HomeMy WebLinkAbout22-209 Resolution No. 22-209 RESOLUTION AUTHORIZING EXECUTION OF A CHANGE ORDER NO. 1 WITH ALAMP CONCRETE CONTRACTORS, INC. FOR THE 2022 CENTRAL AREA RESURFACING PROJECT (BID NO. 22-023) WHEREAS,the City of Elgin has heretofore entered into a contract with ALamp Concrete Contractors, Inc. for the 2022 central area resurfacing project(Bid No. 22-023); and WHEREAS,it is necessary and desirable to modify the terms of the contract as is described in Change Order No. 1 attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN,ILLINOIS,that Richard G.Kozal,City Manager,be and is hereby authorized and directed to execute Change Order No. 1, a copy of which is attached hereto and made a part hereof by reference. s/David J. Kaptain David J. Kaptain, Mayor Presented: December 7, 2022 Adopted: December 7, 2022 Omnibus Vote: Yeas: 9 Nays: 0 Attest: s/Kimberly Dewis Kimberly Dewis, City Clerk T y City of Elgin Change Order not ELGIN,ILLINOIS PROJECT: Elgin Project No. 339759/MFT Section No.22-00194-00-RS . CHANGE ORDER No. 1 AND FINAL CONTRACT: 2022 Central Area Resurfacing Project(Bid No. 22-023) SCOPE: This change order adds charges for additional work performed. This was a unit price Contract; therefore, the Contractor was paid based on the actual completed work and quantities for each installed item. An additional pay item is now being was added which was not part of the original contract. Be- cause this is the Final change order for this contract, unused pay item costs are shown as deductions to the contract amount. The additional work performed includes: • The removal and replacement of all combination curb and gutter on Hiawatha Dr, due to the conditions of the previously existing combination curb and gutter. • The replacement of pavement adjacent to Congdon Ave, as required under the permit issued by the Cook County Department of Transportation and Highways(CCDOTH). • The replacement of sidewalk at the intersection of Hiawatha Dr and Congdon Ave, as required under the permit issued by the CCDOTH. • The installation of cast iron detectable warnings at sidewalk crossings at the intersection of Hia- watha Dr and Congdon Ave, as required by the CCDOTH. This work item was not included in the original contract pay items and was submitted to the City by the contractor in the form of an Agreed Unit Price(AUP) quotation. • The additional quantities relating to the removal and replacement of Hot Mix Asphalt(HMA) on Hiawatha Dr due expanded project limits. • The removal and replacement of the driveway apron at 1036 St. John St, which was damaged during an unrelated water service line repair at this address. REASONS FOR CHANGE: Additional work was performed at the request of the City due to cost additions and deductions due to variations in actual quantities supplied versus originally planned and anticipated quantities. The circumstances said to necessitate the change in performance were not reasonably foreseeable at the time the contract was signed. The changes germane to the original contract as signed, and this change order is in the best interests of the City of Elgin and is authorized by law. SUMMARY OF CHANGES IN CONTRACT AMOUNT: ORIGINAL CONTRACT AMOUNT: $817,381.20 CHANGE ORDER No. 1 Pay Item# Pay Item Description 1 Tree Root Pruning ($350.00) 3 Removal and Disposal of Unsuitable Material ($13,830.00) 4 Sodding, Salt Tolerant $12,474.00 5 Inlet and Pipe Protection ($60.00) 6 Aggregate Subgrade Improvement ($13,830.00) 8 Preparation of Base ($13,332.50) 9 Aggregate Base Repair ($6,585.00) 12 Hot-Mix Asphalt Binder Course, IL-19.0,N50 $46,647.00 13 Hot-Mix Asphalt Surface Course,Mix'D', IL-9.5,N50 $19,275.84 14 Portland Cement Concrete Driveway Pavement, 6 Inch $7,238.00 15 Portland Cement Concrete Sidewalk 4 Inch $7,288.40 16 Portland Cement Concrete Sidewalk 6 Inch $2,199.50 17 Detectable Warnings ($3,000.00) 18 Driveway Pavement Removal $720.00 19 Combination Curb and Gutter Removal $10,158.40 20 Sidewalk Removal $1,190.25 21 Class D Patches,Type I, 5 Inch ($4,455.00) 22 Class D Patches, Type II, 5 Inch ($5,175.00) 23 Class D Patches, Type III, 5 Inch ($7,200.00) 24 Class D Patches, Type IV, 5 Inch $6,840.00 25 Frames and Lids,Type 1, Open Lid ($870.00) 26 Frames and Lids,Type 1, Closed Lid ($1,305.00) 27 Combination Concrete Curb and Gutter, Type B-6.18 $70,746.00 33 Thermoplastic Pavement Marking-Line 4" $2.85 34 Thermoplastic Pavement Marking- Line 6" $3.30 36 Thermoplastic Pavement Marking-Line 24" $19.80 37 Clearing and Grubbing ($1,125.00) 38 Hot-Mix Asphalt Surface Removal,Variable Depth $6,404.70 39 Temporary Access (Private Entrance) ($200.00) 40 Temporary Access (Commercial Entrance) ($150.00) 41 Temporary Access (Road) ($3,600.00) 42 Frames and Lids to be Adjusted(Special) ($4,200.00) 43 Hot-Mix Asphalt Driveway Pavement, 3" ($1,530.00) 45 Drainage&Utility Structures to be Adjusted ($2,100.00) 46 Drainage &Utility Structures to be Reconstructed ($14,400.00) AUP No.1 —Cast Iron ADA Detectable Warnings $3,290.00 Contingency for minor close out items $10,000.00 TOTAL FOR CHANGE ORDER NO. 1: ADD $107,200.54 PREVIOUS CHANGE ORDERS:NONE $0.00 TOTAL OF PREVIOUS CHANGE ORDERS: ADD $0.00 TOTAL REVISED CONTRACT AMOUNT: $924,581.74 The original amount of the contract with ALamp Concrete Contractors, Inc. is $817,381.20. Change Or- der No. 1 and Final will increase the original contract amount by a total of$107,200.54, that sum repre- senting thirteen point one percent (13.1%) of the original contract amount. The new contract amount, inclusive of all change orders is $924,581.74. OTHER CONTRACT PROVISIONS: All other contract provisions remain the same. CHANGE ORDER No. 1 AND FINAL November 16,2022 Agreed to this 7 day of December , 2022. Recommended by: Engineering Department By: Mike Pubentz Title: Public Works Director Date: November 14, 2022 Signature: / i2 Accepted by: ALamp Concrete Contractors,Inc. Party of the Second Part(Contractor) By: Anthony lacullo Title: Project Manager Date: 11/14/22 Signature: 4Ge7 Approved by: CITY OF ELGIN Party of the First Part(Owner) By: Richard G. Kozal Title: City Manager Date: Decemb 2022 Signature: Legal Dept\Agreement\2022 Central Area Resurf-Change Order Nol Form Final Draft 2022.11.04.docx