-insurance programs afforded to the CITY. There shall be no endorsement
or modification of this insurance to make it excess over other available insurance,
alternatively,if the insurance states that it is excess or prorated,it shall be endorsed
to be primary with respect to the CITY.
B. Comprehensive Automobile Liability. Comprehensive Automobile Liability
Insurance covering all owned, non-owned and hired motor vehicles with limits of
not less than$500,000 per occurrence for damage to property.
C. Combined Single Limit Policy. The requirements for insurance coverage for the
general liability and auto exposures may be met with a combined single limit of
$1,000,000 per occurrence subject to a$1,000,000 aggregate.
D. Professional Liability. The ENGINEER shall carry Engineers Professional
Liability Insurance Covering claims resulting from error, omissions or negligent
acts with a combined single limit of not less than $1,000,000 per occurrence. A
- 5 -
Certificate of Insurance shall be submitted to the DIRECTOR as evidence of
insurance protection. The policy shall not be modified or terminated without thirty
(30)days prior written notice to the DIRECTOR.
13. CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES,
PROCEDURES AND SAFETY
The ENGINEER shall not have control over or charge of and shall not be responsible for
construction means, methods, techniques, sequences or procedures, or for safety precautions and
programs in connection with the construction, unless specifically identified in the Scope of
Services.
14. NONDISCRIMINATION/AFFIRMATIVE ACTION
The ENGINEER will not discriminate against any employer or applicant for employment because
of race,color,religion,sex,national origin,age,ancestry,order of protection status,familial status,
marital status, physical or mental disability, military status, sexual orientation, or unfavorable
discharge from military service which would not interfere with the efficient performance of the
job in question. ENGINEER shall take affirmative action to comply with the provisions of Elgin
Municipal Code Section 5.02.040 and will require any subcontractor to submit to the CITY a
written commitment to comply with those provisions. ENGINEER shall distribute copies of this
commitment to all persons who participate in recruitment, screening,referral and selection of job
applicants and prospective subcontractors. ENGINEER agrees that the provisions of Section
5.02.040 of the Elgin Municipal Code, 1976, as amended, is hereby incorporated by reference, as
if set out verbatim.
No person shall be denied or subjected to discrimination in receipt of the benefit of any services
or activities made possible by or resulting from this Agreement on the grounds of race, color,
religion,sex,national origin,age,ancestry,order of protection status,familial status,marital status,
physical or mental disability, military status, sexual orientation, or unfavorable discharge from
military service.
Any violation of this paragraph shall be considered a violation of a material provision of this
Agreement and shall be grounds for cancellation, termination or suspension, in whole or in part,
of the Agreement by the CITY.
15. ASSIGNMENT AND SUCCESSORS
This Agreement and each and every portion thereof shall be binding upon the successors and the
assigns of the parties hereto; provided, however, that no assignment shall be made without the
prior written consent of the CITY.
16. DELEGATIONS AND SUBCONTRACTORS
Any assignment,delegation or subcontracting shall be subject to all the terms,conditions and other
provisions of this Agreement and the ENGINEER shall remain liable to the CITY with respect to
- 6 -
each and every item,condition and other provision hereof to the same extent that the ENGINEER
would have been obligated if it had done the work itself and no assignment, delegation or
subcontract had been made. Any proposed subcontractor shall require the CITY's advanced
written approval.
17. NO CO-PARTNERSHIP OR AGENCY
This Agreement shall not be construed so as to create a partnership,joint venture,employment or
other agency relationship between the parties hereto.
18. SEVERABILITY
The parties intend and agreed that, if any section,sub-section,phrase,clause or other provision of
this Agreement, or any portion thereof, shall be held to be void or otherwise unenforceable, all
other portions of this Agreement shall remain in full force and effect.
19. HEADINGS
The headings of the several sections of this Agreement are inserted only as a matter of convenience
and for reference and in no way are they intended to define,limit or describe the scope of intent of
any provision of this Agreement,nor shall they be construed to affect in any manner the terms and
provisions hereof or the interpretation or construction thereof.
