HomeMy WebLinkAbout23-175 Resolution No. 23-175 RESOLUTION AUTHORIZING EXECUTION OF AN AMENDMENT AGREEMENT NO. 2 WITH R.K. JOHNSON& ASSOCIATES, INC. FOR ADDITIONAL PROFESSIONAL SERVICES IN CONNECTION WITH THE COMBINED SEWER OVERFLOW NATIONAL POLLUTION DISCHARGE ELIMINATION SYSTEM PERMIT COMPLIANCE PROJECT BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN,ILLINOIS,that pursuant to Elgin Municipal Code Section 5.02.020B(9) the City Council hereby finds that an exception to the requirements of the procurement ordinance is necessary and in the best interest of the city; and BE IT FURTHER RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that Richard G. Kozal, City Manager, and Kimberly A. Dewis, City Clerk, be and are hereby authorized and directed to execute an Amendment Agreement No.2 on behalf of the City of Elgin with R.K.Johnson&Associates,Inc.,for additional professional services in connection with the combined sewer overflow national pollution discharge elimination system permit compliance project, a copy of which is attached hereto and made a part hereof by reference. s/David J. Kaptain David J. Kaptain, Mayor Presented: September 13, 2023 Adopted: September 13, 2023 Omnibus Vote: Yeas: 8 Nays: 0 Attest: s/Kimberly Dewis Kimberly Dewis, City Clerk AMENDMENT AGREEMENT No. 2 THIS AMENDMENT AGREEMENT No. 1 is hereby made and entered into this 13th day of September 2023, by and between the City of Elgin, Illinois, a municipal corporation (hereinafter referred to as the"City"),and R.K.Johnson&Associates,Inc.,an Illinois corporation (hereinafter referred to as"Engineer"). WHEREAS,the City and Engineer hereto have previously entered into an agreement dated August 25, 2020 (the "Original Agreement"), wherein the City engaged the Engineer to furnish certain professional services in connection with the Combined Sewer Overflow National Pollution Discharge Elimination System Permit Compliance Project (hereinafter referred to as "Original Agreement"and the "Project"); and WHEREAS, the term of the Original Agreement provided for services from contract year beginning August 2020 and ending July 2021,and WHEREAS,the term of Amendment Agreement No. 1 provided services from the contract year beginning January 2022 and ending December 2022,and WHEREAS, the Original Agreement provided a detailed Project Schedule only for the contract year beginning August 2020 and ending July 2021, and WHEREAS, the Amendment Agreement No. 1 provided a detailed Project Schedule only for the contract year beginning January 2022 and ending December 2022,and WHEREAS, the City has determined that the proposed scope of the PROJECT should be modified to include Engineering, Permit Compliance, Report Preparation (as required by the NPDES Permit),Field Surveying and Field Inspection activities for the contract year January 2023 to December 2023. WHEREAS,the contract price for the Original Agreement is$88,900.00,the contract price for Amendment Agreement No. 1 is $117,000.00, and the cost for the Engineering, Permit Compliance, Report Preparation, Field Surveying and Field Inspection services January 2023 to December 2023 contract year to be provided pursuant to Amendment Agreement No. 2 is in the amount of$98,000.00. WHEREAS, the changes contemplated by this Amendment No. 2 are germane to the Original Agreement as signed; and this Amendment Agreement No. 2 is in the best interest of the City and is authorized by law. NOW, THEREFORE, for and in consideration of the mutual undertakings as provided herein, and other good and valuable consideration, the sufficiency of which is hereby mutually acknowledged,the parties hereto agree as follows: 1. The above recitals are incorporated into and made a part of this agreement as if fully recited hereby. 2. Section 1 the Original Agreement is hereby amended by adding the following to the end thereof- D. ENGINEER shall perform the Services described in Attachment"A-2",entitled"Scope of Services, January 2023 to December 2023 Contract Year of the Combined Sewer Overflow NPDES Permit Compliance Project". No Supplemental Services shall be performed by the ENGINEER nor shall the City be responsible for payment of any Supplemental Services unless and until such Supplemental Services are authorized in advance in writing by the City. 3. Section 2 of the Original Agreement is hereby amended by adding the following for progress reports for Amendment Agreement No.2 to read as follows: PROGRESS REPORTS A. An outline project milestone schedule is provided hereinunder a. General Permit Compliance January 2023—December 2023 b. Manhole Inspections: March 2023 —December 2023 c. Field Survey of MH Elevations: May 2023—December 2023 