HomeMy WebLinkAbout22-27 Resolution No. 22-27
RESOLUTION
AUTHORIZING EXECUTION OF AN AGREEMENT WITH HAMPTON, LENZINI &
RENWICK, INC. FOR PROFESSIONAL SERVICES IN CONNECTION WITH THE LARKIN
AVE PEDESTRIAN CROSSWALK PROJECT
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN,ILLINOIS,that
pursuant to Elgin Municipal Code Section 5.02.020B(9) the City Council hereby finds that an
exception to the requirements of the procurement ordinance is necessary and in the best interest of
the city; and
BE IT FURTHER RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN,
ILLINOIS, that Richard G. Kozal, City Manager, and Kimberly A. Dewis, City Clerk, be and are
hereby authorized and directed to execute an Agreement on behalf of the City of Elgin with
Hampton, Lenzini & Renwick, Inc., for professional services in connection with the Larkin Ave
pedestrian crosswalk project,a copy of which is attached hereto and made a part hereof by reference.
s/David J. Kaptain
David J. Kaptain, Mayor
Presented: February 23, 2022
Adopted: February 23, 2022
Omnibus Vote: Yeas: 9 Nays: 0
Attest:
s/Kimberly Dewis
Kimberly Dewis, City Clerk
AGREEMENT
THIS AGREEMENT is made and entered into this 23rd day of February , 20 22 ,by
and between the CITY OF ELGIN, an Illinois municipal corporation (hereinafter referred to as
"CITY") and Hampton, Lenzini & Renwick, Inc., an Illinois corporation (hereinafter referred to
as"ENGINEER").
WHEREAS, the CITY desires to engage the ENGINEER to furnish certain professional
services in connection with the Larkin Ave Pedestrian Crosswalk Project (hereinafter referred to
as the PROJECT);and
WHEREAS, the ENGINEER represents that it is in compliance with Illinois Statutes
relating to professional registration of individuals and has the necessary expertise and experience
to furnish such services upon the terms and conditions set forth herein below.
NOW, THEREFORE, it is hereby agreed by and between the CITY and the ENGINEER
that the CITY does hereby retain the ENGINEER for and in consideration of the mutual promises
and covenants contained herein, the sufficiency of which is hereby acknowledged to act for and
represent it in the matters involved in the PROJECT as described herein, subject to the following
terms and conditions and stipulations,to-wit:
1. SCOPE OF SERVICES
A. All work hereunder shall be performed under the direction of the Director of Public
Works of the CITY,herein after referred to as the"DIRECTOR".
B. The ENGINEER shall furnish professional services for the PROJECT including
professional engineering design services to prepare construction and bidding
documents and construction administration and observation services.
C. A detailed Scope of Services for the PROJECT is attached hereto as Attachment
A-1 for Professional Engineering Design Services and Attachment A-2 for
Construction Administration and Oversight Services. An Overall Project Location
Map is shown in Exhibit D showing project limits and incorporated into this
Agreement by this reference.
2. PROGRESS REPORTS
A. An outline project milestone schedule is provided hereinunder.
a. City Council Approval—February 9'2022
b. Notice To Proceed—Following Council Approval of Agreement
c. Bid Letting—Anticipated for May of 2022
d. Construction—Anticipated start of July 2022
B. A detailed project schedule for the PROJECT is included as Attachment B,attached
hereto, and incorporated into this Agreement by this reference. Progress will be
recorded on the project schedule and submitted monthly as a component of the
Status Report described in C below.
C. The ENGINEER will submit to the DIRECTOR a monthly a status report keyed to
the project schedule. A brief narrative will be provided identifying progress,
findings and outstanding issues.
3. WORK PRODUCTS
All work product prepared by the ENGINEER pursuant hereto including, but not limited to,
reports, plans, designs, calculations, work drawings, studies, photographs, models and
recommendations shall be the property of the CITY and shall be delivered to the CITY upon
request of the SUPERINTENDENT; provided,however, that the ENGINEER may retain copies
of such work product for its records. ENGINEER'S execution of this Agreement shall constitute
ENGINEER'S conveyance and assignment of all right,title and interest,including but not limited
to any copyright interest, by the ENGINEER to the CITY of all such work product prepared by
the ENGINEER pursuant to this Agreement. The CITY shall have the right either on its own or
through such other ENGINEER's as determined by the CITY to utilize and/or amend such work
product. Any such amendment to such work product shall be at the sole risk of the CITY. Such
work product is not intended or represented to be suitable for reuse by the CITY on any extension
to the PROJECT or on any other project, and such reuse shall be at the sole risk of the CITY
without liability or legal exposure to the ENGINEER.