20. MODIFICATION OR AMENDMENT
This Agreement and its attachments constitutes the entire Agreement of the parties on the subject
matter hereof and may not be changed, modified, discharged or extended except by written
amendment duly executed by the parties. Each party agrees that no representations or warranties
shall be binding upon the other party unless expressed in writing herein or in a duly executed
amendment hereof,or change order as herein provided.
21. APPLICABLE LAW
This Agreement shall be deemed to have been made in,and shall be construed in accordance with
the laws of the State of Illinois. Venue for the resolution of any disputes or the enforcement of any
rights pursuant to this Agreement shall be in the Circuit Court of Kane County,Illinois.
22. NEWS RELEASES
The ENGINEER may not issue any news releases without prior approval from the DIRECTOR,
nor will the ENGINEER make public proposals developed under this Agreement without prior
written approval from the DIRECTOR prior to said documentation becoming matters of public
record.
-7-
23. COOPERATION WITH OTHER CONSULTANTS
The ENGINEER shall cooperate with any other consultants in the CITY's employ or any work
associated with the PROJECT.
24. INTERFERENCE WITH PUBLIC CONTRACTING
The ENGINEER certifies hereby that it is not bared from bidding on this contract as a result of a
violation of 720 ILCS 5/33E et seq. or any similar state or federal statute regarding bid rigging.
25. SEXUAL HARASSMENT
As a condition of this contract,the ENGINEER shall have written sexual harassment policies that
include,at a minimum,the following information:
A. the illegality of sexual harassment;
B. the definition of sexual harassment under state law;
C. a description of sexual harassment,utilizing examples;
D. the vendor's internal complaint process including penalties;
E. the legal recourse, investigative and complaint process available through the
Illinois Department of Human Rights, and the Illinois Human Rights Commission;
F. directions on how to contact the department and commission;
G. protection against retaliation as provided by Section 6-101 of the Human Rights
Act.
A copy of the policies shall be provided by ENGINEER to the Department of Human Rights upon
request(775 ILCS 5/2-105).
26. SUBSTANCE ABUSE PROGRAM.
As a condition of this agreement, ENGINEER shall have in place a written substance abuse
prevention program which meets or exceeds the program requirements in the Substance Abuse
Prevention Public Works Project Act at 820 ILCS 265/1 et seq. A copy of such policy shall be
provided to the DIRECTOR prior to the entry into and execution of this agreement.
27. WRITTEN COMMUNICATIONS
All recommendations and other communications by the ENGINEER to the DIRECTOR and to
other participants which may affect cost or time of completion, shall be made or confirmed in
- 8 -
writing. The DIRECTOR may also require other recommendations and communications by the
ENGINEER be made or confirmed in writing.
28. NOTICES
All notices,reports and documents required under this Agreement shall be in writing and shall be
mailed by First Class Mail,postage prepaid,addressed as follows:
A. As to CITY: B. As to ENGINEER:
Mike Pubentz,P.E. Bradley P. Sanderson. P.E.
Public Services Director Chief Operating Officer/President
City of Elgin Engineering Enterprises, Inc.
150 Dexter Court 52 Wheeler Road
Elgin, Illinois 60120-5555 Sugar Grove, IL 60554
29. COMPLIANCE WITH LAWS
Notwithstanding any other provision of this Agreement it is expressly agreed and understood that
in connection with the performance of this Agreement that the ENGINEER shall comply with all
applicable Federal, State, City and other requirements of law, including, but not limited to, any
applicable requirements regarding prevailing wages, minimum wage, workplace safety and legal
status of employees. Without limiting the foregoing, ENGINEER hereby certifies,represents and
warrants to the CITY that all ENGINEER'S employees and/or agents who will be providing
products and/or services with respect to this Agreement shall be legally authorized to work in the
United States. ENGINEER shall also at its expense secure all permits and licenses,pay all charges
and fees and give all notices necessary and incident to the due and lawful prosecution of the work,
and/or the products and/or services to be provided for in this Agreement. The CITY shall have the
right to audit any records in the possession or control of the ENGINEER to determine
ENGINEER'S compliance with the provisions of this section. In the event the CITY proceeds
with such an audit the ENGINEER shall make available to the CITY the ENGINEER'S relevant
records at no cost to the CITY. ENGINEER shall pay any and all costs associated with any such
audit.