d. Map&Database Maintenance: April 2023 —December 2023 e. Discharge Monitoring Report: January 2023 —December 2023 f. Project Coordination: To be determined* g. MWRD LTOMP Report May 2023—September 2023** *Note: Coordination with City Sewer Separation Project will be completed on a"as needed" basis. Therefore,the timeline for the coordination work will be based on the schedule of the Sewer Separation Design Project rather than the NDPES Permit Compliance Project. **Note: Time period assumes MWRD will review and request revisions on the original submittal of the Long Term Operation and Maintenance Plan B. A detailed project schedule for the Project is included in Attachment`B-2", attached hereto. Progress will be recorded on the project schedule and submitted as a component of the Status Report described in C below. C. The ENGINEER will submit to the DIRECTOR regular status reports keyed to the project schedule. A brief narrative will be provided identifying progress, findings and outstanding issues. The status reports shall be provided, at a minimum,with every project invoice and at every project coordination/discussion meeting. 4. Section 4 of the Original Agreement, is hereby amended by amending subparagraphs A and B thereof and by adding a progress payment schedule and project schedule for Amendment Agreement No. 2 as follows: A. For services provided the ENGINEER shall be paid at the direct hourly rate of personnel employed on the project based on the rate schedules attached to the Original Agreement and Amendment No. 1, with the total fee for the Original Agreement not to exceed$88,900.00,with a total fee for Amendment No. 1 not to exceed$117,000.00,and with a total fee for Amendment No.2 not to exceed $98,000.00, regardless of the actual costs incurred by the ENGINEER unless substantial modifications to the scope of work are authorized in writing by the Director and approved by way of written amendment to this Agreement. B. Reimbursable expenses are listed in Attachment"C-2"and are included within the total fee not to exceed amounts referred to in Section 4A hereof. C. The progress payment schedule for Amendment Agreement No. 2 term shall be as follows: Estimated Schedule of Progress Payments January 2023— 1% February 2023 — 1% March 2023—2% April 2023—5% May 2023—6% June 2023—9% July 2023— 15% August 2023—9% September 2023— 14% October 2023— 14% November 2023— 14% December 2023— 10% A detailed Project Schedule for the Amendment Agreement No. 2 term has been included as Attachment"C-2". 5. The changes provided to the Original Agreement as provided in this Amendment Agreement No.2 are germane to the Original Agreement,and this Amendment Agreement No. 2 is in the best interests of the City of Elgin and is authorized by law. 6. That except as amended in this Amendment Agreement No. 2, the Original Agreement shall remain in full force and effect. 7. That in the event of any conflict between the terms of the Original Agreement and the provisions in this Amendment Agreement No. 2, the provisions of this Amendment Agreement No. 2 shall control. IN WITNESS WHEREOF, the undersigned have entered into and executed this Amendment Agreement as of the date and year first written above. CITY OF ELGIN CONSULTANT By: By: City Manager Secretary/Treasurer Attest: Attest: i City Clerk Vice re ' ' I i AMENDMENT AGREEMENT NO. 2 -ATTACHMENT"A-2" SCOPE OF ZRVICES January 2023 thru December 2023 Contract Year Combined Sewer Overflow NPDES Permit Compliance Project The Combined Sewer Overflow NPDES Permit Compliance Project is a five year program to ensure continuing compliance with IEPA CSO-NPDES Permit No. IL0070505. The following Scope of Services applies to the second year of the five year program,extending through the entire 2023 calendar year. For clarity, it has been divided into the four major project components. GENERAL PERMIT COMPLIANCE 1. Discharge Monitoring Reports a. Review and analyze the SmartCover flow-metering data obtained at each of the permitted Combined Sewer Outfall(CSO)locations. This data will be used to complete the monthly Discharge Monitoring Report as required by NPDES Permit No. IL0070505. b. Communicate and coordinate with City Staff when recorded data seems abnormal or inconsistent with regular Combined Sewer System flow patterns. In instances where the SmartCover devices are malfunctioning or out of service,the Discharge Monitoring Report will be completed based on previously compiled flow metering data. c. Provide bi-annual summaries of Discharge Monitoring Reports to tabulate the Combined Sewer Overflow events that occurred at each permitted outfall. 