4. PAYMENTS TO THE ENGINEER(Not To Exceed Method)
A. For services provided the ENGINEER shall be paid in accordance with the Estimate
of Level of Effort and Associated Costs attached hereto as Attachment C-1 and C-
2,incorporated into this agreement by this reference in a total not-to-exceed sum of
$35,375 regardless of the actual costs incurred by the ENGINEER unless
substantial modifications to the scope of the work are authorized in writing by the
DIRECTOR, and approved by way of written amendment to this Agreement
executed by the parties.
B. For outside services provided by other firms or sub ENGINEERs, the CITY shall
pay the ENGINEER the invoiced fee to the ENGINEER,plus 0%. The cost of any
such outside services is included within the total not-to-exceed amount of$35,375
provided for in Section 4A above.
C. Labor Costs, overhead, profit, sub ENGINEER fees and direct costs are included
within the total not-to-exceed amount of$35,375 provided for in Section 4A above.
D. The CITY shall make periodic payments to the ENGINEER based upon actual
progress within 30 days after receipt and approval of invoice. Said periodic
payments to the ENGINEER shall not exceed the amounts shown in the following
-2 -
schedule, and full payments for each task shall not be made until the task is
completed and accepted by the SUPERINTENDENT.
Payment Schedule
Date Estimated Percent Estimated Value of Estimated
Complete Work Com leted Invoice Value
02/28/2022 _15% $5,250.00 $5,306.25
03/31/2022 40% $8,750.00 $14,150.00
04/30/2022 50% $3,500.00 $17,687.50
05/28/2022 60% $3,500.00 $21,225.00
06/30/2022 75% $5,250.00 $26,531.25
07/30/2022 90% $5,250.00 $31,837.50
08/31/2022 100% $3,500.00 $35,375.00
5. INVOICES
A. The ENGINEER shall submit invoices in a format approved by the CITY. Progress
reports(2C above)will be included with all payment requests.
B. The ENGINEER shall maintain records showing actual time devoted and cost
incurred. The ENGINEER shall permit the authorized representative of the CITY
to inspect and audit all data and records of the ENGINEER for work done under
this Agreement. The ENGINEER shall make these records available at reasonable
times during the Agreement period, and for a year after termination of this
Agreement.
6. TERMINATION OF AGREEMENT
Notwithstanding any other provision hereof,the CITY may terminate this Agreement at any time
upon fifteen (15)days prior written notice to the ENGINEER. In the event that this Agreement is
so terminated, the ENGINEER shall be paid for services actually performed and reimbursable
expenses actually incurred prior to termination, except that reimbursement shall not exceed the
task amounts set forth under section 4 above.
7. TERM
This Agreement shall become effective as of the date the ENGINEER is given a notice to proceed
and, unless terminated for cause or pursuant to section 6, shall be deemed concluded on the date
the CITY determines that all of the ENGINEER's work under this Agreement is completed. A
determination of completion shall not constitute a waiver of any rights or claims which the CITY
may have or thereafter acquire with respect to any term or provision of the Agreement.
8. NOTICE OF CLAIM
-3 -
If the ENGINEER wishes to make a claim for additional compensation as a result of action taken
by the CITY,the ENGINEER shall give written notice of his claim within 15 days after occurrence
of such action. No claim for additional compensation shall be valid unless so made. Any changes
in the ENGINEER's fee shall be valid only to the extent that such changes are included in writing
signed by the CITY and the ENGINEER. Regardless of the decision of the DIRECTOR relative
to a claim submitted by the ENGINEER, all work required under this Agreement as determined
by the SUPERINTENDENT shall proceed without interruption.