30. COUNTERPARTS AND EXECUTION
This Agreement may be executed in counterparts, each of which shall be an original and all of
which shall constitute one and the same agreement. This Agreement may be executed
electronically, and any signed copy of this Agreement transmitted by facsimile machine or email
shall be treated in all manners and respects as an original document. The signature of any party
on a copy of this Agreement transmitted by facsimile machine or email shall be considered for
these purposes an original signature and shall have the same legal effect as an original signature.
-9-
IN WITNESS WHEREOF, the parties hereto have entered into and executed this
Agreement effective as of the date and year first written above.
FOR THE C • FOR THE ENGINEER:
By By: RSM1IM (4S)
City Manager Name/Print: B dley P. Sanderson,P.E.
Title: Chief Operating Officer/President
e
ts% w,f/I .ateizz\
City Clerk
Legal Dept\Agreement\ENGINEERING AGREEMENT-FORM-clean-8-10-22.doc x
- 10-
2024 Highbury Resurfacing Project
City of Elgin
Attachment A — Scope of Services
The City of Elgin requires Design Engineering services for the City's 2024 Highbury Resurfacing
Project. A map of the roadways to be included in the program can be found in Attachment D of this
proposal.
In order to successfully complete this project, various items will need to be addressed during the
design engineering for this project. Our proposed scope of services will include the following:
DESIGN ENGINEERING
1.1 Project Management and Coordination
• Project Management and Coordination
• Initial coordination with Illinois Department of Transportation (IDOT) for processing
the project utilizing MFT funds including a Section Number Request.
• Coordinate Final Scope with City
• Subconsultant Coordination and Review
1.2 Project Meetings
• One (1) Kick-Off Meeting with City
• Two (2) Internal Project Meetings
1.3 Data Collection
• Acquire and Review City Utility Data
1.4 Topographic Survey
• Highbury Court
• Highbury Drive
• Joslyn Drive
• Village Court
• Various ADA Ramps
1.5 Develop Base Plan Sheets
• Develop Base Plan Sheets Utilizing GIS & Aerials for Processing IDOT MFT
Construction Section
1.6 Analyze/Finalize Roadway Rehabilitation Methods
• Analyze Pavement Core Information
• Analyze Hot-In-Place Recycling for Weld Road Resurfacing
• Recommend Roadway Improvements to City Staff for Approval
1.7 Public and Private Utility Coordination
• Coordinate with Private Utilities Companies
• Design JULIE
1.8 Site Assessment and Field Measurements
• Review Asphalt, Curb, and Sidewalk Conditions
• Review Sidewalk Corners for ADA Compliance
2024 Highbury Resurfacing Project
Engineering Agreement Attachment A—
Scope of Services
• Utility Structure Inspections
• Sign Inventory
• Review Existing Turn Radii and Perform AutoTurn analysis for Highbury Court,
Highbury Drive, Joslyn Drive and Village Court
1.9 Preparation of Final Plans, Specifications and Estimates
• Preparation of Construction Plans in IDOT Format
• Title Sheet
• General Notes
• Typical Sections
• Summary of Quantities
• Plan Sheets
• Project Details
• City Details
• District One Details and IDOT Highway Standards