2. General Permit Coordination and Correspondence a. Provide project management to schedule manhole inspection crews,review field notes and critical deficiency observations and otherwise coordinate the different aspects of NPDES Permit Compliance. b. Communicate regularly with City Staff,including periodic progress meetings,to ensure that the City Project Manager is consistently aware of the project status. Certain inspection observations,such as critical manhole deficiencies or Sanitary Sewer Overflows,will be brought to City Staff s attention immediately. 3. Coordination with Sewer Separation Projects a. When directed by City Staff,our firm will provide Combined Sewer System information to the Engineering Consultant designing the sewer separation improvements projects. This task includes support of the sewer separation projects only;the detailed design will be provided by the Engineering Consultant hired to complete the Sewer Separation Project. 4. Long Term Control Plan Status Reports a. Complete and submit bi-annual status reports describing progress made on the implementation of the Long Term Control Plan. A typical Status Report will include a summary of recent SmartCover data to demonstrate the progress made in terms of limiting combined sewer overflow(CSO)events. City of Elgin CSO NPDES Permit Compliance Project Contract Year 2023 AMENDMENT AGREEMENT NO. 2 -ATTACHMENT"A-2" SYSTEM & DATABASE MANAGEMENT 1. GIS Map Maintenance and Updates a. Perform annual updates to the City of Elgin's sanitary and combination sewer map. The updated information will be obtained via discussions with City Staff as well as field notes and observations taken during the manhole inspections. Our firm will work with the City's NPDES Project Manager as well as with the Manager of the Salesforce/Asset Optics database to ensure that the base map is based on the most current and accurate information. It is anticipated that the aerial base map will be provided by the City in the ArcGIS 10.0 format of the existing system. The map updates performed as part of this project shall provide information in layers for: 1. Streets and Street Names 2. Structures(Manholes,Diversion,etc.) 3. Structure Numbers 4. Pipe Systems and Sizes 5. Basin Limits b. Update the sanitary and combined sewer system map based on recently constructed Sewer Separation Projects. The map will be updated to identify new locations of combined sewer or the new pipe, manholes, etc. that compose a separated sanitary sewer. As in previous years, mapping of separate storm sewer or sanitary sewer improvements is not included in this Scope of Services. It is anticipated that Record Drawings will be provided for sewer separation projects completed within the past two years. c. Complete and/or verify the link between the sewer system map and the informational database to ensure the attribute information for sanitary sewer pipes and manholes can be viewed while in the mapping program. d. Provide mapping support for the City of Elgin Public Works Department to produce hard copy exhibits, field atlases and wall maps as needed. This Scope of Services assumes that no more than 20 full-size hardcopy walls maps will be required. 2. GIS Database Maintenance and Updates a. Input annual updates based on information from City Staff, manhole inspection reports, and Record Drawings into the City Salesforce/Asset Optics database. The data required for each item is listed below: 1. Manhole Number 2. Sewer Main Upstream and Downstream Manhole Numbers 3. Street Name where each item is located 4. Street Address nearest to each Manhole 5. "From-To"Cross Street Names for Sewer Mains 6. Sewer Main Pipe Size 7. Manhole Rim Elevation 8. Sewer Pipe and Manhole Materials of Construction(if observable) 9. Construction Date(if available) City of Elgin CSO NPDES Permit Compliance Project Contract Year 2023 AMENDMENT AGREEMENT NO. 2 -ATTACHMENT"A-2" 10. Sewer Depth(i.e., Manhole measure-down) 11. Pipe Invert Elevation(based on rim elevation and measure-down depth) 12. Sewer Pipe Slope(calculated using pipe length and invert elevations) FIELD INSPECTION AND SURVEYING 1. Manhole Inspection a. Continue the annual field inspection of 900 sanitary and combined sewer system manholes,as outlined in the Scope of Services for the original Agreement. b. Inspections will be non-entry to evaluate the conditions of the manhole using the standardized protocol and inspection form completed in previous CSO NPDES Permit Compliance Projects. An inspection report(including photograph)will be completed and filed for each inspected manhole structure. The inspections shall also serve as verification of the system layout,manhole location and line connectivity. 