9. BREACH OF CONTRACT
If either party violates or breaches any term of this Agreement, such violation or breach shall be
deemed to constitute a default, and the other party has the right to seek such administrative,
contractual or legal remedies as may be suitable to the violation or breach; and, in addition, if
either party,by reason of any default,fails within fifteen(15)days after notice thereof by the other
party to comply with the conditions of the Agreement, the other party may terminate this
Agreement. Notwithstanding the foregoing, or anything else to the contrary in this Agreement,
with the sole exception of an action to recover the monies the CITY has agreed to pay to the
ENGINEER pursuant to section 4 hereof, no action shall be commenced by the ENGINEER
against the CITY for monetary damages. ENGINEER hereby further waives any and all claims or
rights to interest on money claimed to be due pursuant to this Agreement, and waives any and all
such rights to interest which it claims it may otherwise be entitled pursuant to law,including, but
not limited to,the Local Government Prompt Payment Act(50 ILCS 501/1, et seq.), as amended,
or the Illinois Interest Act(815 ILCS 205/1,et seq.),as amended. The parties hereto further agree
that any action by the ENGINEER arising out of this Agreement must be filed within one year of
the date the alleged cause of action arose or the same will be time-barred. The provisions of this
section shall survive any expiration, completion and/or termination of this Agreement.
10. INDEMNIFICATION
To the fullest extent permitted by law,ENGINEER agrees to and shall indemnify,defend and hold
harmless the CITY,its officers,employees,agents,boards and commissions from and against any
and all claims, suits,judgments, costs, attorneys fees, damages or other relief, including but not
limited to workers compensation claims, in any way resulting from or arising out of negligent
actions or omissions of the ENGINEER in connection herewith,including negligence or omissions
of employees or agents of the ENGINEER arising out of the performance of this Agreement. In
the event of any action against the CITY, its officers, employees, agents,boards or commissions,
covered by the foregoing duty to indemnify, defend and hold harmless such action shall be
defended by legal counsel of the CITY's choosing. The provisions of this section shall survive any
expiration and/or termination of this Agreement.
11. NO PERSONAL LIABILITY
No official, director, officer, agent or employee of the CITY shall be charged personally or held
contractually liable under any term or provision of this Agreement or because of their execution,
approval or attempted execution of this Agreement.
-4-
12. INSURANCE
The Engineer shall provide,pay for and maintain in effect,during the term of this agreement,the
following types and amounts of insurance:"
A. Comprehensive Liability. The ENGINEER shall provide, pay for and maintain
in effect, during the term of this Agreement, a policy of comprehensive general
liability insurance with limits of at least$1,000,000 aggregate for bodily injury and
$1,000,000 aggregate for property damage.
The ENGINEER shall deliver to the DIRECTOR a Certification of Insurance
naming the CITY as additional insured. The policy shall not be modified or
terminated without thirty(30)days prior written notice to the DIRECTOR.
The Certificate of Insurance which shall include Contractual obligation assumed by
the ENGINEER under Article 10 entitled"Indemnification"shall be provided.
This insurance shall apply as primary insurance with respect to any other insurance
or self-insurance programs afforded to the CITY. There shall be no endorsement
or modification of this insurance to make it excess over other available insurance,
alternatively,if the insurance states that it is excess or prorated,it shall be endorsed
to be primary with respect to the CITY.
B. Comprehensive Automobile Liability. Comprehensive Automobile Liability
Insurance covering all owned, non-owned and hired motor vehicles with limits of
not less than$500,000 per occurrence for damage to property.
C. Combined Single Limit Policy. The requirements for insurance coverage for the
general liability and auto exposures may be met with a combined single limit of
$1,000,000 per occurrence subject to a$1,000,000 aggregate.
D. Professional Liability. The ENGINEER shall carry Professional Liability
Insurance Covering claims resulting from error, omissions or negligent acts with a
combined single limit of not less than$1,000,000 per occurrence. A Certificate of
Insurance shall be submitted to the DIRECTOR as evidence of insurance
protection. The policy shall not be modified or terminated without thirty(30)days
prior written notice to the DIRECTOR.
13. CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES,
PROCEDURES AND SAFETY
The ENGINEER shall not have control over or charge of and shall not be responsible for
construction means, methods, techniques, sequences or procedures, or for safety precautions and
programs in connection with the construction, unless specifically identified in the Scope of
Services.
-5 -
14. NONDISCRIMINATION
In all hiring or employment made possible or resulting from this Agreement, there shall be no
discrimination against any employee or applicant for employment because of sex,age,race, color,
creed,national origin,marital status,of the presence of any sensory,mental or physical handicap,
unless based upon a bona fide occupational qualification,and this requirement shall apply to,but
not be limited to, the following: employment advertising, layoff or termination, rates of pay or
other forms of compensation and selection for training,including apprenticeship.
