HomeMy WebLinkAbout23-183Resolution No. 23-183 RESOLUTION AUTHORIZING EXECUTION OF A CHANGE ORDER NO. 2 WITH ELECTRICAL RESOURCE MANAGEMENT (ERM) FOR PHASE II LED STREET LIGHT CONVERSION PROJECT (Bid No. 22-057) WHEREAS, the City of Elgin has heretofore entered into a contract with Electrical Resource Management (ERM) for Phase II LED Street Light Conversion project (Bid No. 22- 057); and WHEREAS, it is necessary and desirable to modify the terms of the contract as is described in Change Order No. 2 attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that Richard G. Kozal, City Manager, be and is hereby authorized and directed to execute Change Order No. 2, a copy of which is attached hereto and made a part hereof by reference. s/ David J. Kaptain David J. Kaptain, Mayor Presented: September 27, 2023 Adopted: September 27, 2023 Omnibus Vote: Yeas: 9 Nays: 0 Attest: s/ Kimberly Dewis Kimberly Dewis, City Clerk City of Elgin ELGIN, ILLINOIS PROJECT No. 342901 CHANGE ORDER No. 2 CONTRACT: Phase II LED Street Light Conversion Project. (Bid No. 22-057) Change Order SCOPE: This change order will allow further adjustments to materials (LED light fixtures) required to- wards the completion of the phase II LED street light conversion project which were not known at the time of award. A contract to secure 2,617 LED retrofit light fixtures built to specification to be placed into existing luminaire housings was awarded to Electrical Recourse Management on December 7th 2022. Change Order No. 1 has previously been approved and related to one hundred and ninety three (193) luminare housings that had been identified at that time as unsuitable to accept retrofit fixtures. Since Change Order No. 1, an additional eight hundred and nineteen (819) luminaire mounting configu- rations have been identified as unsuitable to accept the retrofit fixtures. Approval of this change order will allow for the further adjustment in materials towards work germane to the original contract award and project specifications. REASONS FOR CHANGE: • The infrastructure conditions necessitating this change order were not reasonably foreseeable at the time the contract was signed. • The change is germane to the original contract as signed. • The change order is in the best interest of the City of Elgin and authorized by law SUMMARY OF CHANGES IN CONTRACT AMOUNT: The cost of the contract is being amended to reflect the material adjustment necessary towards complet- ing the project, which are more fully described in Exhibit A attached hereto and made a part hereof. ORIGINAL CONTRACT AMOUNT: CHANGE ORDER No. 2 Material Adjustments TOTAL FOR CHANGE ORDER NO. 2: PREVIOUS CHANGE ORDER(S): Change order no. 1 TOTAL OF PREVIOUS CHANGE ORDERS: $69,615 ADD $69,615 $58,497 ADD $58,497 $1,436,500 TOTAL REVISED CONTRACT AMOUNT: $1,564,612 The original amount of the contract with Electrical Resource Management is $1,436,500. Change Order No. 2 totaling $69,615 and previous Change Order No. 1 totaling $58,497 will increase the original con- tract amount by a total of $128,112 that sum representing 8.9 percent increase of the original contract amount. The new contract amount, inclusive of all change orders is $1,564,612. OTHER CONTRACT PROVISIONS: All other contract provisions remain the same. CHANGE ORDER No. 2 Agreed to this 27 day of September , 2023. Recommended by: PUBLIC WORKS DEPARTM T By: Aaron Neal Title: Public Works Directo Date: / 7 / ZO Z Signature: Accepted by: Electrical Resource Management Party of the Second Part (Contractor) By: Roderick Young Title: VP Business Development Approved by: CITY OF ELGIN Party of the First Part (Owner) By: Richard G. Kozal Title: City Manaeer Date: Septe ..., r 27, 2023 Signature: Legal Dept\Agreement\Change Order No. 2 - Bid 22-057 (Phase II LED Street Light Conversion Materials) - Clean.docx EXHIBITA Date: Aug 28, 2023 Quote: ERM23-15561-2 ERM Electrical Resource Management Project City of Elgin - Washington Rework Location Elgin IL Quote ERM23-15561-2 Quote Page 1/2 Electrical Resource Management 401 S. Carlton Avenue Wheaton IL 60187 Phone: Fax: From: Chris von Kondrat Quoter Ph: 630-462-0230 x.17 Email: cvonkondrat@thewillgroup.com To: Aaron Neal For City of Elgin Bid Date Aug 28, 2023 150 Dexter Court Expires Sep 22, 2023 2nd Floor Elgin IL 60120 Phone: (847) 931-5660 Fax: (847) 931-6027 QTY Type MFG Part Price UQ ExtPrlce 819 MATE ELGIN WASHINGTON REWORK - PART # ELGRWRK $85.00 $69,615.00 NOTE: PRICING ABOVE DOES NOT INCLUDE SHIPPING COSTS IN EITHER DIRECTION THE ABOVE PRICING INCLUDES THE FOLLOWING: 1. TEAR DOWN AND INSPECT CURRENT PRODUCT 2. REASSEMBLE WITH CUSTOM TOP PLATE AND HARDWARE 3. REPLACE WIRING WITH 6 CABLE HARNESS 4. ADD NEW CUSTOM BOTTOM PLATE IN BOX FOR INSTALLATION BY CONTRACTOR 5. TEST OPERATION AND CONFIRM CHANGES 6. REPACKAGE Total: $69,615.00 Notes: PLEASE REFER TO THIS QUOTE # WHEN ORDERING Terms and conditions of sale: If anchor bolts are included and pre -shipment is required, freight charges will apply. NO labor charge back will be paid without prior authorization from the factory. Manufacturer's standard freight terms apply. Freight claims are the responsibility of the customer. Pricing and freight are based upon receiving an order for the entire BOM quoted above. Any deviation will result in a requote. No liquidated damages will be accepted based upon material delivery delays If a structural stamp is required with the submittals a minimum fee of $500 will be charged Electrical Resource Management Chris von Kondrat Page 1/2