• Prepare Construction Specifications
• All required bidding and letting information
• City special provisions and contracting information
• Project specific special provisions
• Preparation of Engineer's Opinion of Probable Construction Costs
1.10 Process Required Documents with IDOT for MFT Projects
• Plan Set
• Bid Package
• BDE 213 — Estimate of Cost
• BLR 09111 —Resolution
• BLR 09150— Request for Expenditure/Authorization of MFT funds
• D1 P10019—MFT Scoping Checklist
1.11 QC/QA of Final Plans & Bid Package
• Final review of Plans and Quantities
• Final review of Bid Package, Project Specifications and Estimate of Cost
1.12 Revisions and Disposition of Comments Based on IDOT Review
• Submit Bid Package to IDOT for Approval
• Prepare Disposition of Comments for Any Comments Provided by IDOT
• Make Any Necessary Revisions
1.13 Bidding and Contracting
• Prepare Bidders List
• Address Bid Questions
• Prepare Addenda
• Prepare Bid Tab, Bid Summary, and Recommendation of Award
• Prepare Contracts for IDOT Approval
The following scope of services will be provided by EEI's subconsultant Rubino Engineering
• Perform Pavement Cores
• Prepare Pavement Core Summary Report
• CCDD Analysis
2024 Highbury Resurfacing Project
Engineering Agreement Attachment A—
Scope of Services
• Prepare LPC 662 Form
EXCLUSIONS
The above scope of services excludes the following:
• Bidding (Coordinated/Managed by the City)
• Resident Coordination
The above scope for "2024 HIGHBURY RESURFACING PROJECT" summarizes the work items
that will be completed for this contract. Additional work items, including additional meetings beyond
the meetings defined in the above scope shall be considered outside the scope of the base contract
and will be billed in accordance with the Standard Schedule of Charges.
2024 Highboy Resurfacing Project
Engineerrg Agreement Attachment A-
Scope of Services
ATTACHMENT B: ESTIMATED SCHEDULE
CLIENT PROJECT NUMBER
City of Elgin EG2308
PROJECT TITLE DATE PREPARED BY
2024 Hi•hbu Resurfacin• Pro ect 10/16/23 CJO
TASK TASK DESCRIPTION 2023 2024
NO. NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP
DESIGN ENGINEERING
1.1 Pro.ect Mana•ement and Coordination
1.2 Pro'ect Meetin•s
1.3 Data Collection
1.4 To•o•raphic Surve
1.5 Develop Base Plan Sheets
1.6 Anal ze/Finalize Roadwa Rehabilitation Methods
1.7 Public and Private Utili Coordination
1.8 Site Assessment and Field Measurements
1.9 Pre•aration of Final Plans, Specifications and Estimates
1.10 Process Re•uired Documents with IDOT for MFT Pro'ects
1.11 QC/QA of Final Plans& Bid Packa•e
1.12 Revisions and Disposition of Comments Based on IDOT Review
1.13 Biddin• and Contractin•
Construction _______ . ::3"p:
411
52 Wheeler Road Sugar Grove. IL 60554 Tel: . . Fax:
ATTACHMENT C: ESTIMATED LEVEL OF EFFORT AND ASSOCIATED COST
PROFESSIONAL ENGINEERING SERVICES
CUEN1 PROJECT NUMBER
City of Elgin EG2308
PROJECT TITLE DATE PREPARED BY
2024 Hi•hbury Resurfacin• Pro ect 10/16/23 CJO
TASK ROLE PIC PM SPE 1 PE SPT 2 SPT 1 ST ADMIN
TASK DESCRIPTION PERSON-----_--I HOURS COST
RATE $244 $208 $182 $165 $170 $159 $138 $70
- 7 #NGINERINQ - ,,.