No person shall be denied or subjected to discrimination in receipt of the benefit of any services
or activities made possible by or resulting from this Agreement on the grounds of sex,race, color,
creed, national origin, age except minimum age and retirement provisions, marital status or the
presence of any sensory, mental or physical handicap. Any violation of this provision shall be
considered a violation of a material provision of this Agreement and shall be grounds for
cancellation,termination or suspension,in whole or in part,of the Agreement by the CITY.
15. ASSIGNMENT AND SUCCESSORS
This Agreement and each and every portion thereof shall be binding upon the successors and the
assigns of the parties hereto; provided, however, that no assignment shall be made without the
prior written consent of the CITY.
16. DELEGATIONS AND SUBCONTRACTORS
Any assignment,delegation or subcontracting shall be subject to all the terms,conditions and other
provisions of this Agreement and the ENGINEER shall remain liable to the CITY with respect to
each and every item,condition and other provision hereof to the same extent that the ENGINEER
would have been obligated if it had done the work itself and no assignment, delegation or
subcontract had been made. Any proposed subcontractor shall require the CITY's advanced
written approval.
17. NO CO-PARTNERSHIP OR AGENCY
This Agreement shall not be construed so as to create a partnership,joint venture, employment or
other agency relationship between the parties hereto.
18. SEVERABILITY
The parties intend and agreed that,if any section, sub-section,phrase, clause or other provision of
this Agreement, or any portion thereof, shall be held to be void or otherwise unenforceable, all
other portions of this Agreement shall remain in full force and effect.
19. HEADINGS
The headings of the several sections of this Agreement are inserted only as a matter of convenience
and for reference and in no way are they intended to define,limit or describe the scope of intent of
-6 -
any provision of this Agreement,nor shall they be construed to affect in any manner the terms and
provisions hereof or the interpretation or construction thereof.
20. MODIFICATION OR AMENDMENT
This Agreement and its attachments constitutes the entire Agreement of the parties on the subject
matter hereof and may not be changed, modified, discharged or extended except by written
amendment duly executed by the parties. Each party agrees that no representations or warranties
shall be binding upon the other party unless expressed in writing herein or in a duly executed
amendment hereof,or change order as herein provided.
21. APPLICABLE LAW
This Agreement shall be deemed to have been made in, and shall be construed in accordance with
the laws of the State of Illinois.Venue for the resolution of any disputes or the enforcement of any
rights pursuant to this Agreement shall be in the Circuit Court of Kane County,Illinois.
22. NEWS RELEASES
The ENGINEER may not issue any news releases without prior approval from the DIRECTOR,
nor will the ENGINEER make public proposals developed under this Agreement without prior
written approval from the DIRECTOR prior to said documentation becoming matters of public
record.
23. COOPERATION WITH OTHER ENGINEERS
The ENGINEER shall cooperate with any other ENGINEERs in the CITY's employ or any work
associated with the PROJECT.
24. INTERFERENCE WITH PUBLIC CONTRACTING
The ENGINEER certifies hereby that it is not barred from bidding on this contract as a result of a
violation of 720 ILCS 5/33E et seq.or any similar state or federal statute regarding bid rigging.
25. SEXUAL HARASSMENT
As a condition of this contract,the ENGINEER shall have written sexual harassment policies that
include,at a minimum, the following information:
A. the illegality of sexual harassment;
B. the definition of sexual harassment under state law;
C. a description of sexual harassment,utilizing examples;
D. the vendor's internal complaint process including penalties;
- 7-
E. the legal recourse, investigative and complaint process available through the
Illinois Department of Human Rights,and the Illinois Human Rights Commission;
F. directions on how to contact the department and commission;
G. protection against retaliation as provided by Section 6-101 of the Human Rights
Act.
A copy of the policies shall be provided by ENGINEER to the Department of Human Rights upon
request(775 ILCS 5/2-105).
26. SUBSTANCE ABUSE PROGRAM.
As a condition of this agreement, ENGINEER shall have in place a written substance abuse
prevention program which meets or exceeds the program requirements in the Substance Abuse
Prevention Public Works Project Act at 820 ILCS 265/1 et seq. A copy of such policy shall be
provided to the DIRECTOR prior to the entry into and execution of this agreement.
27. WRITTEN COMMUNICATIONS
All recommendations and other communications by the ENGINEER to the DIRECTOR and to
other participants which may affect cost or time of completion, shall be made or confirmed in
writing. The DIRECTOR may also require other recommendations and communications by the
ENGINEER be made or confirmed in writing.