2. Sanitary and Combined Sewer Manhole Rim Elevation a. Conduct an isolated field survey to determine the top-of-casting elevation for the inspected sanitary manholes. Elevations will be based on the North American Vertical Datum 1988 using a network-connected GPS instrument. 3. Data Collection and Communication a. Information obtained by the manhole structure inspection or rim elevation survey will be entered into the City GIS map and database as described in the System and Database Management section. b. Critical Deficiencies observed during field inspections (i.e., pipe blockage, Sanitary Sewer Overflow,structural issue creating a safety concern,etc.)will be communicated to City Staff immediately to initiate corrective action. c. Comprehensive Deficiency Summary Reports shall be provided at the end of the Contract Year. The reports will list all deficiencies, including critical deficiencies that were immediately communicated to City Staff. METROPOLITAN WATER RECLAMATION DISTRICT REPORTING REQUIREMENTS 1. Long Term Operation and Maintenance Plan The LTOMP will be a compilation of several previously completed documents required by MWRD and the IEPA(see summary below) a. Capacity,Management,Operation and Maintenance(CMOM)Plan b. Condition Assessment (summary of deficiencies noted in Sewer Televising and Smoke Testing evaluations) c. Private Sector Program City of Elgin CSO NPDES Permit Compliance Project Contract Year 2023 AMENDMENT AGREEMENT NO.2-ATTACHMENT"B-2" Task Job Class I Jan-2023 I Feb-2023 Mar-2023 A r-2023 Ma -2023 Jun-2023 Jul-2023 Au -2023 Se -2023 Oct-2023 Nov-2023 Dec-2023 Total GENERAL PERMIT COMPLIANCE 1.Discharge Monitoring Report(DMR) Prof.Engineer 2 2 3 3 4 4 4 4 3 3 2 2 36 _.... __......__ _..........__....P.L.S. 0 MH Supervisor 0 . ........ ..._....... _......................_. .....................................................................- _............ General Coordination and Correspondence Prof.Engineer 2 2 2 6 4 8 18 6 6 6 4 8 72 Z P.L.S. _..._ _...... _..... 0 ....._....._.._....._........_..._........ MH Supervisor 0 GIS Technician 0 Field Technician 0 3.Coordination with Sewer Separation Projects Prof.Engineer 4 4 4 4 16 P.L.S. 0 GIS Technician 0 4.Bi-Annuaf Updated to the Long Term Control Prof.Engineer 8 8 16 Plan P.L.S. 0 GIS Technician 0 SYSTEM&DATABASE MANAGEMENT 1. GIS Map Maintenance and Updates Prof.Engineer 0 - Based on information from MH Inspection' P.L.S. 0 - Based on field survey of MH Rim Elevations MH Supervisor _ 0 _._.. _.._.. _... ...__... GIS Technician 4 4 8 8 8.. 8.. 16 24 4 84 2. Review MH Mspeetlorts and Flay Noted Prof.Engineer 0 Deficiencies P.L.S. 0 GISTechnician 4 4 8.. 8 16 16 24 4 84 3. Mapping Updates based on Sewer Separation Prof.Engineer 0 Projects P.L.S. _.... 0 _............................ MH Supervisor 0 GIS Technician 8 8 4 20 FIELD INSPECTION AND SURVEYING 1. Manhole Inspection Prof.Engineer 0 -900 Manhole Structures inspected annually P.L.S. 0 MH Supervisor 8 16 24 24 24 24 40 40 40 16 256 GIS Technician 0 Field Technician 8 16 24 24 24 24 40 40 40 16 2W 2. Sanitary and Combined Sewer Manhole Rim Prof.Engineer _ _ _ _ 0 Elevation P.L.S. 0 -900 Rim Elevations field surveyed annually MH Supervisor _8 16 8 16 ...,,..18..,___. 16 _ 8o GIS Technician _. 0 Field Technician 8 16 8 16 --16 16 8o FIELD INSPECTION AND SURVEYING 8.Preparation of Manhole Inspection Summary Prof.Engineer 32 32 P.L.S. 0 ............... ...._......._... ........_....._ _........ _.. GIS Technician MWRD CONDITION ASSESSMENT&REPORTING REQUIREMENTS 1.MWRD Reports Prof.Engineer 8 32 40 P.L.S. 0 -Long Term Operation and Maintenance Plan GIS Technician e 8 City of Elgin CSO NPDES Permit Compliance Project Contract Year 2023 AMENDMENT AGREEMENT NO.2-ATTACHMENT"C-2" PERSONNEL BILLING RATES& REIMBURSABLES The proposed billing rates and reimbursable items for this project are summarized below: Professional Engineer/Project Manager: S122/hour Professional Land Surveyor: S115/hour Manhole Inspection Supervisor $97/hour Lead Technician: $90/hour GIS Technician: S77/hour Field Technician: S70/hour Mileage: $0.655 per mile(based on 2023 IRS Standard Mileage Rate) Tolls: Full reimbursement for all tolls incurred with 0% mark-up Printing: Reimbursement of printing costs for full size system maps(w/aerial view), hardcopies of copies of previously submitted permit documents(i.e. Long Term Control Plan or the Capacity,Management,Operations and Maintenance Plan), and hardcopies of reports required by the Metropolitan Water Reclamation District. Ancillary copies of discussion documents,meeting minutes,etc. will be considered incidental to the project and will not be reimbursed separately. City of Elgin CSO NPDES Permit Compliance Project 2023 Contract Year