1.1 Project Management and Coordination I 2 j 24 8 34 1 S 6.936
1.2 Project Meetings(3 Meetings) 2 6 6 14 $ 2,828
1.3 Data Collection(GIS,List of Known Issues,Etc.) 2 4 6 $ 1,024
1 4 Topographic Survey 18 36 14 68 $ 12.090
1.5 Develop Base Plan Sheets 4 36 56 96 $ 15,752
1.6 Analyze/Finalize Roadway Rehabilitation Methods 2 6 8 $ 1,508
_ 1.7 Public and Private Utility Coordination 2 6 8 $ 1,354
1.8 Site Assessment and Field Measurements 8 48 68 124 $ 21,620
1.9 Preparation of Final Plans,Specifications and Estimates 2 12 66 92 24 56 72 324 $ 53,096
1 10 Process Required Documents with IDOT for MFT Projects 2 4 6 $ 1,144
1.11 OC/QA of Final Plans&Bid Package 8 4 12 $ 2,392
1.12 Revisions and Disposition of Comments Based on IDOT Review 2 4 8 4 6 2 26 $ 4,238
1.13 Bidding and Contracting 2 4 9 4 19 $ 3.238
Design Engineering Subtotal:I 8 86_ 163 178 1001 132 72 I 61 745 $ 127,220
PROJECT TOTAL: I 8 I 86 I 163 I 178 I 100 I 132 I 72 f 6' 745 I 127,220
EEI STAFF DIRECT EXPENSES
PIC Principal In Charge Printing/Scanning= S 140
PM Project Manager Rubino(Cores&CCDD)= $ 8.110
SPE 1 Senior Project Engineer I
PE Project Engineer DIRECT EXPENSES a $ 8,250
SPT 2 Senior Project Technician II
SPT 1 Senior Project Technician I LABOR SUMMARY
ST Senior Technician EEI Labor Expenses= 5 127,220
ADMIN Adminstrative Assistant TOTAL LABOR EXPENSES $ 127,220
TOTAL COSTS $ 135,470
52 Wheeler Road,Sugar Grove ' ' Tel 1 1 Fax .
-INIE--
inq.L jUtn111:t U1:.-, �.,—�-- I. j _1
Si
M ling
I•...R�aBn V V t ii —
• %r /T
____ //I 4* '' '
•
r24_,....z..4.,,no isitli. yogi" ,,.ti 4+ ' ',---/
r•kr--).. . -< a iiiiist - ... 44 ,.<,,
.va 14'4' Illg4;v,ikt rag' AG rala V4V-ftr 4.* *4
t I "IL MI; , 1:.71 4.g .0 ...,„PE,
I. r
-,„ ._____ ti /// ''''N\ M.• I"
, f- . ,!""',:t A. . ,firj eloili.mr ,
......,,•• r
,„-,,,,,,i,r, ,,,,,
4r. „----...
, al 1
„,,bm ,1 . ,,,,,..4:4wg ,
.....
,,
EMh am aip1
Plank RA _4 ~,1 7 -:.r!' ` W'Mi—.' .:••onlisn �t - -..
- if
,. T `` ` �� r
•
•
/
_ honeys a r s WO t v b �o' E°
i.r ' Ili 8 h�r° 4e0Q P� IIP
.• nr °c • 1.13 GaCP M toIF
'a t zT ^ -� 1
g s o T+• Q' h r . I1 An 7
fl / 1•w" `." eA'(q_ ),-. ,o.. r(py i�� 1.:ie -;L•!y•,� !s' ',i 4%�h::'ti' V.�.' bW. '('o- k
.,' Y pt `c 4. t')A c 3 oc y. / & SsttMw z f Si'.'_ 's ��.0
� I of 1 o c�c.. 4a 4-i.,.' �j .r Pkwy�. i' f�_ ,• '.-' , US,20W F tJ D
fop `�. \�c� � � ,1 6g; •,�Er rn r�`- .4!/ I{ � , ' ti Randall.Rd o0
Ar o R • e�'31°
•
.i4 ,;, �r+ Id0i a, '4 r. d� 11 .futlon St'. � e'.�i- �S4
o° '.\_ .y4pr` , `' a/I cI od S_: A. * �c� �ii}�p }� , fi•?j�� \. l- �oa:(a
`, 4 o J
1v0 2S �+. p � 4+•yf�
tv
.c v et 0, r••/ •a• • ';) P {NN4,1;Os �l ••7 c YN.YII ,tJf. • r .i T .z_. 'f ..