-8-
28. NOTICES
All notices,reports and documents required under this Agreement shall be in writing and shall be
mailed by First Class Mail,postage prepaid,addressed as follows:
FOR THE CITY: B. As to ENGINEER:
Mike Pubentz Amy McSwane
Public Works Director Corporate Treasurer
City of Elgin Hampton, Lenzini and Renwick, Inc.
150 Dexter Court 380 Shepard Drive
Elgin,Illinois 60120-5555 Elgin,Illinois 60123
29. COMPLIANCE WITH LAWS
Notwithstanding any other provision of this Agreement it is expressly agreed and understood that
in connection with the performance of this Agreement that the ENGINEER shall comply with all
applicable Federal, State, City and other requirements of law, including, but not limited to, any
applicable requirements regarding prevailing wages, minimum wage, workplace safety and legal
status of employees. Without limiting the foregoing,ENGINEER hereby certifies,represents and
warrants to the CITY that all ENGINEER'S employees and/or agents who will be providing
products and/or services with respect to this Agreement shall be legally authorized to work in the
United States. ENGINEER shall also at its expense secure all permits and licenses,pay all charges
and fees and give all notices necessary and incident to the due and lawful prosecution of the work,
and/or the products and/or services to be provided for in this Agreement. The CITY shall have the
right to audit any records in the possession or control of the ENGINEER to determine
ENGINEER'S compliance with the provisions of this section. In the event the CITY proceeds
with such an audit the ENGINEER shall make available to the CITY the ENGINEER'S relevant
records at no cost to the CITY. ENGINEER shall pay any and all costs associated with any such
audit.
30. EXECUTION
This agreement may be executed in counterparts, each of which shall be an original and all of
which shall constitute one and the same agreement. For the purposes of executing this agreement,
any signed copy of this agreement transmitted by fax machine or e-mail shall be treated in all
manners and respects as an original document. The signature of any party on a copy of this
agreement transmitted by fax machine or e-mail shall be considered for these purposes as an
original signature and shall have the same legal effect as an original signature. Any such faxed or
e-mailed copy of this agreement shall be considered to have the same binding legal effect as an
original document. At the request of either party any fax or e-mail copy of this agreement shall be
re-executed by the parties in an original form. No party to this agreement shall raise the use of fax
machine or e-mail as a defense to this agreement and shall forever waive such defense.
- 9-
IN WITNESS WHEREOF, the parties hereto have entered into and executed this
Agreement effective as of the date and year first written above.
FOR THE CI FOR THE ENGINEER:
By -- By: 0. 11'` r f,640A-�
ity Manager Name(Print: Amv McSwane
Title: Corporate Treasurer
X
F:1L.egal DMtlAgreemenAENGINEERING AGREEMENT-FORM-clean-10-2-18.doex
- 10-
ATTACHMENT A-1
SCOPE OF SERVICES
Design Engineering
Hampton, Lenzini and Renwick, Inc.
XW.4 Civil Engineers•Structural Engineers•Land Surveyors•Environmental Specialists
www.hlrengineering.com
ATTACHMENT A-1
Larkin Avenue RRFB Design Engineering
Scope of Work
The City of Elgin would like to install a Rectangular Rapid Flashing Beacon(RRFB)and a barrier median at the uncontrolled
pedestrian crossing on Larkin Avenue at the Larkin High School entrance west of the intersection of McLean Boulevard.
Currently students from Larkin High School jaywalk across Larkin Avenue before and after school hours.Also included in the
scope is a fence along Larkin Avenue between the Larkin High School driveway and McLean Boulevard and along McLean
Boulevard from Larkin Avenue to the high school parking lot south of Larkin Avenue.
Survey
• Conduct a topographic survey sufficient to prepare RRFB and median plans. The survey will include pavement
centerlines and edges, ADA and sidewalk details; pavement markings, signs, visible utilities, visible right-of-way
monumentation and features outside the right-of-way and prepare CADD files for plan sheets.The plan sheet for the
fence will be completed using aerial mapping.
Phase II(Design)Engineering
• Engineering Plans: Engineering plans for construction will be developed and shall include; cover sheet, general
notes,summary of quantities,typical sections,roadway plan sheets,ADA details,fence plan sheets;standard details
and project specific details.
• Contract Documents and Specifications: HLR will prepare a bid document in accordance with City standards for
a local letting by the city.
• Final PSSE Documents:HLR will make the required changes to the plans,specifications and estimate documents
per review comments and submit final copies to the City.
Bidding Assistance
• Bid Advertisement:HLR will prepare the advertisement for the City in coordination with the City of Elgin Purchasing
Department.During this stage,HLR will also respond to bidder's questions and issue addenda as necessary.
• Bid Recommendation:HLR will review all bids and contractor proposals,check for errors and omissions,prepare a
bid tabulation document(s)for internal and external distribution,and make a recommendation for award.
• Bid Execution:HLR will attend the City Council meeting that has the recommended bid award on the agenda.
Deliverable:
• Preliminary and Final Plans,Specifications and Estimates
380 Shepard Drive 6825 Hobson Valley Drive,Suite 302 3065 Stevenson Drive.Suite 201 323 W.Third Street,P.O.Box 160
Elgin.Illinois 60123-7010 Woodridge.Illinois 60517 Springfield,Illinois 62703 Mt.Carmel,Illinois 62863
Tel.847.697.6700 Tel.847.697.6700 Tel.217.546.3400 Tel.618.262.8651
Fax 847.897.6753 Fax 847.697.6753 Fax 217.546.6116 Fax 618.263.3327
ATTACHMENT A-2
SCOPE OF SERVICES
Construction Administration and Oversight
- 12-
Hampton, Lenzini and Renwick, Inc.
Civil Engineers•Structural Engineers•Land Surveyors•Environmental Specialists
www.hirengineering.com
ATTACHMENT A-2
Larkin Avenue RRFB Construction Observation
Scope of Work
The City of Elgin would like to install a Rectangular Rapid Flashing Beacon(RRFB)and a barrier median at the uncontrolled
pedestrian crossing on Larkin Avenue at the Larkin High School entrance west of the intersection of McLean Boulevard.
Currently students from Larkin High School jaywalk across Larkin Avenue before and after school hours.Also included in the
scope is a fence along Larkin Avenue between the Larkin High School driveway and McLean Boulevard and along McLean
Boulevard from Larkin Avenue to the high school parking lot south of Larkin Avenue.
Below is the proposed Scope of Services for this project.
1. Contractor Document Submittals:HLR will review contractor submittals such as shop drawings and mix designs
and make recommendation to the City on their approval or rejection.
2. Project Start:HLR will coordinate construction start with the Contractor(s),the City,local businesses/residents,and
any other impacted stakeholders.
3. Project Layout:HLR will verify the layout of the improvements prior to Contractor mobilization for all work
4. Construction Observation: HLR's Resident Engineer will monitor all work being done to ensure construction is
completed according to the intent of the plans and project specifications.
a. Documentation:HLR will complete all necessary documentation on a dally basis.
b. Weekly Reports: HLR will prepare and distribute weekly reports consisting of the week's work and any
anticipated change in project schedule.
c. Contractor/Sub-consukant Submittals:HLR will review all certified payrolls and invoices to confirm accuracy.
d. Resident Coordination: HLR will update Elgin 311 with project status and includes coordination with all
residents as necessary through the project. Particular attention will be given to residents with mobility issues.
5. Project Close-out:HLR will ensure the project is closed out in a timely manner and construction is 100%complete,
a. Punch-list: HLR will prepare the final punch list with City staff,submit to the contractor,and ensure timely
completion of remaining items.
b. As-Builts:HLR will prepare any necessary as-built drawings.
c. Final Documentation:HLR will prepare and submit final pay estimates,review contractor final invoicing,and
submit Final Documentation Packet to the City
6. Follow-Up:HLR will follow up with the City to ensure the project has closed out successfully and confirm our services
are fully completed under the current agreement
Deliverables:
• Project box with all relevant Information
380 Shepard Drive 6825 Hobson Valley Drive,Suite 302 3086 Stevenson Drive,Suite 201 323 W.Third Street,P.O.Box 160
Elgin,Illinois 60123-7010 Woodridge,Illinois 60517 Springfield,Illinois 62703 Mi.Carmel,Illinois 62863
Tel.847.697.6700 Tel.847.697.6700 Tel.217.546.3400 Tel.618.262.8651
Fax 847.697.6753 Fax 847.697.6753 Fax 217.546.8116 Fax 818.283.3327
ATTACHMENT B
PROJECT SCHEDULE
City of Elgin — Hampton, Lenzini and Renwick, Inc.