, S.
v �•� o j/ ;��-., @I • `�.' I'�,wtt_t.:� l \ • 'I'3' 3-FlagPote ct ---- 0.
C \ tJe i L.\ �` � „ r O�
� I ' C
i f Q e _q,0% 11, a . 1, , + !' . ,
` o' �'fat
r `*" O • e :r .a 0a■�`' CIO i o ::A � _ '
a e !, -•C 1�. $>:S i "-i of
Range R0 .3\ ._�,_,_ Iw � 1�a
Q° �°
• Sonora Dr 1.0*
� Fill_ v .i'l Q _� ._80 5 lc
�-
• Monumsnt Rd -I_o ir g•S• �:t. o d a- I i 1
o i� South St Humbolt.:zrz;1+ eJnaoro,
L Soiteh'Sl
Tj �li St 1st C� Y 3a : ,,,,,,on ( Clr' ptte
c-. ::-- U y -t'iNllatia« 1,.:1• CltseM��
'st Fir' > Holden to • Weglord vs, i" • sa� �n,
q' I •Waoir s� 111. ,p
a og Rd . 06' I--.: 11.t ; m a Cir ? Cc Nhlatordr- c7 r"t7tA,,'c.
/{� 11 .. s LL11tyu i ?� /' t3,-' `-tst. .
Z o �•Po -Go Os 1..•I co 58b!Itlreek Y $ r i 9,�
Legend <}ESl b of c `' I `1 n�o n Dr Wlckiow — Gil v
totosflele Sr '. P rY t s,t•\ Dr I�r•.1t_ .- I. c
c C Perot ADO `:- t\' Y, ''4 ,7hy~��'' i— \f .' ���
2024 •Roadway Program Limits y ., 0, 1 <f. ;:f. .v ,r - y �� { '
sssr.
DATE: N
Engineering Enterprises, Inc. October2023 ATTACHMENT D
PROJECT NO.:52 Wheeler Road EG2308 LOCATION MAP
L Sugar Grove, Illinois 60554 BY MJT /.
(630) 466-6700 PATH E LG I N I
N v.;saua. .cHvaz3
www.eeiweb.con. FILE:EG]]a1. EEaa.a.w>.rEnron.N%a THE CITY uaTHUSUBURBS'
Engineering Enterprises, Inc. ATTACHMENT E
EMPLOYEE DESIGNATION CLASSIFICATION HOURLY RATE
Senior Principal E-4 $244.00
Principal E-3 $239.00
Senior Project Manager E-2 $231.00
Project Manager E-1 $208.00
Senior Project Engineer/Surveyor II P-6 $196.00
Senior Project Engineer/Surveyor I P-5 $182.00
Project Engineer/Surveyor P-4 $165.00
Senior Engineer/Surveyor P-3 $152.00
Engineer/Surveyor P-2 $138.00
Associate Engineer/Surveyor P-1 $124.00
Senior Project Technician II T-6 $170.00
Senior Project Technician I T-5 $159.00
Project Technician T-4 $149.00
Senior Technician T-3 $138.00
Technician T-2 $124.00
Associate Technician T-1 $109.00
GIS Technician II G-2 $125.00
GIS Technician I G-1 $112.00
Engineering/Land Surveying Intern I-1 $ 79.00
Executive Administrative Assistant A-4 $ 75.00
Administrative Assistant A-3 $ 70.00
VEHICLES. REPROGRAPHICS, DIRECT COSTS, DRONE AND EXPERT TESTIMONY
Vehicle for Construction Observation $ 15.00
In-House Scanning and Reproduction $0.25/Sq. Ft. (Black & White)
$1.00/Sq. Ft. (Color)
Reimbursable Expenses (Direct Costs) Cost
Services by Others (Direct Costs) Cost + 10%
Unmanned Aircraft System / Unmanned Aerial Vehicle / Drone $ 220.00
Expert Testimony $ 276.00
52 Wheeler Road • • Tel: • Fax: • 1,: .