Larkin Ave Pedestrian Crossing Project Schedule
1. City Council Approval—February 9th 2022
2. Formal Notice to Proceed—February 24112022
3. Design Engineering Services—February 24—April 2912022
4. Bid Letting—Anticipated for May of 2022
5. Construction Oversight—June/July 2022
6. Estimated Project Completion Date—July 31512022
ATTACHMENT C-1
FEE ESTIMATE
Design Engineering
- 14-
City of Elgin
ULR RRFB for Larkin Avenue at Larkin High School Entrance
Design Engineering Scope of Services
HLR proposes to provide design services for the installation of a Rectangular Rapid Flash Beacon(RRFB)system for pedestrians
dossing Larkin Avenue at Larkin High School as"Yes a fence along Larkin Avenue and McLean Avenue. It is assumed that this
location Is suitable for a self-contained solar powered system with battery backup and the design shall be for such a system.
Task Description Hours by Employee classification
1. Design Engineering
a.Topographic survey of crossing location(scan
a�proeessinp],__ _ _ a a a $ 1,950.00
b.Evaluate solar del location 22 $ 660.00
c.Plan sheets(6 sheets) 12 36 4 12 $ 9,360.00
d.ADA Details 10 $ 1.500.00
e. Standard Details 4 16 $ 3,100.00
f.Quantitiesand-Estimate of Cost 2 4 $ 950.00
g, Specifications - -- 2 4 $ 950.00
h.Consultatio- coordinai on withty a Cind_utilitie_s —4—2 $ 1,000.00
1.Project administration 5 $ 975.00
Design Sub-Total= 7 26 74 4 12 8 8 0 $ 20p435.00
11. Bidding Assistance
a.Compile bid documents 6 6 2 $_2,110.00
b.Coordination with City of Erin Finance Office 3 $_ _585.00
c.Quality ControllQuailtyAssurance 8 $ 1,400.00
Bidding Assistance Sub-Total= 3 14 6 0 0 0 0 2 $ 4,095.00
Subtotals Engineering Hours S Fee= 10 40 80 4 12 8 a 2 $ 24,630.00
TOTAL FEE= $ 24,630.00
ATTACHMENT C-2
FEE ESTIMATE
Construction Administration and Oversight
- 15 -
INK
B City of Elgin
RRFB for Larkin Avenue
at Larkin High School Entrance
Construction Observation
Anticipated Scope of Services
Task Hours by
Employee
Description Classification
E6 E2 Eft
I. Construction Observation
a. Pre-construction meeting, prepare for,attend and write meeting
minutes 1 2 $ 435.00
b. Shop drawing,catalog cut reviews 1 $ 120.00
c. Verify Construction Layout 4 $ 480.00
d. Construction Observation 64 $ 7,680.00
_ e. Punchlist and Final Inspection 1 $ 120.00
f. Final agreement of quantities 4 $ 480.00
g. Final documentation&job box submittal 2 $ 240.00
Task II Sub Total= 1 78 $ 9,556.00
II. Coordination and Project Administration
a. Coordination with City _ 2 $ 390.00
b. Prepare and Attend Kick-off Meeting with City 1 1 $ 315.00
b. Project administration(account setup,resource scheduling,
budgeting, invoicing)and QC/QA. 3 $ 585.00
Task II Sub-Total= 6 1 $ 1,290.00
Subtotals Engineering Hours&Fee= 7 79 $ 10,846.00
TOTAL FEE= $10,846.00
ATTACHMENT D
Overall Project Location
- 16-
LOCATION
LARKIN AVENUE • ' •SED MID-BLOCK CROSSING
MID-
BLOCKtARKIN '.
ey
LARKIN HIGH
��.sdv;x q rR' � • s
SCHOOL
• 14� Ilk.
ATTACHMENT A
r--- I
R1®5
W 11-2 W 11-2
W16-9P RRFB R1-5B •
W 16-7P
CEwoo
+" '�-sfs�, �. _ ... -- '�N le•+""V •'Y " ++ ++++mot
25a �` c_" �=' �t E --PROPOSED FENCE
3
I ss
"� l , ✓ LARMN HIGH SCHOOL
AHM
ATTACHMENT C
nt, .i�NKY.AVENUE
• >w>z mob. ,„., „ �� ,.� 1— •— CITY DEXTER ELO D —
. EL��Rp l PROPOSED MDBLOCK P®ESTRWI CROSSING f